Every MDOT contract let since 2020: how much work there is, where it is, who wins it, what it costs, and what is coming next. Built for the people who decide what a highway contractor bids.
160 contracts, up 5% in dollars from the 12 months before ($1.00B on 147 contracts). The median contract is $3.0M.
The field was thinnest in 2022: 2.34 bidders a contract and 37% of contracts drew one bid. In the last 12 months, 13% were single-bid.
Single-bid contracts landed a median 7% above MDOT's estimate; with six or more bidders, 14% below. Knowing who will show up is worth more than any unit price.
The BidCrew Mississippi Bid Price Index (188 pay items) peaked at 147 in 2026 and stands at 147. Superpave 9.5-mm ST asphalt went from $97.24 a ton in 2020 to $157 in the last 12 months.
APAC - Mississippi, Inc. (13%), T. L. Wallace Construction, Inc. (11%), W. G. Yates & Sons Construction Company (9%). 137 firms won at least one contract.
That is the last 12 months. The median gap between first and second was 6.9%, down from 10.0% the year before as fields grew.
The most of any district. The thinnest fields are in District 6 (Hattiesburg): 2.49 bidders a contract and 18% single-bid.
Since 2020. 60% were single-bid, with low bids a median 24% above the estimate. Re-letting rarely saved money: the new low bid came in a median 0.8% lower, and the same firm won again 60% of the time.
Through October 2027. 93 are overlay and resurfacing, 86 are bridge work. The busiest month is January 2027 with 47 projects.
Counties shaded by what MDOT let there. Pick a district to zoom in, then a county to see who won its work. Contracts that span several counties count in each, with the dollars split between them.
MDOT let $853M a year on average from 2020 through 2025. The total swings with a handful of large jobs: in the last three years, contracts of $20 million and up were 6% of the count and 50% of the dollars.
| Contract size | Contracts | Awarded | Bidders / contract | Single-bid | Low vs. estimate | Gap to 2nd |
|---|---|---|---|---|---|---|
| Under $1M | 102 | $54.0M | 3.47 | 13% | −8.0% | 10.5% |
| $1M–$5M | 215 | $598M | 3.19 | 10% | −8.8% | 9.7% |
| $5M–$20M | 111 | $998M | 2.88 | 22% | −4.6% | 4.4% |
| $20M and up | 25 | $1.65B | 2.80 | 16% | +5.3% | 7.9% |
Bidders per contract fell to 2.34 in 2022, when 37% of contracts drew a single bid and low bids ran a median 0.6% above MDOT's estimate. Since then the field has rebuilt to 3.62 in 2026 so far.
More bidders means lower prices, and the effect is steady: across 1,003 contracts, each additional bidder lowers the low bid by about 4.0% relative to the estimate.
| Work type | Contracts | Awarded | Median size | Bidders / contract | Single-bid | Low vs. estimate | Gap to 2nd |
|---|---|---|---|---|---|---|---|
| Overlay & resurfacing | 184 | $1.00B | $4.2M | 2.67 | 16% | −8.2% | 6.6% |
| Construction & widening | 112 | $1.13B | $1.8M | 3.13 | 12% | −7.5% | 10.6% |
| Bridge repair & rehab | 89 | $506M | $1.0M | 4.07 | 8% | −4.5% | 9.7% |
| Bridge replacement | 26 | $413M | $8.1M | 4.50 | 8% | −2.3% | 5.7% |
| Intersections & safety | 30 | $232M | $3.0M | 2.43 | 27% | −5.6% | 6.1% |
| Buildings & other | 12 | $18.9M | $922K | 2.92 | 25% | +7.3% | 15.3% |
Over the last three years 137 firms won at least one MDOT contract, but the top three took 32% of the dollars. Large jobs drive most of that: a single interstate or bridge contract can move a firm's share by several points in a year.
The gap between the low bid and the second bid is what the winner could have added and still won. Over the last three years the median gap was 8.6%; a quarter of contracts were decided by less than 3.5%.
When a project comes back to a later letting within 18 months, MDOT rejected the first set of bids. That happened 84 times since 2020, on $666M of low bids, and 60% of them drew a single bid. On re-letting, the field grew from 1.8 to 2.0 bidders on average, yet the new low bid came in a median 0.8% lower and the same firm won again 60% of the time. Rejected attempts are left out of every other total on this site.
| Rejected | Contract | Low bid | Re-let |
|---|---|---|---|
| Aug 25, 2026 | Add 2 Lanes to I-55 from SR 463 to Gluckstadt Road, & Mill & Overlay aMadison · 3 bids | $196M | $188M Oct 27, 2026 · −4% |
| Aug 25, 2026 | Bridge Repair over MS 19 over Big Black River (Bridge No. 114.9)Attala · 4 bids | $1.7M | $1.8M Oct 27, 2026 · +9% |
| Jul 28, 2026 | Bridge Replacement on SR 28 between Copiah County Line & Pinola (BridgSimpson · 4 bids | $25.1M | $27.4M Oct 27, 2026 · +9% |
| Jun 5, 2026 | Mill & Overlay approximately 11 miles of US 61 from 0.5 miles North ofWarren · 1 bid | $12.0M | $12.2M Aug 25, 2026 · +2% |
| May 27, 2026 | Widening on I-10 at MS 605 WB RampHarrison · 3 bids | $1.4M | $1.4M Jul 28, 2026 · −2% |
| May 27, 2026 | Thin Lift Overlay approximately 10.2 miles of MS 467 from beginning ofHinds · 3 bids | $4.9M | $4.3M Jul 28, 2026 · −11% |
| Apr 28, 2026 | Overlay approximately 6.2 miles of I-59 from north of CR 39 to the ClaJasper · 2 bids | $3.7M | $5.8M Oct 27, 2026 · +56% |
| Feb 3, 2026 | Bridge Replacement on SR 486 (Bridge No. 1.0) Withdrawn from Letting 2Neshoba · 1 bid | $3.4M | $2.4M Aug 25, 2026 · −29% |
The BidCrew Mississippi Bid Price Index tracks the median winning unit price of 188 pay items bid every year since 2020, weighted by dollars. It rose 25% in 2022 alone and is 47% above its 2020–21 level.
| Pay item | Unit | Median, last 12 mo | vs. year earlier | 2020 median | Contracts |
|---|---|---|---|---|---|
| 9.5-mm, ST, Asphalt Pavement403-A015 / 907-403-A015 | TON | $157 | +5% | $97.24 | 50 |
| 9.5-mm, MT, Asphalt Pavement403-A014 / 907-403-A014 | TON | $159 | +9% | $97.00 | 26 |
| Stone Matrix Asphalt, 9.5 mm Mixture907-405-A001 | TON | $180 | −3% | – | 15 |
| Fine Milling of Bituminous Pavement, All Depths406-D001 | SY | $4.58 | +35% | $2.45 | 90 |
| 12.5-mm, MT, Asphalt Pavement403-A002 / 907-403-A002 | TON | $168 | +13% | $101 | 12 |
| Size 610 Crushed Stone Base304-F002 | TON | $86.53 | +16% | $60.00 | 34 |
| 19-mm, ST, Asphalt Pavement403-A006 / 907-403-A006 | TON | $160 | −10% | $123 | 33 |
| Open Graded Friction Course, 9.5-mm Mixture402-A002 / 907-402-A002 | TON | $198 | +5% | $121 | 9 |
| 9.5-mm, HT, Asphalt Pavement403-A013 / 907-403-A013 | TON | $178 | +5% | $114 | 18 |
| Ultra Thin Asphalt Pavement907-411-A001 | TON | $128 | −2% | $77.71 | 13 |
MDOT publishes a rolling schedule of the projects it expects to let. It carries no cost estimates, but it tells you what kind of work is coming and where. Listed as of Nov 21, 2026.
2.20 bidders per contract; low bids a median 4.8% above MDOT's estimate. The largest was Construction project, Madison County ($188M, T. L. Wallace Construction, Inc., 3 bidders).
77 contracts · 3.45 bidders each · 8% single-bid
63 contracts · 3.54 bidders each · 16% single-bid
74 contracts · 3.45 bidders each · 14% single-bid
98 contracts · 3.05 bidders each · 13% single-bid
67 contracts · 2.49 bidders each · 18% single-bid
73 contracts · 2.95 bidders each · 15% single-bid
BidCrew tracks every MDOT letting: line-item prices, competitor history, plan holders and a predicted low bid for each upcoming contract.