BidCrew Data
BidCrew Data / Mississippi / Lettings / Sep 1, 2026
MDOT letting · Special

September 1, 2026 MDOT letting: 2 contracts, $54.0M

MDOT let 2 contracts worth $54.0M at the low bid, with 4.50 bidders per contract (the 12-month average is 3.70). Talbot Brothers Contracting Co., Inc. won the most, $47.2M; 2 firms won at least one contract. The closest finish: Bridge Replacements on SR 32 between Webb & Charleston (Bridge Nos. 45.6, 46.2 &, decided by 6.9% ($3.3M).

Awarded at low bid
$54.0M
2 contracts
Bidders per contract
4.50
single-bid 0%
Low bid vs. estimate
−4.6%
median
Low-to-second gap
$4.0M
median 9.1%
CallContractLow bidderLow bidSecondGapBiddersvs. estimate
4Bridge Replacements on SR 32 between Webb & Charleston (Bridge Nos. 45.6, 46.2 & 47.0)Tallahatchie · Bridge replacement · 102383302Talbot Brothers Contracting Co., Inc.2nd: Ste-Bil Grading Inc.$47.2M$50.4M6.9%6+0.0%
9Bridge Replacement on US 51 over unnamed Streams (Bridge Nos. 11.7 & 12.1) & between Magnolia & Fernwood (Bridge Nos. 13Pike · Bridge replacement · 106972301T. L. Wallace Construction, Inc.2nd: Chris Albritton Construction Company, Inc.$6.8M$7.6M11.2%3−9.2%

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew.

Bid the next letting with this data

BidCrew tracks every DOT letting: line-item prices, competitor history, and a predicted low bid before you submit.

Request access