16 counties run from the Tupelo office: Alcorn, Chickasaw, Choctaw, Clay, Itawamba, Lee, Lowndes, Monroe, Oktibbeha, Pontotoc, Prentiss, Tippah, Tishomingo, Union, Webster, Winston. District 1 let 14% of Mississippi's highway dollars over the last three years, fourth of six districts.
Over the last three years W. G. Yates & Sons Construction Company won 42% of the district's dollars, followed by APAC - Mississippi, Inc. (20%) and Cook & Son, LLC (10%). 54 firms bid here and 22 won at least once.
| Firm | Bids | Wins | Win rate | Awarded | Share | Median margin when winning |
|---|---|---|---|---|---|---|
| W. G. Yates & Sons Construction CompanyJackson | 1 | 1 | 100% | $195M | 41.7% | 17.2% |
| APAC - Mississippi, Inc.Richland | 35 | 12 | 34% | $92.7M | 19.8% | 7.9% |
| Cook & Son, LLCSmithville | 29 | 7 | 24% | $45.9M | 9.8% | 4.0% |
| Falcon Contracting Company, Inc.Columbus | 20 | 8 | 40% | $43.4M | 9.3% | 9.6% |
| WG Construction Company, Inc.Ripley | 22 | 10 | 45% | $34.2M | 7.3% | 5.4% |
| Ste-Bil Grading Inc.Waterford | 11 | 4 | 36% | $16.3M | 3.5% | 3.1% |
| Talbot Brothers Contracting Co., Inc.Nesbit | 16 | 6 | 38% | $9.9M | 2.1% | 12.2% |
| Phillips Contracting Co., Inc.Columbus | 14 | 5 | 36% | $8.9M | 1.9% | 20.4% |
| Century Construction Group, Inc.Tupelo | 22 | 5 | 23% | $6.0M | 1.3% | 11.8% |
| Key, LLCMadison | 13 | 2 | 15% | $2.6M | 0.5% | 11.6% |
| Riverside Traffic Systems, Inc. | 7 | 5 | 71% | $2.3M | 0.5% | 45.6% |
| Warren Paving, Inc.Hattiesburg | 1 | 1 | 100% | $2.2M | 0.5% | 1.2% |
| GeoStabilization International, LLCGrand Junction | 1 | 1 | 100% | $1.8M | 0.4% | 12.6% |
| Gibson & Associates, Inc.Balch Springs | 12 | 1 | 8% | $1.5M | 0.3% | 18.6% |
| Flagstar Construction Company, Inc.Brandon | 2 | 2 | 100% | $1.2M | 0.3% | 0.3% |
| County | Contracts | Awarded | Bidders / contract | Single-bid | Low vs. estimate |
|---|---|---|---|---|---|
| Tippah | 5 | $199M | 4.20 | 0% | −9.7% |
| Pontotoc | 9 | $38.9M | 3.56 | 22% | −14.6% |
| Lowndes | 8 | $33.9M | 3.13 | 13% | +5.0% |
| Alcorn | 10 | $29.3M | 3.90 | 0% | −8.7% |
| Union | 7 | $26.0M | 5.00 | 0% | −16.1% |
| Monroe | 6 | $24.1M | 3.33 | 17% | +2.3% |
| Oktibbeha | 3 | $21.9M | 2.67 | 0% | −7.6% |
| Prentiss | 5 | $17.2M | 3.80 | 0% | −21.0% |
| Winston | 4 | $16.5M | 2.75 | 0% | +9.8% |
| Lee | 11 | $15.6M | 4.18 | 9% | −6.5% |
| Tishomingo | 7 | $13.5M | 4.14 | 0% | −10.7% |
| Itawamba | 7 | $11.7M | 2.86 | 14% | −3.3% |
| Chickasaw | 2 | $8.2M | 3.50 | 0% | −15.7% |
| Choctaw | 2 | $5.5M | 3.00 | 50% | −21.9% |
| Clay | 1 | $4.6M | 2.00 | 0% | +9.0% |
| Webster | 1 | $814K | 3.00 | 0% | +1.2% |
| Work type | Contracts | Awarded | Bidders / contract | Low vs. estimate |
|---|---|---|---|---|
| Overlay & resurfacing | 36 | $209M | 3.17 | −5.7% |
| Construction & widening | 12 | $209M | 3.42 | +0.2% |
| Bridge repair & rehab | 17 | $20.7M | 4.82 | −9.4% |
| Bridge replacement | 3 | $11.0M | 4.67 | −18.3% |
| Intersections & safety | 8 | $16.9M | 1.75 | −0.9% |
| Buildings & other | 1 | $853K | 1.00 | +9.0% |
| Let | Contract | Low bidder | Low bid | Bidders | Gap to 2nd | vs. estimate |
|---|---|---|---|---|---|---|
| Oct 27, 2026 | Installation of Audible Stripe on MS 350 from MS 2 to CR 100Alcorn · Intersections & safety | Riverside Traffic Systems, Inc. | $187K | 2 | 91.2% | +2.2% |
| Oct 27, 2026 | Installation of Audible Stripe, Raised Pavement Markers and Sign Improvements on MS 336 from US 278 to ApostolPontotoc · Intersections & safety | Riverside Traffic Systems, Inc. | $335K | 1 | – | −8.0% |
| Oct 27, 2026 | Installation of Audible Stripe, Raised Pavement Markers and Sign Improvements on MS 363 from the Lee County LiItawamba, Lee · Intersections & safety | Riverside Traffic Systems, Inc. | $634K | 2 | 0.0% | −3.3% |
| Sep 22, 2026 | Bridge Repair on SR 348 over Kings Creek (Bridge No. 0.9)Union · Bridge repair & rehab | Phillips Contracting Co., Inc. | $140K | 6 | 35.9% | −22.6% |
| Sep 22, 2026 | Bridge Removal on SR 373 (Bridge Nos. 9.9 & 10.3)Lowndes, Monroe · Bridge repair & rehab | Xcavators, Inc. | $716K | 6 | 6.9% | +9.3% |
| Sep 22, 2026 | Restricted crossing U-Turn (RCUT) on US 82 at Sturgis-Maben Road & Mill & Overlay approximately 7.3 miles of UOktibbeha · Overlay & resurfacing | Cook & Son, LLC | $11.5M | 4 | 0.2% | −9.1% |
| Sep 22, 2026 | Bridge Repair on US 45 over Norfolk Southern Railroad (Bridge Nos. 275.6A & 275.6B)Alcorn · Bridge repair & rehab | Phillips Contracting Co., Inc. | $974K | 7 | 16.3% | −9.4% |
| Aug 25, 2026 | Overlay approximately 2.9 miles of MS 354 from the junction of MS 15 to the end of state maintenanceTippah · Overlay & resurfacing | WG Construction Company, Inc. | $1.0M | 3 | 5.2% | +2.2% |
| Aug 25, 2026 | SR 145 Bridge Replacement (Bridge No. 210.8), Known as Federal Aid Project No. STBG-0053-01(017) / 109074301 iLee · Bridge replacement | Ste-Bil Grading Inc. | $1.5M | 8 | 0.9% | −18.3% |
| Jul 28, 2026 | Bridge Repair on MS 4 over Tenn-Tom Waterway (Bridge No. 158.5)Tishomingo · Bridge repair & rehab | Century Construction Group, Inc. | $2.7M | 8 | 11.8% | −25.4% |
| Jul 28, 2026 | Traffic Signal and Interchange Modifications on US 45 & US 278Lee · Construction & widening | Cook & Son, LLC | $1.5M | 5 | 9.9% | +9.6% |
| Jun 30, 2026 | Mill & Overlay approximately 6 miles of MS 348 from the Union County Line to just west of US 45Lee · Overlay & resurfacing | APAC - Mississippi, Inc. | $2.5M | 5 | 11.7% | −9.6% |
| Jun 23, 2026 | District 1 Placement of Raised Pavement Markers on various routes throughout the DistrictDistrictwide · Construction & widening | Arkansas Sign & Barricade, Inc. | $592K | 3 | 1.7% | −30.0% |
| Jun 12, 2026 | Emergency Slide Repair on SR 178 approximately 0.66 miles south of CR 121Union · Construction & widening | GeoStabilization International, LLC | $1.8M | 4 | 12.6% | +6.9% |
| Jun 5, 2026 | Mill & Overlay approximately 9 miles of SR 25 from US 45A to US 45Monroe · Overlay & resurfacing | Falcon Contracting Company, Inc. | $4.4M | 2 | 7.8% | +10.0% |
| Letting | County | Route | Scope | Description |
|---|---|---|---|---|
| November 2026 | Pontotoc | Median Installation | US 278 at MS 342/ Black Zion Road - Directional Median - State Forces | |
| November 2026 | Itawamba | I 22 | Bridge Preventive Maintenance | I-22 bridge preventative maintenance(Bridge #s 105.9A and 105.9B)Remove Joint at Bent 5 & Replace with Preformed Joint, Rebuild Blockout at |
| November 2026 | Tishomingo | US 72 | Concrete Repair | US 72 From SR 25 to Alabama State Line |
| November 2026 | Tishomingo | US 72 | Bridge Repair | US 72 over MS 25 (Bridge #s 84.9 A & 84.9 B) |
| November 2026 | Lee | Building Construction | Construction of Lee Co. Bulk Salt Storage Building | |
| December 2026 | Districtwide | Storm Damage | District 1 Emergency Maintenance Contract | |
| January 2027 | Tishomingo | MS 25 | Bridge Replacement | SR 25 BTW SR 4 and CR 23 (189.3) |
| January 2027 | Choctaw | MS 15 | Mill & Overlay | MS 15 from Winston County Line to MS 12 |
| January 2027 | Monroe | US 45 | Bridge Repair | US 45 Repair (Bridges 186.8A & 186.8B) |
| January 2027 | Lee | I 22 | ITS - Intelligent Transportation Systems | I-22 from the Pontotoc County Line to the Western City Limits of Tupelo |
| January 2027 | Pontotoc | I 22 | ITS - Intelligent Transportation Systems | I-22 from the Lee County Line to the Union County Line |
| January 2027 | Union | I 22 | ITS - Intelligent Transportation Systems | I-22 within the City Limits of New Albany |
| January 2027 | Union | I 22 | ITS - Intelligent Transportation Systems | I-22 from the Pontotoc County Line to the Southern City Limits of New Albany and I-22 from the Northern City Limits of New Albany to the Ben |
| January 2027 | Union | MS 9 | Scrub Seal & Overlay | MS 9 from MS 348 to MS 30 |
| February 2027 | Chickasaw | Bridge Repair | MS 15 & MS 32 (Bridge #s 256.1 & 145.8) | |
| February 2027 | Lowndes | Bridge Repair | MS 182, MS 69, US45/US82, US 45A, US 82 (Bridge #s 8.1, 0.7, 161.6A, 161.1B, 156.0A, & 179.0B) | |
| February 2027 | Monroe | Bridge Repair | MS 25, US 278 & US 45A (Bridge #s 118.7, 21.9, 21.2, & 193.8A) | |
| February 2027 | Pontotoc | MS 9 | Mill & Overlay | MS 9 from MS 341 to MS 15 and MS 770 from MS 338 to MS 15 |
| February 2027 | Lee | Building Construction | Lee Co Maint & Float Crew Bldg | |
| February 2027 | Lee | Lot Improvement | Lee Co Maint & Float Crew Bldg Site Improvements | |
| February 2027 | Lee | Building Construction | Construction of Lee Co Maint Equipment Shed | |
| February 2027 | Lee | Building Improvements | Renovation of Material Storage Building | |
| April 2027 | Prentiss | MS 145 | Bridge Replacement | SR 145 Bridge Replacements (#s 245.1 and 245.2) |
| April 2027 | Tishomingo | MS 25 | Bridge Replacement | SR 25 Bridge Replacement (#221.3) |
| April 2027 | Monroe | MS 25 | Bridge Repair | MS 25 over Fuller Creek (Bridge # 113.8) |
| April 2027 | Lee | MS 145 | Mill & Overlay | SR145 From West of US 45A To Tupelo City Limits |
| May 2027 | Districtwide | Bridge Preventive Maintenance | I-22 bridge preventative maintenance (Bridge #s 102.8A, 102.8B, 109.4A, and 109.4B) - Replace Bearings, Joint Sealing, Cap Cleaning | |
| May 2027 | Lee | MS 178 | Bridge Replacement | SR 178 bridge replacement (#92.6 & 92.3) |
| May 2027 | Alcorn | Bridge Repair | US 72 over Bridge Creek and Harper Road over US 45 (Bridge #s 66.0 & 272.9) | |
| May 2027 | Clay | MS 50 | Mill & Overlay | MS 50 From Begin Old Hwy 10 to the End Of State Maintenance West of US 45A |
| May 2027 | Winston | MS 397 | Overlay | MS 397 from just North of Garrigues Road to MS 14 |
| June 2027 | Lee | MS 145 | Intersection Improvements | SR 145 from 500 feet South of Industrial Park Road to 500 feet North of Bauhaus Drive |
| June 2027 | Lee | US 45 | Restricted Crossing U-Turn (RCUT) | US 45 at Robison/ Mitchell |
| June 2027 | Itawamba | Bridge Repair | D1 - Pile/Encasement Repair Project (13 Bridges) | |
| June 2027 | Districtwide | Bridge Repair | D1 - Pile/Encasement Repair Project (19 Bridges) - Lee - Pontotoc - Tippah - Tishomingo - Union Counties | |
| June 2027 | Choctaw | MS 413 | Bridge Repair | SR 413 (Bridge # 0.8) - D1 Pile/Encasement Repair |
| June 2027 | Clay | Bridge Repair | MS 46 & MS 50 (Bridge #s 11.5, 12.6, 63.2, 52.6, 67.1, & 67.3) - D1 Pile/Encasement Repair | |
| June 2027 | Winston | Bridge Repair | MS 397 & MS 490 (Bridge #s 18.1, 18.2, & 17.6) - D1 Pile/Encasement Repair | |
| June 2027 | Clay | US 45A | Fog Seal | US 45 ALT from Lowndes County Line to Beginning of 5-Lane and US 45 ALT from beginning of 4 Lane Divided to Monroe County Line |
| June 2027 | Monroe | US 45A | Fog Seal | US 45 ALT from Clay County Line to 1 mile north of MS 25 |
| June 2027 | Chickasaw | US 45A | Fog Seal | US 45 ALT from Monroe County Line to Monroe County Line |
| June 2027 | Monroe | US 45A | Fog Seal | US 45 ALT from South of MS 8 to Chickasaw County Line |
| July 2027 | Alcorn | US 72 | Realignment | US 72 @ Liddon Lake Road |
| July 2027 | Winston | MS 15 | Mill & Overlay | SR15/25 From South of Old Robinson Road to Choctaw County |
| July 2027 | Union | I 22 | Bridge Repair | I-22 over Okannattie Creek(Bridge #s 71.8A & 71.8B) |
| July 2027 | Itawamba | MS 25 | Mill & Overlay | MS 25 from Benson Jones Road to MS 76 |
| August 2027 | Tippah | MS 15 | Bridge Repair | MS 15 over Hurricane Creek (Bridge # 329.3) |
| September 2027 | Tippah | MS 4 | Bridge Replacement | SR 4 Bridge Replacement (#112.7) |
| September 2027 | Oktibbeha | US 82 | Restricted Crossing U-Turn (RCUT) | US 82 at County Lake Road |
| October 2027 | Tishomingo | MS 172 | Bridge Replacement | SR 172 Bridge Replacement (#3.8) |
| October 2027 | Tishomingo | MS 25 | Bridge Replacement | SR 25 Bridge Replacement (#198.8) |
Source: MDOT Schedule of Proposed Projects, Nov 21, 2026.
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. * 2026 through 2026-10-27.
BidCrew shows who bought plans, how each competitor prices this district, and a predicted low bid for every upcoming contract.