BidCrew Data
BidCrew Data / Mississippi / District 7
MDOT District 7 · McComb

District 7: $438M let in three years, 2.95 bidders a contract

13 counties run from the McComb office: Adams, Amite, Covington, Franklin, Jefferson Davis, Lawrence, Lincoln, Marion, Pike, Simpson, Smith, Walthall, Wilkinson. District 7 let 13% of Mississippi's highway dollars over the last three years, fifth of six districts.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Awarded, last 12 months
$157M
up 85% vs. prior 12 months
Contracts, last 12 months
28
prior 12 months: 26
Bidders per contract
2.95
statewide 3.15 · last 3 years
Single-bid contracts
15%
statewide 14% · last 3 years
Low bid vs. MDOT estimate
−9.2%
statewide −6.8% · median
On MDOT's proposed list
29
projects, next 12 months
Map

Counties in District 7

01 · Trend

Work and competition by year

Dollars awardedDistrict 7, by year
$0$50M$100M$150M$200M$31.4M2020$68.0M2021$98.5M2022$156M2023$145M2024$85.9M2025$140M2026*
Bidders per contractDistrict 7 against the state
0.01.02.03.04.02020202120222023202420252026*D7 3.09State
02 · Who wins

T. L. Wallace Construction, Inc. leads District 7

Over the last three years T. L. Wallace Construction, Inc. won 19% of the district's dollars, followed by Barriere Construction Company, LLC (18%) and Dickerson & Bowen, Inc. (14%). 53 firms bid here and 27 won at least once.

Share of District 7 dollarsLast 3 years, top 10 firms
0%5%10%15%20%T. L. Wallace Construction, Inc.19.1%Barriere Construction Company, LLC18.2%Dickerson & Bowen, Inc.13.8%Chris Albritton Construction Comp…13.1%APAC - Mississippi, Inc.10.1%Southern Paving, LLC4.2%Midway Construction, Inc.3.6%RJM-McQueen Contracting, Inc.2.9%Holliday Construction, LLC2.5%Walters Construction Co., Inc.2.4%
FirmBidsWinsWin rateAwardedShareMedian margin when winning
T. L. Wallace Construction, Inc.Columbia15640%$83.4M19.1%8.8%
Barriere Construction Company, LLCMetairie6233%$79.6M18.2%0.8%
Dickerson & Bowen, Inc.Brookhaven211362%$60.3M13.8%3.6%
Chris Albritton Construction Company, Inc.Laurel5360%$57.3M13.1%10.3%
APAC - Mississippi, Inc.Richland221255%$44.3M10.1%7.0%
Southern Paving, LLCFoxworth8450%$18.3M4.2%6.5%
Midway Construction, Inc.Roxie5480%$15.5M3.6%15.7%
RJM-McQueen Contracting, Inc.11100%$12.5M2.9%1.7%
Holliday Construction, LLCPoplarville4375%$10.9M2.5%63.7%
Walters Construction Co., Inc.Laurel12325%$10.5M2.4%3.9%
Dunn Roadbuilders, LLCLaurel10220%$8.2M1.9%3.8%
Traffic Control Products Company, Inc.Pearl11100%$5.2M1.2%–
Joe McGee Construction Company, Inc.Lake9111%$4.4M1.0%0.2%
Key, LLCMadison10330%$4.2M1.0%8.6%
Jay-Van Company11100%$4.0M0.9%–
03 · Counties

County by county, last 3 years

CountyContractsAwardedBidders / contractSingle-bidLow vs. estimate
Pike13$120M2.3823%−4.6%
Simpson9$74.0M3.2211%−1.5%
Marion5$70.5M2.0020%+15.7%
Franklin9$30.9M2.8911%−18.1%
Covington10$29.2M3.7010%−12.3%
Lincoln8$25.7M2.6325%−0.9%
Smith7$24.6M4.570%−19.4%
Lawrence5$16.2M3.200%−23.7%
Adams6$11.6M2.8317%+0.8%
Walthall3$8.0M2.330%+7.5%
Amite3$7.1M2.3333%−8.8%
Jefferson Davis2$4.3M3.000%+10.9%
Wilkinson4$1.7M3.000%−19.3%

By type of work, last 3 years

Work typeContractsAwardedBidders / contractLow vs. estimate
Overlay & resurfacing34$136M2.50−10.7%
Construction & widening15$51.5M3.07−14.9%
Bridge repair & rehab10$18.5M3.80−3.2%
Bridge replacement5$121M3.40+7.5%
Intersections & safety7$109M3.29−8.7%
Buildings & other2$1.2M3.00−16.3%
04 · Recent contracts

The last 15 contracts

LetContractLow bidderLow bidBiddersGap to 2ndvs. estimate
Oct 27, 2026Overlay approximately 7 miles of MS 48 from SR 24 to Magnolia Progress RoadPike · Overlay & resurfacingDickerson & Bowen, Inc.$4.3M30.9%+3.3%
Oct 27, 2026Slide Improvement on US 84 from west of Fire Tower Road to east of Providence RoadFranklin · Construction & wideningMidway Construction, Inc.$9.3M43.2%−18.1%
Oct 27, 2026Bridge Replacement on SR 28 between the Copiah County Line & Pinola (Bridge Nos. 72.7 & 73.6) & over Tanyard CSimpson · Bridge replacementChris Albritton Construction Company, Inc.$27.4M1–+7.5%
Sep 22, 2026Bridge Repair on SR 532 over Stream (Bridge No. 13.5)Covington · Bridge repair & rehabT. L. Wallace Construction, Inc.$497K66.3%−5.0%
Sep 1, 2026Bridge Replacement on US 51 over unnamed Streams (Bridge Nos. 11.7 & 12.1) & between Magnolia & Fernwood (BridPike · Bridge replacementT. L. Wallace Construction, Inc.$6.8M311.2%−9.2%
Jul 28, 2026Bridge Replacement on SR 28 between Copiah County Line & Pinola (Bridge Nos. 72.7 & 73.6) & over Tanyard CreekSimpson · Bridge replacementChris Albritton Construction Company, Inc.$25.1M417.8%+34.6%
Jun 23, 2026Overlay approximately 8.5 miles of MS 587 from the Marion County Line to the Northern Ervin-Reid Circle DriveLawrence · Overlay & resurfacingDickerson & Bowen, Inc.$4.1M40.2%−7.1%
Jun 5, 2026Mill & Overlay approximately 2 miles of SR 24 from Lower Woodville Road to US 61Wilkinson · Overlay & resurfacingAPAC - Mississippi, Inc.$1.3M26.6%+9.8%
Jun 5, 2026Overlay approximately 8 miles of SR 27 from the Louisiana State Line to High School DriveWalthall · Overlay & resurfacingBarriere Construction Company, LLC$3.6M30.3%−2.8%
Jun 5, 2026Mill & Overlay approximately 9 miles of US 84 Westbound Lanes from Collins to the Jones County LineCovington · Overlay & resurfacingAPAC - Mississippi, Inc.$3.6M38.5%−10.2%
May 27, 2026Restricted Crossing U-Turn (RCUT) on US 84 at MS 33Franklin · Construction & wideningMidway Construction, Inc.$3.8M215.3%−6.5%
May 8, 2026Seal & Overlay approximately 16 miles of MS 501 from SR 18 to the Scott County LineSmith · Overlay & resurfacingSouthern Paving, LLC$7.2M43.1%−19.4%
Apr 28, 2026Overlay approximately 11.2 miles on MS 550 from the Jefferson County Line to east of Bouie Mill RoadLincoln · Overlay & resurfacingDickerson & Bowen, Inc.$5.2M39.7%−13.5%
Apr 28, 2026Overlay approximately 4.5 miles on MS 184 and MS 13 at Prentiss from US 84 to end of MS 184 near US 84 and ForJefferson Davis · Overlay & resurfacingWalters Construction Co., Inc.$2.9M40.5%−10.2%
Apr 28, 2026OGFC Lift on I-55 from the Mississippi State Line to MS 568Pike · Overlay & resurfacingDickerson & Bowen, Inc.$13.2M211.9%−3.8%
05 · Coming up

29 District 7 projects on MDOT's proposed list

LettingCountyRouteScopeDescription
November 2026LincolnI 55Bridge RepairI-55 over CNIC Railroad (Br #s 40.3 A & B)
November 2026CovingtonMS 589Storm DamageSR 589 over Beaver Creek - Box Culvert
November 2026CovingtonUS 49Storm DamageUS 49 Retaining Wall and Median Inlet - PR
November 2026CovingtonUS 49Bridge RepairUS 49 over Big Swamp Creek Bridge #s 90.1A & 90.1B)
November 2026CovingtonUS 49Bridge RepairUS 49 over Double Branch Creek (Bridge # 89.1B)
November 2026DistrictwideStorm DamageDistrict 7 Emergency Maintenance Contract
January 2027Jefferson DavisMS 13OverlayMS 13 from the Marion County Line to MS 184
January 2027CovingtonMS 184Scrub Seal & OverlayMS 184 From US 84 to US 49 and the frontage roads along US 49 in Collins between Walter's Road and Sylvia Street
February 2027LincolnUS 98OverlayUS 98 Fr Franklin CL to Amite CL
February 2027AmiteUS 98OverlayUS 98 Fr Lincoln CL to Pike CL
February 2027PikeUS 98OverlayUS 98 and MS 198 from Amite CL to US 51
March 2027DistrictwideBridge RepairD7 - Pile/Encasement Repair Project (40 Bridges)
March 2027SimpsonUS 49Mill & OverlayUS 49 Fr 0.57 Mi S of MS 540 to Charlie Newsome Road
March 2027LincolnUS 84OverlayUS 84 from Auburn Drive to US 51
March 2027LincolnBridge RepairCalvary Drive over I-55 (Bridge # 31.2)
April 2027SimpsonMS 540Crack SealMS 540 From Harrisville to Dlo
May 2027AmiteMS 33OverlayMS 33 From MS 24 at Gloster to the Wilkinson County Line
July 2027CovingtonMS 35Bridge Preventive MaintenanceMS 35 over Okatoma Creek (Bridge # 63.8) - Seal joints, bearing replacements
July 2027FranklinUS 84Bridge Preventive MaintenanceUS 84 over Wells Creek (Bridge # 24.5B) - Repair deteriorated steel risers - Bent 3 and Bent 4
July 2027LincolnUS 84Bridge Preventive MaintenanceI-55 over Bogue Chitto Road (Bridge #29.4B) - Bearing replacements, clean caps, prestressed beam repair
July 2027WilkinsonUS 61Bridge Preventive MaintenanceUS 61 over Buffalo River & Homochitto River (Bridge #s 17.7A, 26.5A, & 26.5B) - Bearing replacements at Bents 1, 6, & 11, epoxy repair - Bea
July 2027LawrenceMS 27OverlayMS 27 from Walthall CL to Dewey Ballard
July 2027SmithMS 37Bridge RepairMS 37 over Fisher Creek (Bridge # 14.3)
July 2027MarionMS 587OverlayMS 587 from 0.9 mile north of Needham Lane/Carroll Loop to the Lawrence County Line
August 2027AdamsUS 61Bridge RepairUS 61 over St. Catherine Creek (Bridge #s 45.2A & 45.2B)
August 2027WilkinsonMS 563Thin LiftMS 563 From US 61 to County Maintained Buffalo Road
September 2027CovingtonBridge Preventive MaintenanceMS 590 (#0.4) & MS 35 (#63.8)
September 2027WalthallMS 27OverlayMS 27 from Beulah Ave to Kelly Ginn Rd
September 2027CovingtonBridge RepairUS 84 & MS 590 (Bridge #S 132.4A, 132.4B & 0.4)

Source: MDOT Schedule of Proposed Projects, Nov 21, 2026.

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. * 2026 through 2026-10-27.

Bid District 7 with every number in front of you

BidCrew shows who bought plans, how each competitor prices this district, and a predicted low bid for every upcoming contract.

Request access