MDOT let 15 contracts worth $347M at the low bid, with 2.20 bidders per contract (the 12-month average is 3.70). T. L. Wallace Construction, Inc. won the most, $188M; 11 firms won at least one contract. The closest finish: Installation of Audible Stripe, Raised Pavement Markers and Sign Improvements on, decided by 0.00% ($5).
| Call | Contract | Low bidder | Low bid | Second | Gap | Bidders | vs. estimate |
|---|---|---|---|---|---|---|---|
| 5 | Construction project, Madison CountyMadison · Construction & widening · 108168301 | T. L. Wallace Construction, Inc.2nd: W. G. Yates & Sons Construction Company | $188M | $193M | 2.9% | 3 | +4.8% |
| 4 | Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 miles east of the MS 27/US 61 OWarren · Bridge repair & rehab · 109482301 | Hemphill Construction Company, Inc.2nd: Key, LLC | $41.8M | $42.7M | 2.0% | 3 | +40.4% |
| 2 | Bridge Replacement on SR 28 between the Copiah County Line & Pinola (Bridge Nos. 72.7 & 73.6) & over Tanyard Creek (BridSimpson · Bridge replacement · 100881301 | Chris Albritton Construction Company, Inc. | $27.4M | – | – | 1 | +7.5% |
| 7 | Mill & Overlay approximately 13.7 miles of I-59 from 0.5 miles north of the McNeil Exit to south of MSPearl River · Overlay & resurfacing · 108588301 | Huey P Stockstill, LLC | $23.4M | – | – | 1 | +8.5% |
| 1 | Mill & Overlay approximately 17 miles of I-22 beginning 1 mile west of the Landfill Road Exit and going east to the BentMarshall · Overlay & resurfacing · 109258301 | Lehman-Roberts Company2nd: APAC-Tennessee, Inc. dba Standard Construction Company | $18.0M | $18.7M | 3.9% | 4 | −4.9% |
| 6 | Mill & Overlay approximately 7.4 miles of I-55 from the Carroll County Line to 0.5 miles south of MS 8, Lighting on I-55Grenada, Carroll, Montgomery · Overlay & resurfacing · 109256301 | Lehman-Roberts Company | $17.9M | – | – | 1 | +10.0% |
| 3 | Slide Improvement on US 84 from west of Fire Tower Road to east of Providence RoadFranklin · Construction & widening · 109492301 | Midway Construction, Inc.2nd: Joe McGee Construction Company, Inc. | $9.3M | $9.6M | 3.2% | 4 | −18.1% |
| 9 | Fog Seal approximately 6.2 miles of I-59 from 0.8 mile north of CR 39 to the Jasper/Clarke County Line & Replacing OGFC Jasper, Clarke · Overlay & resurfacing · 110070301 | APAC - Mississippi, Inc.2nd: Dunn Roadbuilders, LLC | $5.8M | $6.1M | 4.4% | 2 | −3.8% |
| 8 | Fog Seal approximately 5 miles of I-59 from the Forrest County Line to the Forrest County Line, Fog Seal approximately 2Lamar, Forrest · Overlay & resurfacing · 110076301 | Warren Paving, Inc. | $4.8M | – | – | 1 | +8.7% |
| 11 | Overlay approximately 7 miles of MS 48 from SR 24 to Magnolia Progress RoadPike · Overlay & resurfacing · 108999301 | Dickerson & Bowen, Inc.2nd: Barriere Construction Company, LLC | $4.3M | $4.3M | 0.9% | 3 | +3.3% |
| 10 | OGFC Lift on I-59 from US 45 to approximately 0.248 miles north of the Russell Interchange & Fog Seal approximately 0.25Lauderdale · Overlay & resurfacing · 110080301 | APAC - Mississippi, Inc. | $3.9M | – | – | 1 | +9.7% |
| 12 | Bridge Repair on MS 19 over the Big Black River (Bridge No. 114.9)Attala · Bridge repair & rehab · 110041301 | Talbot Brothers Contracting Co., Inc.2nd: Mobley Contractors, Inc. | $1.8M | $2.0M | 8.4% | 4 | +9.1% |
| 13 | Installation of Audible Stripe, Raised Pavement Markers and Sign Improvements on MS 363 from the Lee County Line to MantItawamba, Lee · Intersections & safety · 110209301 | Riverside Traffic Systems, Inc.2nd: ROADSAFE TRAFFIC SYSTEMS, INC. | $634K | $634K | 0.0% | 2 | −3.3% |
| 14 | Installation of Audible Stripe, Raised Pavement Markers and Sign Improvements on MS 336 from US 278 to Apostolic CirclePontotoc · Intersections & safety · 110210301 | Riverside Traffic Systems, Inc. | $335K | – | – | 1 | −8.0% |
| 15 | Installation of Audible Stripe on MS 350 from MS 2 to CR 100Alcorn · Intersections & safety · 110208301 | Riverside Traffic Systems, Inc.2nd: ROADSAFE TRAFFIC SYSTEMS, INC. | $187K | $357K | 91.2% | 2 | +2.2% |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew.