MDOT let 11 contracts worth $56.9M at the low bid, with 4.64 bidders per contract (the 12-month average is 3.70). Chris Albritton Construction Company, Inc. won the most, $25.1M; 10 firms won at least one contract. The closest finish: Widening on I-10 at MS 605 WB Ramp, decided by 1.5% ($20K). MDOT later rejected the bids on 1 more contract from this letting and re-let it.
| Call | Contract | Low bidder | Low bid | Second | Gap | Bidders | vs. estimate |
|---|---|---|---|---|---|---|---|
| 4 | Bridge Replacement on SR 28 between Copiah County Line & Pinola (Bridge Nos. 72.7 & 73.6) & over Tanyard Creek (Bridge NSimpson · Bridge replacement · 106971301 | Chris Albritton Construction Company, Inc.2nd: Cotton Creek Transport, Inc. | $25.1M | $29.5M | 17.8% | 4 | +34.6% |
| 8 | Bridge Repair on SR 16/SR 149 over SR 3 & Yazoo River (Bridge No. 203.3)Yazoo · Bridge repair & rehab · 108865301 | Century Construction Group, Inc.2nd: Ste-Bil Grading Inc. | $6.7M | $7.3M | 8.5% | 5 | −5.0% |
| 7 | Intersection Improvements on MS 42 from I-59 to Sunrise RoadForrest · Intersections & safety · 109338301 | Warren Paving, Inc.2nd: T. L. Wallace Construction, Inc. | $6.6M | $6.8M | 3.5% | 3 | −4.6% |
| 10 | Thin Lift Overlay approximately 10.2 miles of MS 467 from beginning of maintenance to South of EdwardsHinds · Overlay & resurfacing · 110008301 | A J Construction, Inc.2nd: APAC - Mississippi, Inc. | $4.3M | $4.4M | 1.5% | 3 | −1.7% |
| 9 | Micro-Surface approximately 14 miles of SR 512 & SR 513Clarke · Construction & widening · 109991301 | T. L. Wallace Construction, Inc.2nd: Vance Brothers, LLC | $3.8M | $4.8M | 24.4% | 2 | −13.2% |
| 2 | Bridge Repair on MS 4 over Tenn-Tom Waterway (Bridge No. 158.5)Tishomingo · Bridge repair & rehab · 110038301 | Century Construction Group, Inc.2nd: Gibson & Associates, Inc. | $2.7M | $3.0M | 11.8% | 8 | −25.4% |
| 6 | Bank Stabilization on SR 12 over Big Black River (Bridge No. 83.4)Holmes, Attala · Bridge repair & rehab · 108287301 | Wilco, Inc.2nd: Joe McGee Construction Company, Inc. | $2.7M | $2.9M | 7.7% | 10 | −20.1% |
| 1 | Traffic Signal and Interchange Modifications on US 45 & US 278Lee · Construction & widening · 109902301 | Cook & Son, LLC2nd: J. M. Duncan, Inc. | $1.5M | $1.7M | 9.9% | 5 | +9.6% |
| 3 | Widening on I-10 at MS 605 WB RampHarrison · Construction & widening · 109879301 | Necaise Brothers Construction Co., Inc.2nd: Southern Colonial Construction LLC | $1.4M | $1.4M | 1.5% | 3 | +4.3% |
| 11 | Building Improvements at MDOT Parking Garage DowntownHinds · Buildings & other · 503889301 | Python Corporation2nd: Chris Albritton Construction Company, Inc. | $1.2M | $1.4M | 23.0% | 4 | +9.6% |
| 5 | Bridge Repair on US 98 over I-59 (Bridge No. 149.1)Lamar · Bridge repair & rehab · 109669301 | Key, LLC2nd: Hemphill Construction Company, Inc. | $956K | $1.0M | 9.9% | 4 | +8.7% |
| Call | Contract | Low bidder | Low bid | Bidders | vs. estimate | Re-let |
|---|---|---|---|---|---|---|
| 4 | Bridge Replacement on SR 28 between Copiah County Line & Pinola (Bridge Nos. 72.7 & 73.6) & over Tanyard Creek (Bridge NSimpson · 100881301 | Chris Albritton Construction Company, Inc. | $25.1M | 4 | +34.6% | Oct 27, 2026 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew.