MDOT let 9 contracts worth $131M at the low bid, with 1.89 bidders per contract (the 12-month average is 3.70). Eutaw Construction Company, Inc. won the most, $81.0M; 5 firms won at least one contract. The closest finish: Grade, Drain, Bridge, & Pave 4-Lane approximately 9 miles of APD Corridor "V" be, decided by 1.2% ($960K). MDOT later rejected the bids on 2 more contracts from this letting and re-let them.
| Call | Contract | Low bidder | Low bid | Second | Gap | Bidders | vs. estimate |
|---|---|---|---|---|---|---|---|
| 1 | Grade, Drain, Bridge, & Pave 4-Lane approximately 9 miles of APD Corridor "V" between Fairview & SR 23, known as FederalItawamba · Bridge repair & rehab · 102076301 | Eutaw Construction Company, Inc.2nd: W. G. Yates & Sons Construction Company | $81.0M | $81.9M | 1.2% | 3 | +9.7% |
| 3 | Mill & Overlay approximately 8 miles of I-22 from Lee County Line to SRItawamba · Overlay & resurfacing · 107298301 | APAC - Mississippi, Inc. | $10.5M | – | – | 1 | +5.2% |
| 7 | Overlay approximatelyNewton · Overlay & resurfacing · 107829301 | W. E. Blain & Sons, Inc. | $9.9M | – | – | 1 | +6.0% |
| 10 | Construction project, DeSoto CountyDeSoto · Construction & widening · 107114301 | Tanner Construction Company, Inc.2nd: Xcavators, Inc. | $7.9M | $8.0M | 1.8% | 3 | −12.3% |
| 9 | Mill & Overlay approximately 13 miles on SR 16 from SR 39 to USKemper · Overlay & resurfacing · 107628301 | APAC - Mississippi, Inc.2nd: Falcon Contracting Company, Inc. | $6.5M | $7.2M | 10.3% | 2 | +4.9% |
| 5 | Mill & Overlay approximately 8 miles of US 82 from 0.5 miles East of Catapala Creek to USLowndes · Overlay & resurfacing · 107779301 | APAC - Mississippi, Inc.2nd: Falcon Contracting Company, Inc. | $5.7M | $5.8M | 1.8% | 2 | +4.4% |
| 2 | Mill & Overlay approximately 4 miles of I-22 from 7.4 Miles East of Benton CL to SRUnion · Overlay & resurfacing · 107826301 | APAC - Mississippi, Inc. | $5.1M | – | – | 1 | +1.2% |
| 4 | Overlay approximatelyCovington · Overlay & resurfacing · 107617301 | W. E. Blain & Sons, Inc.2nd: Dunn Roadbuilders, LLC | $2.2M | $2.5M | 16.0% | 2 | −34.5% |
| 11 | Remove & Replace OGFC Lift on I-55 from 0.5 miles South of SR 6 to 1.8 Miles North of SRPanola · Overlay & resurfacing · 108097301 | Lehman-Roberts Company2nd: Double T Construction, LLC | $1.8M | $3.4M | 85.6% | 2 | +2.9% |
| Call | Contract | Low bidder | Low bid | Bidders | vs. estimate | Re-let |
|---|---|---|---|---|---|---|
| 6 | Construction project, Hinds CountyHinds · 107878301 | Century Construction Group, Inc. | $1.7M | 2 | +32.9% | Apr 28, 2020 |
| 8 | Bridge Replacements on SRLeake · 103334301 | T. L. Wallace Construction, Inc. | $14.0M | 2 | +40.5% | Apr 28, 2020 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew.