41,598 winning line-item prices on 1,910 pay items, from every MDOT bid whose items reconcile to its total. Prices rose 25% in 2022 and sit 47% above 2020–21.
| Pay item | Unit | Median, last 12 mo | vs. year earlier | 2020 median | Prices | Trend |
|---|---|---|---|---|---|---|
| 9.5-mm, ST, Asphalt Pavement403-A015 / 907-403-A015 | TON | $157 | +5% | $97.24 | 340 | |
| 9.5-mm, MT, Asphalt Pavement403-A014 / 907-403-A014 | TON | $159 | +9% | $97.00 | 192 | |
| Stone Matrix Asphalt, 9.5 mm Mixture907-405-A001 | TON | $180 | −3% | – | 52 | |
| Fine Milling of Bituminous Pavement, All Depths406-D001 | SY | $4.58 | +35% | $2.45 | 502 | |
| 12.5-mm, MT, Asphalt Pavement403-A002 / 907-403-A002 | TON | $168 | +13% | $101 | 105 | |
| Size 610 Crushed Stone Base304-F002 | TON | $86.53 | +16% | $60.00 | 172 | |
| 19-mm, ST, Asphalt Pavement403-A006 / 907-403-A006 | TON | $160 | −10% | $123 | 223 | |
| Open Graded Friction Course, 9.5-mm Mixture402-A002 / 907-402-A002 | TON | $198 | +5% | $121 | 43 | |
| 9.5-mm, HT, Asphalt Pavement403-A013 / 907-403-A013 | TON | $178 | +5% | $114 | 85 | |
| Ultra Thin Asphalt Pavement907-411-A001 | TON | $128 | −2% | $77.71 | 107 | |
| Excess Excavation, FM, AH203-G001 | CY | $17.00 | −23% | $10.00 | 339 | |
| Borrow Excavation, AH, FME, Class B9203-EX020 | CY | $24.75 | +8% | $15.12 | 67 | |
| Stone Matrix Asphalt, 12.5 mm Mixture907-405-A002 | TON | $261 | +26% | – | 21 | |
| Size 825B Crushed Stone Base304-F003 | TON | $80.41 | −5% | $40.00 | 141 | |
| Unclassified Excavation, FM, AH203-A001 | CY | $13.20 | −29% | $6.75 | 128 | |
| 9.5-mm, HT, Asphalt Pavement, Polymer Modified403-D007 / 907-403-D007 | TON | $183 | +49% | $106 | 49 | |
| Loose Riprap, Size 300815-A007 | TON | $116 | +13% | $60.00 | 211 | |
| Bridge Concrete, Class BDX907-804-A001 | CY | $1,331 | −8% | $950 | 54 | |
| Borrow Excavation, AH, FME, Class B9-6203-EX021 | CY | $19.00 | −37% | $10.75 | 53 | |
| 19-mm, HT, Asphalt Pavement403-A004 / 907-403-A004 | TON | $187 | +2% | $136 | 61 | |
| 12.5-mm, HT, Asphalt Pavement403-A001 / 907-403-A001 | TON | $190 | +11% | $107 | 55 | |
| Bridge Concrete, Class AA907-804-A002 | CY | $1,500 | −20% | $1,063 | 83 | |
| Bridge Concrete, Class BD907-804-A004 | CY | $2,000 | +18% | $1,025 | 18 | |
| 9.5-mm, ST, Asphalt Pavement, Leveling403-B012 / 907-403-B012 | TON | $174 | −1% | $110 | 117 | |
| 12.5-mm, ST, Asphalt Pavement403-A003 / 907-403-A003 | TON | $180 | −2% | $110 | 99 | |
| Concrete Paved Ditch221-A001 | CY | $1,100 | −23% | $900 | 169 | |
| 19-mm, MT, Asphalt Pavement403-A005 / 907-403-A005 | TON | $173 | −12% | $125 | 106 | |
| Reinforcement805-A001 | LBS | $2.00 | +21% | $1.10 | 88 | |
| Borrow Excavation, AH, FME, Class B7203-EX017 | CY | $21.50 | −59% | $12.50 | 12 | |
| Granular Material, Crushed Stone304-D002 | TON | $96.00 | +10% | $72.25 | 110 | |
| Asphalt for Tack Coat407-A001 / 907-407-A001 | GAL | $4.15 | +4% | $3.30 | 648 | |
| Granular Material, Class 5, Group D304-B004 | TON | $57.50 | +39% | $26.20 | 104 | |
| Stone Matrix Asphalt, 9.5 mm Mixture405-A002 | TON | – | – | $119 | 14 | |
| Random Clearing201-D001 | STA | $880 | −12% | $568 | 129 | |
| 12.5-mm, HT, Asphalt Pavement, Polymer Modified403-D001 / 907-403-D001 | TON | $220 | +39% | $103 | 26 | |
| Class "B" Structural Concrete601-A001 / 907-601-A001 | CY | $1,758 | +10% | $888 | 53 | |
| Random Clearing907-201-D001 | MI | $44,207 | +275% | – | 15 | |
| Temporary Traffic Stripe, Continuous White619-A1001 | MI | $1,900 | −5% | $1,185 | 508 | |
| 6" Thermoplastic Double Drop Edge Stripe, Continuous White626-C002 | MI | – | – | $3,995 | 191 | |
| Cable Barrier610-A001 | LF | $41.10 | +25% | $15.00 | 16 | |
| Scrub Seal907-414-A001 | SY | $3.00 | −5% | $2.24 | 45 | |
| Removal of Asphalt Pavement, All Depths202-B007 | SY | $24.15 | +21% | $19.30 | 357 | |
| Bridge Repair, Cap Cleaning907-824-PP006 | EA | $3,073 | −56% | $2,650 | 163 | |
| HP 14 x 89 Steel Piling803-D007 | LF | $120 | +20% | $58.23 | 27 | |
| 100' Prestressed Concrete Beam, Type FIB-36804-C192 | LF | $454 | +15% | $238 | 20 | |
| Temporary Traffic Stripe, Continuous Yellow619-A2001 | MI | $1,963 | −2% | $1,200 | 507 | |
| 6" Thermoplastic Double Drop Traffic Stripe, Continuous Yellow626-E001 | MI | – | – | $3,900 | 243 | |
| Class "B" Structural Concrete, Minor Structures601-B001 / 907-601-B001 | CY | $3,162 | −10% | $2,565 | 188 | |
| Removal of Bridge202-B023 | EA | $68,000 | −55% | $66,788 | 37 | |
| 80' Prestressed Concrete Beam, Type FIB-36804-C188 | LF | $454 | −3% | $221 | 16 | |
| Loose Riprap, Size 500815-A009 | TON | $123 | +11% | $55.00 | 13 | |
| Geotextile Stabilization, Type V, Non-Woven209-A005 | SY | $5.00 | +35% | $2.50 | 208 | |
| Concrete Median Barrier, Precast619-F1001 | LF | $52.50 | −13% | $39.73 | 91 | |
| 9.5-mm, MT, Asphalt Pavement, Leveling403-B011 / 907-403-B011 | TON | $127 | −27% | $95.00 | 36 | |
| Reinforced Cement Concrete Bridge End Pavement502-A001 / 907-502-A001 | SY | $412 | +6% | $259 | 80 | |
| Cold Milling of Bituminous Pavement, All Depths406-A002 | SY | $5.50 | −8% | $5.00 | 108 | |
| Granular Material, Class 3, Group D304-B002 | TON | – | – | $31.05 | 49 | |
| 9.5-mm, HT, Asphalt Pavement, Leveling403-B010 / 907-403-B010 | TON | $159 | – | $112 | 16 | |
| Granular Material, LVM, Class 3, Group D304-A003 | CY | $48.50 | −12% | $29.90 | 46 | |
| Bearing Replacements907-824-D001 | EA | $5,500 | +0% | – | 42 | |
| 12.5-mm, HT, Asphalt Pavement, Leveling403-B001 / 907-403-B001 | TON | $178 | −30% | – | 22 | |
| Bridge Deck Overlay Concrete907-804-O001 | CY | $2,490 | +36% | $1,475 | 38 | |
| 6" Thermoplastic Double Drop Traffic Stripe, Continuous White626-B002 | MI | – | – | $3,600 | 119 | |
| Cement308-A001 | TON | $301 | +17% | $222 | 17 | |
| Removal of Traffic Stripe202-B240 | LF | $4.00 | −14% | $2.06 | 426 | |
| Removal of Bridge Deck, Hydrodemolition907-202-B001 | SY | $131 | −16% | $300 | 35 | |
| 19-mm, ST, Asphalt Pavement, Trench Widening403-C003 / 907-403-C003 | TON | $180 | −13% | $126 | 48 | |
| Removal of Debris, LVM202-B116 | CY | $14.45 | −19% | $15.43 | 13 | |
| Reinforcing Steel602-A001 | LBS | $3.15 | +26% | $2.90 | 143 | |
| Guard Rail, Terminal End Section, Flared606-E005 | EA | $3,995 | +5% | $2,780 | 233 | |
| Granular Material, LVM, Class 6, Group D304-A008 | CY | $41.50 | −1% | $19.00 | 89 | |
| 24" Steel Pipe Piling, Wall Thickness 0.500"803-P001 | LF | $272 | +240% | $116 | 26 | |
| Bridge Repair, Removal of Bridge Deck907-824-PP003 | SF | $75.00 | −6% | $250 | 102 | |
| Saw Cut, Full Depth503-C010 | LF | $8.38 | +1% | $12.50 | 419 | |
| Hybrid Polymer Concrete Overlay907-828-A001 | CY | $9,000 | −1% | – | 20 | |
| Fine Milling of Bituminous Pavement, All Depths406-D003 | TON | $40.00 | −8% | – | 42 | |
| Removal of Concrete Pavement w/ Variable Depth Overlay202-B069 | SY | $128 | +28% | $60.00 | 80 | |
| Box Bridge Concrete, Class B907-804-B001 | CY | $939 | −86% | $775 | 12 | |
| Two-Way Yellow Reflective High Performance Raised Markers627-L001 / 907-627-L001 | EA | $12.00 | −7% | $7.13 | 686 | |
| Polymer Cement Surface System907-417-A001 | SY | $125 | −3% | $74.32 | 29 | |
| HP 14 x 73 Steel Piling803-D006 | LF | $117 | +85% | $54.13 | 24 | |
| Guard Rail, Class A, Type 1, 'W' Beam, Metal Post606-B003 | LF | $32.70 | +11% | $20.45 | 104 | |
| Bridge Repair, Endwall Repair907-824-PP008 | LF | $75.00 | −50% | $575 | 147 | |
| Temporary Traffic Stripe, Skip White619-A3001 | MI | $2,000 | 0% | $1,108 | 232 | |
| Riprap for Erosion Control249-A001 | TON | $126 | +26% | $73.60 | 128 | |
| Red-Clear Reflective High Performance Raised Markers627-K001 / 907-627-K001 | EA | $12.00 | 0% | $7.13 | 435 | |
| Lime307-D001 | TON | $837 | +104% | $320 | 16 | |
| Sawing and Sealing Transverse Joints in Asphalt Pavement413-E001 / 907-413-E001 | LF | $6.97 | +30% | $3.50 | 213 | |
| Concrete Railing, 36"813-A004 | LF | $134 | +44% | $52.50 | 55 | |
| 3/4" and Down Crushed Stone Base304-F001 | TON | $82.66 | +1% | $57.60 | 28 | |
| Temporary Silt Fence234-A001 / 907-234-A001 | LF | $4.45 | +3% | $4.00 | 221 | |
| 6" Thermoplastic Edge Stripe, Continuous White907-626-C014 | MI | $8,153 | +3% | – | 43 | |
| 6" Thermoplastic Traffic Stripe, Continuous Yellow907-626-E005 | MI | $8,153 | −1% | – | 77 | |
| 6" Thermoplastic Double Drop Edge Stripe, Continuous White907-626-C012 | MI | $7,500 | −9% | – | 60 | |
| PDA Test Pile, Steel Pipe Pile907-803-I004 | EA | $35,400 | −13% | $25,000 | 44 | |
| Thermoplastic Double Drop Detail Stripe, White626-G004 | LF | – | – | $1.73 | 218 | |
| Thermoplastic Detail Stripe, White626-G002 | LF | – | – | $1.75 | 210 | |
| 12.5-mm, MT, Asphalt Pavement, Leveling403-B002 / 907-403-B002 | TON | $185 | +9% | $134 | 54 | |
| Remove and Reset Concrete Median Barrier, Precast619-F2001 | LF | $20.00 | +25% | $26.57 | 69 | |
| Guard Rail, Class A, Type 1606-B001 | LF | $33.38 | +4% | $21.00 | 157 | |
| Random Clearing201-D002 | ACRE | $10,000 | +111% | $9,300 | 21 | |
| Grassing225-A001 | ACRE | $1,855 | +58% | $1,500 | 180 | |
| Concrete Median and/or Island Pavement, 10-inch616-A001 | SY | $142 | −18% | $116 | 71 | |
| 8" and Variable Continuously Reinforced Concrete Pavement, Broom Finish503-A001 / 907-503-A001 | SY | $513 | −31% | $377 | 26 | |
| Clearing and Grubbing201-B001 | ACRE | $10,000 | +25% | $4,900 | 115 | |
| Changeable Message Sign907-619-E3001 | EA | $5,250 | −20% | $5,500 | 256 | |
| Signal Stop Bar Radar Vehicle Detection Sensor, Type 2907-641-A002 | EA | $7,756 | −3% | $7,546 | 65 | |
| Interlocking Flexible Block Erosion Control System907-240-A001 | SY | $99.65 | – | $79.41 | 11 | |
| Guard Rail, Class A, Type 1, 'W' Beam606-B002 | LF | $31.45 | −8% | $20.00 | 87 | |
| Thermoplastic Detail Stripe, White907-626-G004 | LF | $4.00 | −4% | – | 130 | |
| Borrow Excavation, AH, FME, Class B7-6203-EX018 | CY | $26.45 | −40% | – | 14 | |
| 30" Steel Pipe Piling, Wall Thickness 0.500"803-P003 | LF | $460 | +163% | $150 | 15 | |
| Combination Concrete Curb and Gutter Type 3A Modified609-D012 | LF | $37.33 | −16% | $22.00 | 34 | |
| Thermoplastic Audible Edge Stripe907-626-C003 | MI | $5,000 | −27% | $3,650 | 29 | |
| Temporary Grassing226-A001 | ACRE | $1,335 | +27% | $933 | 165 | |
| Concrete Median and/or Island Pavement, 4-inch616-A004 | SY | $85.00 | +3% | $58.83 | 60 | |
| Temporary Traffic Stripe, Skip Yellow619-A4002 | MI | $1,879 | −6% | $1,200 | 332 | |
| Removal of Asphalt Paved Shoulders, All Depths202-B006 | SY | $25.91 | +59% | $7.70 | 60 | |
| Thermoplastic Double Drop Detail Stripe, White907-626-G006 | LF | $4.00 | −3% | – | 71 | |
| 6" Thermoplastic Double Drop Traffic Stripe, Skip White626-A001 | MI | – | – | $1,900 | 121 | |
| Bituminous Tack Coat402-B001 / 907-402-B001 | GAL | $4.29 | +8% | $4.20 | 43 | |
| 19-mm, MT, Asphalt Pavement, Trench Widening403-C002 / 907-403-C002 | TON | $138 | −31% | $120 | 19 | |
| Two-Way Clear Reflective High Performance Raised Markers627-J001 / 907-627-J001 | EA | $12.00 | 0% | $7.00 | 503 | |
| 12.5-mm, ST, Asphalt Pavement, Leveling403-B003 / 907-403-B003 | TON | $175 | −30% | $112 | 27 | |
| Thermoplastic Detail Stripe, Yellow626-G003 | LF | – | – | $1.91 | 192 | |
| Erosion Mat229-A001 | SY | $67.00 | −27% | $51.25 | 34 | |
| Removal of Concrete Pavement, All Depths202-B073 | SY | $59.75 | +134% | $136 | 56 | |
| Granular Material, LVM, Class 3, Group C304-A002 | CY | $55.00 | +2% | $45.36 | 41 | |
| 6" Thermoplastic Traffic Stripe, Continuous White907-626-B006 | MI | $8,200 | −3% | – | 39 | |
| 6" Thermoplastic Double Drop Traffic Stripe, Continuous Yellow907-626-E003 | MI | $7,400 | −10% | – | 57 | |
| Borrow Excavation, AH, FME, Class B15203-EX008 | CY | $29.50 | −39% | $12.88 | 18 | |
| 19-mm, ST, Asphalt Pavement, Leveling403-B006 / 907-403-B006 | TON | $199 | −12% | $200 | 53 | |
| Square Tube Posts, 4.0 lb/ft630-C001 | LF | $47.25 | +5% | – | 132 | |
| Filter Material for Combination Storm Drain and/or Underdrains,Type B, FM605-W002 | CY | $96.42 | +11% | $75.38 | 66 | |
| Undersealing907-420-A001 | LBS | $5.00 | −24% | $3.53 | 88 | |
| Square Tube Posts, 2.0 lb/ft630-C005 | LF | $18.55 | −7% | – | 209 | |
| Structure Excavation206-A001 | CY | $29.38 | −16% | $25.00 | 155 | |
| Loose Riprap, Size 100815-A002 | TON | $124 | +21% | $60.00 | 39 | |
| 6" Thermoplastic Traffic Stripe, Continuous Yellow626-E004 | MI | – | – | $3,950 | 77 | |
| 18" Reinforced Concrete Pipe, Class III603-CA011 | LF | $82.60 | −11% | $56.81 | 85 | |
| 6" Thermoplastic Double Drop Edge Stripe, Continuous Yellow626-F001 | MI | – | – | $3,795 | 54 | |
| 6" Thermoplastic Double Drop Traffic Stripe, Continuous White907-626-B004 | MI | $8,930 | +13% | – | 28 | |
| 6" Thermoplastic Edge Stripe, Continuous White626-C004 | MI | – | – | $3,950 | 53 | |
| 6" Thermoplastic Double Drop Traffic Stripe, Skip Yellow626-D001 | MI | – | – | $2,055 | 189 | |
| Bituminous Curing Seal308-S001 | GAL | $5.00 | −5% | $3.55 | 17 | |
| PDA Test Pile, HP Steel Pile907-803-I003 | EA | $19,500 | +18% | $14,250 | 40 | |
| Combination Concrete Curb and Gutter Type 2 Modified609-D004 | LF | $38.40 | −6% | $26.84 | 45 | |
| Temporary Portable Rumble Strips907-619-B001 | LF | $122 | −4% | $207 | 293 | |
| Guard Rail, Bridge End Section, Type I606-D022 | EA | $3,970 | +4% | $2,553 | 127 | |
| Rumble Strips, Ground In423-A001 | MI | $430 | +7% | $388 | 421 | |
| Soil-Cement-Water Mixing, Optional Mixers, Design Soil308-B003 | SY | $3.45 | +15% | $1.32 | 16 | |
| 8" and Variable Jointed Concrete Pavement503-A002 / 907-503-A002 | SY | $310 | +211% | $462 | 14 | |
| Preformed Joint Seal, Type I907-823-A001 | LF | $35.00 | 0% | $29.50 | 161 | |
| Guard Rail, Terminal End Section, Non-Flared606-E007 | EA | $4,163 | +0% | $2,850 | 110 | |
| Soil-Cement-Water Mixing, Optional Mixers, Base308-B002 | SY | – | – | $1.25 | 12 | |
| Thermoplastic Detail Stripe, Yellow907-626-G005 | LF | $4.00 | −4% | – | 116 | |
| Removal of Guard Rail, Including Rails, Posts and Terminal Ends202-B158 | LF | $7.25 | +16% | $7.50 | 155 | |
| Thermoplastic Double Drop Detail Stripe, Yellow626-G005 | LF | – | – | $1.73 | 199 | |
| Standard Roadside Signs, Sheet Aluminum, 0.125" Thickness630-A003 | SF | $24.00 | −4% | $23.89 | 265 | |
| Removal of Asphalt Pavement, Failed Areas202-B009 | SY | $79.66 | −34% | $30.00 | 64 | |
| Removal of Pavement, All Types and Depths202-B188 | SY | $14.20 | −67% | $8.50 | 40 | |
| Wattles, 20"237-A002 | LF | $9.28 | +24% | $6.75 | 223 | |
| Geotextile under Riprap815-E001 | SY | $3.54 | −29% | $3.27 | 221 | |
| 6" Thermoplastic Double Drop Edge Stripe, Continuous Yellow907-626-F003 | MI | $8,930 | +12% | – | 27 | |
| General Epoxy Repair907-824-A003 | SF | $688 | +25% | – | 86 | |
| Temporary Traffic Stripe, Detail619-A5001 | LF | $0.25 | −17% | $0.20 | 527 | |
| Solid Sodding216-A001 | SY | $8.93 | +12% | $8.60 | 179 | |
| 6" High Performance Cold Plastic Traffic Stripe, Continuous White628-H001 | LF | – | – | $7.65 | 113 | |
| Combination Concrete Curb and Gutter Type 2609-D003 | LF | $54.80 | +18% | $51.77 | 35 | |
| Joint Sealant403-S001 / 907-403-S001 | MI | $2,500 | +39% | $1,645 | 40 | |
| Work Zone Law Enforcement907-618-M2001 | HRS | $60.00 | 0% | $60.00 | 50 | |
| Concrete Railing, 32"813-A002 | LF | $230 | +171% | $63.80 | 14 | |
| Silt Basin, Type D236-A008 | EA | $2,815 | +28% | $7,500 | 41 | |
| Temporary Stream Diversion247-A001 | EA | $13,984 | −2% | $13,345 | 29 | |
| 6" Thermoplastic Double Drop Traffic Stripe, Skip White907-626-A007 | MI | $5,083 | +15% | – | 45 | |
| Sediment Control Stone815-F002 | TON | $115 | +10% | $60.00 | 83 | |
| Thermoplastic Double Drop Detail Stripe, Yellow907-626-G007 | LF | $5.00 | +23% | – | 61 | |
| 24" Reinforced Concrete Pipe, Class III603-CA026 | LF | $105 | −4% | $60.83 | 73 | |
| Mulch, Vegetative Mulch225-C001 | TON | $305 | +22% | $250 | 174 | |
| High Friction Surface Treatment907-416-A001 | SY | $126 | +235% | $19.60 | 11 | |
| Concrete Slope Paving815-D001 | CY | $6,600 | +258% | $680 | 22 | |
| Guard Rail, Terminal End Section606-E001 | EA | $4,155 | +7% | $2,715 | 77 | |
| 18" Steel Pipe Piling, Wall Thickness 0.500"803-P007 | LF | – | – | – | 12 | |
| Signal Advanced Radar Vehicle Detection Sensor, Type 2907-641-B002 | EA | $8,536 | +6% | $7,729 | 51 | |
| 6" Thermoplastic Traffic Stripe, Skip White907-626-A010 | MI | $4,162 | −17% | – | 39 | |
| Select Material for Undercuts, Contractor Furnished, FM206-B001 | CY | $145 | +2% | $51.00 | 74 | |
| 6" High Performance Cold Plastic Traffic Stripe, Continuous Yellow628-J001 | LF | – | – | $7.50 | 92 | |
| Topsoil for Slope Treatment, Contractor Furnished211-B001 | CY | $1.00 | 0% | $20.50 | 130 | |
| Cable Barrier Terminal Section610-B001 | EA | $5,950 | −23% | $4,000 | 17 | |
| Excess Excavation, LVM, AH203-G002 | CY | $25.13 | −28% | $14.00 | 153 | |
| Detour Bridge Piling618-E001 | LF | $85.50 | +170900% | $36.00 | 13 | |
| Removal of Traffic Stripe202-B241 | MI | $5,350 | −50% | $8,955 | 25 | |
| Granular Material, Class 5, Group C304-B003 | TON | $64.03 | +192% | $69.30 | 12 | |
| Thermoplastic Legend, White626-H005 | LF | – | – | $3.50 | 206 | |
| Removal of Guard Rail202-B136 | LF | $8.55 | +18% | $7.20 | 98 | |
| Cap Cleaning907-824-C001 | EA | $1,785 | −11% | – | 75 | |
| Thermoplastic Double Drop Legend, White626-H002 | LF | – | – | $3.70 | 171 | |
| 6" Thermoplastic Edge Stripe, Continuous Yellow907-626-F005 | MI | $8,375 | +2% | – | 15 | |
| Concrete Median and/or Island Pavement, 12-inch616-A003 | SY | $145 | −37% | – | 17 | |
| Standard Roadside Construction Signs, 10 Square Feet or More619-D2001 | SF | $10.00 | 0% | $8.00 | 344 | |
| Super Silt Fence234-C001 / 907-234-C001 | LF | $16.30 | −3% | $11.00 | 73 | |
| Multi-Sensor Vehicle Detection Sensor907-643-E001 | EA | $9,850 | +13% | $12,600 | 17 | |
| Bridge Repair, Elastomeric Concrete907-824-PP007 | CY | $10,000 | −15% | $7,000 | 30 | |
| Granular Material, LVM, Class 5, Group C304-A004 | CY | – | – | $38.40 | 14 | |
| Asphalt for Fog Seal907-414-B001 | GAL | $10.00 | −73% | $4.92 | 13 | |
| Superphosphate213-C001 | TON | $1,000 | −9% | $825 | 164 | |
| Gratings604-B001 | LBS | $6.05 | +1% | $4.78 | 81 | |
| Fiber Optic Cable, 72 SM907-661-A004 | LF | $3.12 | +42% | – | 11 | |
| 6" Thermoplastic Double Drop Traffic Stripe, Continuous Yellow626-E002 | LF | – | – | $1.05 | 77 | |
| Free Standing Plastic Drums619-G5001 | EA | $50.00 | −18% | $50.69 | 171 | |
| 18" Type A Alternate Pipe603-ALT003 | LF | $60.00 | −11% | $35.00 | 61 | |
| Standard Roadside Signs, Sheet Aluminum, 0.080" Thickness630-A001 | SF | $22.00 | −4% | $22.00 | 249 | |
| Concrete Driveway, With Reinforcement614-B001 | SY | $120 | −17% | $100 | 22 | |
| Concrete Anchors607-Z001 | EA | $71.98 | +1% | $32.50 | 11 | |
| Bituminous Curing Seal307-S001 | GAL | $5.00 | −5% | $3.55 | 16 | |
| Video Vehicle Detection Sensor, Type 1A907-643-A004 | EA | $2,540 | +54% | $5,972 | 28 | |
| 6" Thermoplastic Double Drop Traffic Stripe, Continuous White626-B001 | LF | – | – | $1.00 | 34 | |
| Granular Material, LVM, Crushed Stone304-E003 | CY | $128 | −38% | $104 | 14 | |
| Thermoplastic Double Drop Legend, White626-H001 | SF | – | – | $10.30 | 133 | |
| 6" Thermoplastic Traffic Stripe, Continuous White626-B004 | MI | – | – | $4,400 | 20 | |
| 6" Thermoplastic Traffic Stripe, Skip Yellow907-626-D005 | MI | $4,500 | +13% | – | 58 | |
| Thermoplastic Legend, White907-626-H010 | LF | $6.00 | 0% | – | 118 | |
| Right-of-Way Marker617-A001 | EA | $473 | +15% | $248 | 89 | |
| Guard Rail, Bridge End Section606-D001 | EA | $3,330 | +13% | $2,538 | 42 | |
| Concrete Curb, Special Design609-B003 | LF | $68.45 | +10% | – | 38 | |
| Radio Interconnect, Broadband, Short Range907-662-D002 | EA | $6,675 | −4% | – | 31 | |
| Channel Excavation, FM203-F001 | CY | $23.90 | −76% | $11.80 | 17 | |
| Temporary Traffic Stripe, Legend619-A6002 | LF | $1.50 | −25% | $1.00 | 475 | |
| Concrete Sidewalk, With Reinforcement608-B001 | SY | – | – | $180 | 13 | |
| Removal of Guard Rail Including Post, Blockouts & Hardware202-B150 | LF | $5.86 | +16% | $8.50 | 84 | |
| Thermoplastic Legend, White626-H004 | SF | – | – | $8.45 | 140 | |
| Repair of Cable Barrier System, Brifen907-610-A1002 | EA | $4,450 | – | $140 | 18 | |
| Removal of Pipe, 8" And Above202-B191 | LF | $20.00 | −36% | $18.60 | 157 | |
| Lighting Assembly, Per Plans907-683-PP001 | EA | – | – | – | 14 | |
| Guard Rail, Bridge End Section, Type H606-D019 | EA | $2,905 | +28% | $1,765 | 78 | |
| 18" Reinforced Concrete Pipe, Class III, Rubber Type Gaskets603-CA012 | LF | $117 | +41% | $400 | 13 | |
| 6" High Performance Cold Plastic Traffic Stripe, Continuous White907-628-H005 | LF | $10.00 | −9% | – | 46 | |
| Temporary Slope Drains239-A001 | LF | $12.00 | +62% | $10.73 | 56 | |
| Joint Repair907-808-A002 | LF | $1.25 | +14% | $5.06 | 107 | |
| Size 610 Crushed Stone Base, LVM304-H002 | CY | $80.00 | +33% | $98.50 | 29 | |
| Reinforcement, Corrosion Resistant805-C001 | LBS | $3.40 | +10% | $1.75 | 48 | |
| 6" High Performance Cold Plastic Traffic Stripe, Skip White628-G001 | LF | – | – | $7.50 | 54 | |
| Removal of Sign Including Post & Footing202-B215 | EA | $91.83 | +41% | $223 | 115 | |
| Interstate Directional Signs, Bolted Extruded Aluminum Panels, Ground Mounted630-B002 | SF | $34.98 | +11% | $29.38 | 47 | |
| Field Laboratory621-A001 | EA | $65,340 | −63% | $80,000 | 15 | |
| 6" Thermoplastic Double Drop Traffic Stripe, Skip Yellow907-626-D003 | MI | $2,500 | −47% | – | 47 | |
| Thermoplastic Audible Traffic Stripe, Centerline Skip - No-Passing Zone907-626-A004 | MI | $7,000 | −29% | – | 11 | |
| Video Vehicle Detection Processor, Type 1907-643-C002 | EA | $24,500 | +63% | – | 13 | |
| Saw Cut, Type I907-823-B001 | LF | $7.00 | +17% | $7.85 | 108 | |
| 6" Thermoplastic Edge Stripe, Continuous Yellow626-F003 | MI | – | – | $3,811 | 23 | |
| Removal of Debris and Sand From Box Culvert, 10-foot and Greater Width202-B096 | LF | $153 | +69% | – | 11 | |
| 6" Thermoplastic Double Drop Edge Stripe, Continuous White907-626-C011 | LF | $4.40 | +1% | – | 39 | |
| Thermoplastic Double Drop Legend, White907-626-H006 | SF | $12.50 | −3% | – | 50 | |
| Borrow Excavation, AH, LVM, Class B9203-EX040 | CY | $40.00 | −20% | $19.00 | 14 | |
| 6" Thermoplastic Traffic Stripe, Skip White626-A004 | MI | – | – | $1,950 | 38 | |
| 6" Thermoplastic Traffic Stripe, Skip Yellow626-D003 | MI | – | – | $2,175 | 72 | |
| Cold Milling of Bituminous Pavement, All Depths406-A001 | TON | – | – | $58.25 | 11 | |
| 6" Thermoplastic Double Drop Edge Stripe, Continuous White626-C001 | LF | – | – | $1.77 | 99 | |
| One-Way Clear Reflective High Performance Raised Markers627-M001 / 907-627-M001 | EA | $10.00 | −9% | – | 67 | |
| 6" High Performance Cold Plastic Traffic Stripe, Continuous Yellow907-628-J003 | LF | $10.00 | −17% | – | 37 | |
| Preformed Joint Seal, Type II907-823-A002 | LF | $40.00 | −20% | $33.00 | 86 | |
| Pole Foundation, 24" Diameter684-A003 | CY | $2,204 | +16% | – | 10 | |
| Thermoplastic Double Drop Legend, White907-626-H007 | LF | $6.03 | −15% | – | 63 | |
| Concrete Sidewalk, Without Reinforcement608-A001 | SY | $93.60 | −46% | $62.50 | 11 | |
| Barricades, Type III, Single Faced619-G4005 | LF | $23.10 | −4% | $16.75 | 253 | |
| Temporary Traffic Stripe, Continuous White619-A1002 | LF | $1.80 | −12% | $1.17 | 133 | |
| Removal of Concrete Paved Ditch202-B063 | SY | $24.00 | −31% | $9.30 | 74 | |
| Size 825B Crushed Stone Base, LVM304-H003 | CY | $163 | +12% | $80.66 | 15 | |
| Agricultural Limestone225-B001 | TON | $250 | +93% | $108 | 176 | |
| Borrow Excavation, AH, LVM, Class B9-6203-EX041 | CY | $36.00 | – | $13.00 | 16 | |
| Temporary Traffic Stripe, Continuous Yellow619-A2002 | LF | $1.50 | −29% | $1.23 | 127 | |
| FRP Wrap, Bi-directional907-824-B003 | SF | $185 | −30% | – | 16 | |
| Remove and Reset Riprap249-B001 | CY | $70.00 | +82% | $45.00 | 51 | |
| Mowing223-A001 | ACRE | $70.00 | +40% | $50.00 | 152 | |
| Standard Roadside Signs, LED Enhanced907-630-A001 | SF | – | – | $900 | 10 | |
| Pullbox Enclosure, Type 4907-637-A004 | EA | $1,664 | −2% | – | 12 | |
| Standard Roadside Signs, Sheet Aluminum, 0.1" Thickness630-A005 | SF | $22.60 | −2% | $23.85 | 157 | |
| Conventional Static Pile Load Test907-803-B001 | EA | $5,000 | 0% | $5,000 | 60 | |
| Thermoplastic Legend, White907-626-H009 | SF | $13.00 | +8% | – | 79 | |
| Removal of Fence, All Types202-B126 | LF | $8.38 | −11% | $2.29 | 24 | |
| Guard Rail, Bridge End Section, Type A606-D005 | EA | $2,803 | +9% | $1,838 | 53 | |
| Removal of Curb & Gutter, All Types202-B088 | LF | $12.50 | −50% | $17.59 | 59 | |
| 36" Reinforced Concrete Pipe, Class III603-CA055 | LF | $147 | −25% | $92.00 | 40 | |
| Edge Drain Outlets/Vents605-I001 / 907-605-I001 | LF | $163 | +153% | $100 | 10 | |
| Joint Sealant403-S002 / 907-403-S002 | LF | $1.00 | −95% | $0.59 | 18 | |
| Cleaning and Filling Joints413-D002 | LF | $8.50 | +18% | $10.00 | 17 | |
| 24" Reinforced Concrete End Section603-CB004 | EA | $1,311 | −18% | $950 | 84 | |
| Underground Branch Circuit, AWG 4, 3 Conductor682-A028 | LF | $80.00 | +360% | – | 10 | |
| Asphalt for Rejuvenating Fog Seal, Grade CMS-1PF907-410-D001 | GAL | $5.65 | −27% | $3.62 | 16 | |
| 6" Thermoplastic Double Drop Traffic Stripe, Continuous Yellow907-626-E004 | LF | $2.38 | −42% | – | 46 | |
| Underground Junction Box With Concrete Pad682-E003 | EA | $2,182 | +1% | – | 17 | |
| Concrete Driveway, Without Reinforcement614-A001 | SY | $319 | +154% | – | 17 | |
| Precast Concrete Median Barrier615-B001 | LF | $83.46 | +27% | $32.50 | 21 | |
| 9" and Variable Reinforced Concrete Pavement, Broom Finish503-A003 / 907-503-A003 | SY | $750 | −39% | $787 | 11 | |
| Rockbags246-B001 | EA | $11.80 | −32% | $11.00 | 78 | |
| 24" Type A Alternate Pipe603-ALT006 | LF | $83.99 | −16% | $43.05 | 46 | |
| 6" Thermoplastic Double Drop Traffic Stripe, Skip White626-A002 | LF | – | – | $1.17 | 56 | |
| Geotextile for Subsurface Drainage, Type III605-AA001 | SY | $4.00 | −73% | $5.00 | 87 | |
| 3/4" and Down Crushed Stone Base, LVM304-H001 | CY | $72.50 | +4% | $54.33 | 27 | |
| Solid State Traffic Actuated Controller, Type 1907-632-D001 | EA | $6,134 | +42% | $4,441 | 60 | |
| Guard Rail, Cable Anchor, Type 1606-C003 | EA | $1,826 | +62% | $800 | 56 | |
| 30" Reinforced Concrete Pipe, Class III603-CA040 | LF | $129 | −5% | $78.00 | 37 | |
| Ditch Liner217-A001 | SY | $3.63 | +54% | $2.00 | 108 | |
| Flowable Fill, Excavatable612-A001 | CY | $590 | −28% | $255 | 19 | |
| Transverse Grooving501-K001 | SY | $3.00 | −14% | $2.50 | 105 | |
| Removal of Cable Barrier202-B039 | LF | $17.25 | +86% | $4.50 | 10 | |
| Solid State Traffic Cabinet Assembly, Type III Cabinet, Type 1 Controller907-632-A007 | EA | $23,760 | −5% | – | 20 | |
| Radar Vehicle Detection Cable907-641-D001 | LF | $4.08 | +9% | $2.09 | 70 | |
| 48" Reinforced Concrete Pipe, Class III603-CA076 | LF | $220 | −12% | $137 | 19 | |
| 24" Reinforced Concrete Pipe, Class III, Rubber Type Gaskets603-CA027 | LF | $127 | −2% | $400 | 16 | |
| 18" Reinforced Concrete End Section603-CB003 | EA | $1,025 | −32% | $950 | 80 | |
| Red-Clear Reflective High Performance Raised Marker619-C6001 | EA | $11.97 | +14% | $5.85 | 30 | |
| On Street Video Equipment, Fixed Type907-650-A002 | EA | $3,002 | −25% | $2,898 | 18 | |
| On Street Video Equipment, PTZ Type907-650-A003 | EA | $4,314 | −33% | $7,698 | 20 | |
| Granular Material, Size 57304-D004 | TON | $111 | −49% | – | 12 | |
| Inlet Siltation Guard234-D001 / 907-234-D001 | EA | $653 | −12% | $585 | 64 | |
| 4" Perforated Sewer Pipe for Underdrains, SDR 23.5605-O002 | LF | $23.73 | −21% | $15.00 | 67 | |
| 6" High Performance Cold Plastic Traffic Stripe, Skip White907-628-G003 | LF | $9.07 | −9% | – | 21 | |
| Interstate Directional Signs, Bolted Extruded Aluminum Panels, Overhead Mounted630-B003 | SF | $35.00 | – | $31.50 | 16 | |
| Warning Lights, Type "B"619-G7001 | EA | $143 | −9% | $150 | 203 | |
| Thermoplastic Audible Traffic Stripe, Centerline Skip - Passing Zone907-626-A003 | MI | $4,750 | −52% | – | 11 | |
| Pullbox Enclosure, Type 2907-637-A002 | EA | $1,138 | −6% | $888 | 44 | |
| Flowable Fill, Non-Excavatable612-B001 | CY | $435 | +22% | $350 | 35 | |
| Guard Rail, Bridge End Section, Type D Modified606-D012 | EA | $2,694 | +16% | $1,808 | 29 | |
| Sandbags246-A001 | LF | $15.00 | 0% | $10.43 | 30 | |
| Roadside Directional Signs, Sheet Aluminum, 0.125" Thickness, Ground Mounted907-630-PP002 | SF | $27.59 | −27% | – | 25 | |
| Filter Material for Filter Beds, Type B605-X003 | CY | $77.80 | – | $30.00 | 11 | |
| Network Switch, Type F907-663-A006 | EA | – | – | – | 11 | |
| Silt Dike245-A001 | LF | $10.25 | −15% | $7.50 | 75 | |
| Combination Concrete Curb and Gutter Type 3A609-D008 | LF | $47.50 | +13% | $24.50 | 19 | |
| Guard Rail, Bridge End Section, Type I, Metal Post606-D023 | EA | $4,000 | +23% | $2,475 | 23 | |
| Temporary Traffic Stripe, Continuous White, Paint619-A1004 | MI | – | – | $1,200 | 23 | |
| Rockbags246-B002 | LF | $16.50 | −6% | $8.25 | 39 | |
| Pile Restrike907-803-J001 | EA | $1,750 | +30% | $1,261 | 71 | |
| Removal of Concrete Median & Island Pavement, All Depths202-B059 | SY | $37.75 | +23% | $34.54 | 44 | |
| Concrete for Base Repair503-D001 / 907-503-D001 | CY | $225 | −19% | $475 | 40 | |
| Pre-Grinding412-A001 | SF | $3.25 | 0% | $3.25 | 58 | |
| Temporary Traffic Stripe, Legend619-A6001 | SF | $2.02 | −33% | $1.65 | 232 | |
| Traffic Signal Head, Type 1635-A059 | EA | $1,238 | −5% | $820 | 37 | |
| Coir Fiber Baffle907-253-A001 | LF | $15.70 | +12% | $10.29 | 36 | |
| Encapsulating Field Painting907-824-F001 | SF | $255 | −11% | – | 13 | |
| Pullbox Enclosure, Type 5907-637-A005 | EA | $2,349 | +3% | – | 11 | |
| Type 3 Object Markers, OM-3R or OM-3L, Post Mounted630-G005 | EA | $108 | +2% | $100 | 189 | |
| Secondary Power Controller682-F001 | EA | $21,194 | −8% | – | 20 | |
| Delineators, Guard Rail, White630-F006 | EA | $30.00 | +9% | $19.00 | 333 | |
| Turbidity Barrier234-F001 / 907-234-F001 | LF | $40.00 | +3% | $18.50 | 46 | |
| Pole Foundation, 30" Diameter684-A004 | CY | $1,518 | +1% | – | 14 | |
| 42" Reinforced Concrete Pipe, Class III603-CA066 | LF | $172 | −14% | – | 15 | |
| Fine Milling of Concrete Pavement, All Depths406-E002 | SY | $22.38 | +54% | $25.05 | 17 | |
| 22" x 13" Concrete Arch Pipe, Class A III603-CE002 | LF | $117 | +24% | $80.00 | 25 | |
| Structural Steel Beams, W6 x 9630-D008 | LF | $93.00 | +6% | $69.10 | 28 | |
| Traffic Signal, Portable, Type 1907-619-H2001 | EA | $9,075 | −60% | $17,750 | 21 | |
| Guard Rail, Bridge End Section, Type H, Metal Post606-D020 | EA | $2,878 | +26% | $1,350 | 25 | |
| Standard Roadside Construction Signs, Less than 10 Square Feet619-D1001 | SF | $10.00 | +0% | $8.00 | 343 | |
| Power Service Pedestal907-632-J001 | EA | $5,093 | −2% | $4,000 | 29 | |
| Temporary Traffic Stripe, Continuous Yellow, Paint619-A2004 | MI | – | – | $1,300 | 20 | |
| Type 3 Object Markers, OM-3R or OM-3L630-G004 | EA | $140 | +27% | $75.00 | 101 | |
| Filter Material for Combination Storm Drain and/or Underdrains,Type C, FM605-W003 | CY | $100 | −18% | – | 20 | |
| Underground Branch Circuit, AWG 8, 3 Conductor682-A039 | LF | $12.60 | +7% | – | 12 | |
| Undersealing Concrete Pavement907-420-A002 | LBS | $6.00 | – | $5.30 | 13 | |
| Barricades, Type III, Double Faced619-G4001 | LF | $25.20 | +5% | $17.00 | 238 | |
| Impact Attenuator, 60 MPH619-J1004 | EA | $6,651 | −12% | $8,456 | 13 | |
| Pole Foundations, Class "B" Concrete907-634-C001 | CY | $1,095 | +3% | $800 | 25 | |
| 44" x 27" Concrete Arch Pipe, Class A III603-CE018 | LF | $195 | −3% | $115 | 13 | |
| On Street Video Equipment, PTZ Type, Signal Monitoring907-650-A004 | EA | $2,935 | −5% | – | 24 | |
| Vehicle Loop Assemblies907-640-A001 | LF | $25.46 | – | $13.00 | 21 | |
| Filter Material for Combination Storm Drain and/or Underdrains,Type A, FM605-W001 | CY | $125 | −38% | $100 | 95 | |
| Removal of Inlets, All Sizes202-B165 | EA | $1,100 | −23% | $620 | 52 | |
| Removal of Concrete Driveways, All Depths202-B052 | SY | $27.50 | −23% | $13.00 | 40 | |
| 6" Thermoplastic Double Drop Edge Stripe, Continuous Yellow626-F002 | LF | – | – | $1.45 | 46 | |
| Signal Radar Vehicle Detection Processor, Type 2907-641-F002 | EA | $6,560 | −14% | – | 14 | |
| Steel U-Section Posts, 3.0 lb/ft630-C003 | LF | $19.00 | +44% | $11.84 | 64 | |
| Removal of Asphalt Driveways, All Depths202-B004 | SY | $10.68 | −36% | $8.00 | 28 | |
| Underground Branch Circuit, AWG 2, 3 Conductor682-A018 | LF | $24.35 | +15% | – | 14 | |
| Removal of Box Culvert202-B018 | EA | $2,500 | −88% | $13,750 | 12 | |
| Traffic Signal Conduit, Underground, Type 4, 2"907-637-C028 | LF | $11.00 | −8% | $8.68 | 50 | |
| Traffic Signal Conduit, Underground Drilled or Jacked, Rolled Pipe, 3"907-637-D003 | LF | $19.00 | −42% | $12.00 | 30 | |
| Concrete Bridge End Barrier, 37.5"615-A024 | LF | $119 | +43% | $52.50 | 53 | |
| Equipment Cabinet, Type B907-660-A002 | EA | $6,762 | +27% | – | 11 | |
| Delineators, Post Mounted, Double White630-F010 | EA | $111 | +71% | $57.50 | 38 | |
| 36" Reinforced Concrete End Section603-CB006 | EA | $1,995 | −15% | $1,501 | 50 | |
| Accessible Pedestrian Detection Assembly907-645-B001 | EA | $979 | – | $898 | 12 | |
| Remove and Reset Impact Attenuator619-J3001 | EA | $2,768 | – | $2,321 | 21 | |
| Concrete Curb, Header609-B002 | LF | $55.00 | +2% | $33.73 | 19 | |
| 6" Thermoplastic Double Drop Edge Stripe, Continuous Yellow907-626-F004 | LF | $3.45 | −45% | – | 17 | |
| Concrete Integral Curb, Type 1609-C001 | LF | $43.10 | −4% | – | 21 | |
| Flashing Arrow Panel, Type C619-E1001 | EA | $4,091 | +54% | $2,250 | 49 | |
| Electric Cable, Underground in Conduit, IMSA 20-1, AWG 14, 8 Conductor907-636-B016 | LF | $3.95 | +1% | $1.90 | 30 | |
| Soil Reinforcing Mat224-A001 | SY | $3.92 | +21% | $3.72 | 40 | |
| Guard Rail, Terminal End Section, Double Faced606-E003 | EA | $11,995 | +24% | – | 12 | |
| Site Grading203-I002 | SY | $7.50 | −88% | $1.09 | 21 | |
| Temporary Traffic Stripe, Skip White619-A3002 | LF | $1.60 | −32% | $1.20 | 63 | |
| Traffic Signal, Portable, Type 2619-H2002 | EA | $9,250 | −58% | – | 11 | |
| Castings604-A001 | LBS | $6.55 | +19% | $4.92 | 51 | |
| Impact Attenuator, 45 MPH619-J1002 | EA | $5,000 | −39% | $5,299 | 19 | |
| Removal of Joint Material202-B169 | LF | $1.00 | −98% | $30.00 | 29 | |
| Welded & Seamless Steel Pipe Posts, 4"630-K003 | LF | $120 | – | $60.00 | 20 | |
| Trainees907-906001 | HRS | $5.00 | 0% | $5.00 | 93 | |
| Network Switch, Type A907-663-A001 | EA | $1,562 | +18% | – | 39 | |
| Welded & Seamless Steel Pipe Posts, 3"630-K002 | LF | – | – | $50.00 | 14 | |
| 30" Reinforced Concrete End Section603-CB005 | EA | $1,733 | −1% | $1,103 | 46 | |
| 36" Reinforced Concrete Pipe, Class III, Rubber Type Gaskets603-CA056 | LF | $198 | −34% | $450 | 12 | |
| Watering219-A001 | KGAL | $20.00 | 0% | $20.00 | 169 | |
| 29" x 18" Concrete Arch Pipe, Class A III603-CE008 | LF | $142 | +12% | $85.00 | 17 | |
| Removal of Legend, All Types202-B172 | SF | $8.00 | −45% | $2.20 | 22 | |
| 30" Reinforced Concrete Pipe, Class III, Rubber Type Gaskets603-CA041 | LF | – | – | $450 | 13 | |
| 6" Thermoplastic Double Drop Traffic Stripe, Skip Yellow626-D002 | LF | – | – | $2.00 | 58 | |
| Geogrid, Type II, Biaxial204-A003 / 907-204-A003 | SY | $5.00 | 0% | $6.00 | 44 | |
| Removal of Concrete Sidewalk202-B080 | SY | $23.55 | −21% | $15.00 | 18 | |
| 6" Thermoplastic Double Drop Traffic Stripe, Skip White907-626-A008 | LF | $2.90 | −10% | – | 26 | |
| Modify Existing Traffic Signal Cabinet Assembly907-632-C001 | EA | $1,023 | −46% | $2,073 | 35 | |
| Guard Rail, Class A, Type 1, Double Faced606-B006 | LF | $52.50 | – | – | 10 | |
| Traffic Signal Conduit, Underground Drilled or Jacked, Rolled Pipe, 2"907-637-D002 | LF | $16.00 | −25% | $12.45 | 28 | |
| Traffic Signal Head, Type 2 FYA635-A065 | EA | $2,154 | +15% | $1,500 | 32 | |
| Two-Way Yellow Reflective High Performance Raised Marker619-C7001 | EA | $12.70 | −15% | $10.50 | 47 | |
| 36" Type A Alternate Pipe603-ALT011 | LF | $102 | −10% | $88.06 | 14 | |
| Tie Bars, No. 5 Deformed Drilled and Epoxied or Grouted503-E002 | EA | $7.50 | −33% | $15.00 | 47 | |
| 48" Reinforced Concrete End Section603-CB008 | EA | $2,999 | −14% | $2,457 | 22 | |
| 30" Type A Alternate Pipe603-ALT009 | LF | $81.00 | −19% | $65.00 | 23 | |
| Underground Junction Box682-E002 | EA | $763 | −49% | – | 14 | |
| Square Post Inner Sleeve630-C1001 | LF | $20.00 | +14% | – | 26 | |
| 6" Perforated Sewer Pipe for Underdrains, SDR 23.5605-O004 | LF | $32.92 | – | $23.69 | 19 | |
| Network Switch, Type E907-663-A005 | EA | $36,455 | +87% | – | 12 | |
| Removal of Box Culvert202-B019 | LF | $632 | +220% | – | 13 | |
| Geotextile Stabilization, Type V209-A004 | SY | $3.00 | – | $7.75 | 15 | |
| Joint Repair Without Epoxy907-808-A003 | LF | $3.00 | +100% | $5.00 | 48 | |
| 6" High Performance Cold Plastic Traffic Stripe, Skip Yellow628-I002 | LF | – | – | $7.50 | 48 | |
| 6" Thermoplastic Double Drop Traffic Stripe, Continuous White907-626-B003 | LF | $2.50 | −49% | – | 28 | |
| Hydroseeding227-A001 | ACRE | $4,648 | +47% | $2,650 | 21 | |
| Removal of Curb, All Types202-B092 | LF | $26.75 | −44% | $36.58 | 21 | |
| Type 3 Object Markers, OM-3R or OM-3L, 2 Markers Per Post, Post Mounted630-G006 | EA | $169 | +125% | $122 | 27 | |
| Saw Cut, Type II907-823-B002 | LF | $8.13 | +8% | $9.00 | 53 | |
| High Performance Cold Plastic Detail Stripe, White628-K001 | LF | – | – | $7.95 | 11 | |
| Removal of Concrete Slope Paving202-B083 | SY | $445 | +456% | $33.00 | 15 | |
| Impact Attenuator, 60 MPH, Replacement Package619-J2004 | EA | $3,586 | −38% | $4,034 | 11 | |
| 58" x 36" Concrete Arch Pipe, Class A III603-CE028 | LF | – | – | $180 | 10 | |
| Guard Rail, Bridge End Section, Type A Modified606-D006 | EA | $2,625 | −8% | – | 16 | |
| Delineators, Post Mounted, Single White630-F012 | EA | $99.53 | +64% | $45.00 | 44 | |
| Geotextile Stabilization, Type VII, Non-Woven209-A009 | SY | $5.00 | 0% | $6.00 | 40 | |
| Temporary Traffic Stripe, Detail, Paint619-A5002 | LF | $1.30 | +72% | $0.32 | 44 | |
| Removal of Cement Treated Base, All Depths202-B045 | SY | $10.00 | −72% | $50.00 | 17 | |
| Removal of Curb &/or Curb and Gutter, All Types202-B089 | LF | $16.00 | +10% | $36.58 | 19 | |
| Installation and Removal of Guardrail, Terminal End Section619-K4001 | EA | $4,825 | +211% | $1,575 | 17 | |
| 42" Reinforced Concrete End Section603-CB007 | EA | $4,138 | +38% | $3,000 | 20 | |
| Saw Cut, Longitudinal Joints503-B001 | LF | $20.00 | +42% | $16.65 | 45 | |
| Street Name Sign907-653-B001 | SF | $150 | +50% | $37.50 | 25 | |
| Guard Rail, Bridge End Section, Type G, Modified606-D018 | EA | $2,659 | −7% | $1,650 | 10 | |
| 6" Thermoplastic Traffic Stripe, Continuous Yellow626-E003 | LF | – | – | $2.89 | 16 | |
| Remove and Reset Signs, All Sizes619-D3001 | EA | $306 | +53% | $400 | 27 | |
| 4" Non-perforated Sewer Pipe for Underdrains, SDR 23.5605-P002 | LF | $30.00 | −37% | $15.00 | 64 | |
| Delineators, Flexible Post Mounted, Crossover, Type I, Yellow630-F002 | EA | $92.31 | +15% | $60.00 | 49 | |
| 6" Thermoplastic Traffic Stripe, Continuous Yellow907-626-E006 | LF | $5.50 | +3% | – | 22 | |
| High Performance Cold Plastic Detail Stripe, Yellow628-K002 | LF | – | – | $7.40 | 12 | |
| Welded & Seamless Steel Pipe Posts, 3 1/2"630-K001 | LF | $71.25 | – | $55.00 | 13 | |
| Temporary Traffic Stripe, Continuous White, Paint619-A1003 | LF | $3.06 | +155% | $0.35 | 39 | |
| Special Sections, Guard Rail Bridge End Connector606-G002 | EA | $1,959 | −24% | $1,413 | 16 | |
| Concrete Bridge End Barrier, 33.5"615-A002 | LF | – | – | $61.00 | 11 | |
| Reset Inlet Siltation Guard234-E001 / 907-234-E001 | EA | $284 | −31% | $325 | 25 | |
| Impact Attenuator, 70 MPH619-J1005 | EA | $6,074 | – | $5,247 | 12 | |
| Guard Rail, Class A, Type 1, Thrie Beam606-B010 | LF | $55.47 | +32% | – | 13 | |
| Guard Rail, Cable Anchor Type 1, Metal Post606-C001 | EA | $1,698 | +6% | $773 | 24 | |
| Delineators, Guard Rail, Yellow630-F007 | EA | $30.00 | +10% | $19.00 | 118 | |
| 44" x 27" Concrete Arch Pipe End Section603-CF005 | EA | $3,728 | +49% | $2,560 | 16 | |
| 6" Thermoplastic Edge Stripe, Continuous White907-626-C013 | LF | $4.75 | −11% | – | 16 | |
| Removal of Flared End Section, All Sizes202-B129 | EA | $500 | −50% | $573 | 44 | |
| Temporary Traffic Stripe, Continuous White, Type 1 or 2 Tape619-A1007 | LF | $3.00 | +43% | $3.26 | 25 | |
| Temporary Erosion Checks235-A001 | EA | – | – | $10.86 | 32 | |
| Erosion Control Blanket, Type II907-228-A002 | SY | $3.00 | – | $2.98 | 11 | |
| Special Sections, Bridge Connector606-G001 | EA | $900 | −21% | – | 18 | |
| Expansion Joints, With Dowels501-D001 | LF | $11.68 | −28% | $24.15 | 22 | |
| Impact Attenuator, 45 MPH, Replacement Package619-J2002 | EA | $2,575 | −21% | $2,750 | 15 | |
| 58" x 36" Concrete Arch Pipe End Section603-CF007 | EA | – | – | $4,225 | 11 | |
| Traffic Signal Equipment Pole Air Ground907-634-PP005 | EA | – | – | – | 20 | |
| Traffic Signal Head, Type 3635-A070 | EA | $1,900 | −1% | $1,097 | 28 | |
| Temporary Traffic Stripe, Continuous Yellow, Paint619-A2003 | LF | $3.06 | +155% | $0.35 | 35 | |
| 54" Reinforced Concrete End Section603-CB009 | EA | $3,060 | −33% | $4,250 | 13 | |
| Combination Concrete Curb and Gutter Type 1609-D001 | LF | $32.25 | – | $42.50 | 10 | |
| Delineators, Guard Rail, White619-F3001 | EA | $33.80 | +25% | $25.15 | 72 | |
| Guard Rail, Bridge End Section, Type C606-D009 | EA | $2,803 | +18% | – | 11 | |
| Delineators, Post Mounted, Single Yellow630-F013 | EA | $100 | +80% | $50.83 | 40 | |
| Adjustment of Manhole613-D005 | EA | $2,213 | – | $1,086 | 15 | |
| 6" Thermoplastic Edge Stripe, Continuous White626-C003 | LF | – | – | $8.00 | 10 | |
| Video Vehicle Detection Cable907-643-B001 | LF | $1.50 | −25% | $2.62 | 33 | |
| 6" Thermoplastic Traffic Stripe, Continuous White907-626-B005 | LF | $3.25 | – | – | 18 | |
| Temporary Traffic Stripe, Continuous White, Type 1 Tape619-A1005 | LF | $4.83 | +61% | $2.87 | 15 | |
| Traffic Signal Equipment Pole Shaft Extension, 10'907-634-B001 | EA | $1,588 | −15% | – | 17 | |
| Fiber Optic Drop Cable, 12 SM907-661-B002 | LF | $3.25 | +8% | $4.00 | 15 | |
| Temporary Traffic Stripe, Skip Yellow619-A4001 | LF | $2.00 | +23% | $0.50 | 45 | |
| Temporary Traffic Stripe, Continuous Yellow, Type 1 or 2 Tape619-A2008 | LF | – | – | $2.02 | 17 | |
| 6" High Performance Cold Plastic Traffic Stripe, Skip Yellow907-628-I004 | LF | $10.00 | +11% | – | 20 | |
| 22" x 13" Concrete Arch Pipe End Section603-CF002 | EA | $1,374 | +9% | $1,110 | 18 | |
| Pullbox Enclosure, Type 3907-637-A003 | EA | $1,600 | −6% | $1,050 | 31 | |
| Delineators, Post Mounted, Double Yellow630-F011 | EA | $111 | +52% | $57.50 | 37 | |
| Removal of Island Pavement, All Types202-B168 | SY | $154 | +481% | $13.60 | 15 | |
| Traffic Signal Head, Type 6635-A076 | EA | $1,144 | – | $705 | 14 | |
| 36" x 23" Concrete Arch Pipe, Class A III603-CE013 | LF | $135 | −40% | $85.00 | 10 | |
| 6" Non-perforated Sewer Pipe for Underdrains, SDR 23.5605-P004 | LF | $30.92 | – | $25.00 | 18 | |
| Removal of Riprap202-B208 | SY | $32.20 | −8% | – | 14 | |
| Electric Cable, Underground in Conduit, IMSA 20-1, AWG 14, 5 Conductor907-636-B014 | LF | $3.00 | – | $1.20 | 15 | |
| Class "C" Structural Concrete, Minor Structures601-B002 / 907-601-B002 | CY | $5,987 | +299% | $2,500 | 12 | |
| Traffic Signal Conduit, Underground, Type 4, 3"907-637-C030 | LF | $15.00 | −3% | $10.00 | 26 | |
| Temporary Traffic Stripe, Continuous Yellow, Type 1 Tape619-A2006 | LF | $4.83 | – | $2.87 | 13 | |
| Underground Branch Circuit, Jacked or Bored, AWG 8, 3 Conductor682-B037 | LF | $19.20 | −5% | – | 12 | |
| Malfunction Management Unit907-632-G001 | EA | $1,995 | +1% | – | 23 | |
| Detectable Warning Panels907-608-C001 | SF | $39.02 | −48% | $42.50 | 17 | |
| Saw Cut, 3-inch503-C004 | LF | $1.85 | −65% | $25.00 | 23 | |
| Removal of Sign202-B213 | EA | $25.55 | −77% | $89.95 | 35 | |
| 29" x 18" Concrete Arch Pipe End Section603-CF003 | EA | $2,009 | +10% | $1,650 | 17 | |
| Filter Material for Filter Beds, Type A605-X002 | CY | $115 | −87% | $107 | 13 | |
| Insect Pest Control220-A001 | ACRE | $30.00 | 0% | $30.00 | 166 | |
| 6" Thermoplastic Double Drop Traffic Stripe, Skip Yellow907-626-D004 | LF | $10.00 | +400% | – | 19 | |
| Remove and Reset Sign, All Sizes907-630-O004 | EA | $1,500 | +2900% | $4,250 | 10 | |
| Expansion Joints, Without Dowels501-E001 | LF | $16.73 | −67% | $13.07 | 25 | |
| Delineators, Flexible Post Mounted, Crossover, Type II630-F003 | EA | $86.54 | −11% | $75.00 | 33 | |
| Temporary Traffic Stripe, Legend, Paint619-A6004 | LF | $0.75 | −67% | $1.18 | 27 | |
| Traffic Sign907-653-A001 | SF | $105 | +22% | $23.00 | 12 | |
| Traffic Signal Head, Type 2635-A061 | EA | $1,418 | +9% | $884 | 14 | |
| Electric Cable, Underground in Conduit, THHN, AWG #6, 3 Conductor907-636-B053 | LF | $5.76 | +37% | – | 13 | |
| Thermoplastic Legend, Blue-ADA Handicap Symbol907-626-H001 | EA | $582 | −3% | $850 | 22 | |
| Traffic Signal Equipment Pole, Type VI, 8' Shaft907-634-A545 | EA | $2,075 | – | $2,368 | 11 | |
| Electric Cable, Underground in Conduit, IMSA 20-1, AWG 10, 2 Conductor907-636-B003 | LF | $3.00 | −12% | – | 17 | |
| Remove and Reset Sign Assembly907-630-O001 | EA | $1,482 | – | – | 10 | |
| Category 6 Cable, Installed in Conduit907-663-D001 | LF | $2.21 | +5% | $1.00 | 21 | |
| Removal of Impact Attenuator202-B162 | EA | $1,714 | −30% | – | 13 | |
| Electric Cable, Aerial Supported in Conduit, IMSA 20-1, AWG 14, 8 Conductor907-636-D008 | LF | $5.15 | +5% | – | 20 | |
| Warning Lights, Type "C"619-G8001 | EA | $65.75 | −20% | – | 27 | |
| Guard Rail, Bridge Connector, Per Plans907-606-PP005 | EA | $1,346 | −1% | – | 11 | |
| Removal of Guard Rail Terminal End Section202-B152 | EA | – | – | $200 | 17 | |
| Temporary Traffic Stripe, Skip Yellow, Paint619-A4004 | MI | – | – | $1,200 | 11 | |
| 6" Thermoplastic Traffic Stripe, Skip White907-626-A009 | LF | $4.75 | – | – | 12 | |
| 4" Perforated Pipe for Underdrains605-T001 | LF | $25.00 | −47% | $15.00 | 10 | |
| Thermoplastic Detail Stripe, Blue-ADA626-G001 | LF | – | – | $10.00 | 20 | |
| Removal of Delineator, All Types202-B117 | EA | $49.97 | +354% | $5.75 | 23 | |
| Guard Rail, Class A, Type 1, Thrie Beam, Transition Section606-B013 | LF | $50.33 | +5% | $38.50 | 18 | |
| 36" x 23" Concrete Arch Pipe End Section603-CF004 | EA | $1,857 | −26% | $1,850 | 10 | |
| Sandbags246-A002 | EA | – | – | $8.75 | 12 | |
| Traffic Signal Head, Type 4635-A073 | EA | $1,325 | – | $1,350 | 13 | |
| Multi-Sensor Vehicle Detection Cable907-643-F001 | LF | $1.90 | +90% | – | 14 | |
| Delineators, Guard Rail, Yellow619-F3002 | EA | $37.43 | +47% | $30.00 | 22 | |
| Exploration803-N001 | LF | $1.00 | 0% | $1.00 | 15 | |
| Structural Steel Angles & Bars, 7/16" x 2 1/2" Flat Bar630-E004 | LBS | $4.14 | +728% | $2.98 | 28 | |
| Electric Cable, Underground in Conduit, IMSA 20-1, AWG 8, 3 Conductor907-636-B028 | LF | $6.70 | +44% | $2.25 | 19 | |
| Geotextile for Subsurface Drainage, Type V, Non-Woven605-AA003 | SY | – | – | $3.80 | 10 | |
| Removal of Guard Rail Bridge End Section202-B138 | EA | – | – | $418 | 15 | |
| Type 3 Object Markers, OM-3L, Post Mounted630-G003 | EA | $110 | −27% | $75.00 | 41 | |
| Removal of Legend, All Types202-B171 | LF | $9.75 | −17% | – | 10 | |
| Steel U-Section Posts, 2.0 lb/ft630-C002 | LF | $17.99 | – | $10.00 | 29 | |
| Type 3 Object Markers, OM-3R, Post Mounted630-G007 | EA | $110 | −27% | $75.00 | 37 | |
| 6" Thermoplastic Traffic Stripe, Skip Yellow626-D004 | LF | – | – | $0.50 | 10 | |
| Structural Steel Angles & Bars, 3 1/2" x 3 1/2" x 1/4" Angles630-E001 | LBS | $8.40 | +68% | $3.25 | 21 | |
| Temporary Traffic Stripe, Skip Yellow, Paint619-A4003 | LF | – | – | $0.35 | 14 | |
| Structural Steel Angles & Bars, Aluminum Unistrut630-E005 | LBS | $4.50 | −46% | – | 11 | |
| Structural Steel Angles & Bars, 3" x 3" x 1/4" Angles630-E002 | LBS | $5.25 | +26% | $2.66 | 23 | |
| 6" Thermoplastic Traffic Stripe, Skip Yellow907-626-D006 | LF | $4.27 | – | – | 11 | |
| Structural Steel Angles & Bars, 4" x 4" x 5/16" Angles630-E003 | LBS | $10.13 | +101% | $3.75 | 10 | |
| 1" Smooth Dowel Bars, Drilled & Epoxied or Grouted503-F002 | EA | $8.00 | −54% | $22.15 | 11 | |
| Temporary Traffic Stripe, Legend, Paint619-A6003 | SF | – | – | $2.35 | 11 | |
| Electric Cable, Aerial Supported in Conduit, IMSA 20-1, AWG 10, 2 Conductor907-636-D001 | LF | $3.60 | −28% | – | 11 | |
| Two-Way Blue Reflective High Performance Raised Markers627-P001 / 907-627-P001 | EA | $23.00 | −8% | $8.00 | 46 | |
| Removal of Guard Post202-B135 | EA | $33.00 | +280% | $14.86 | 10 | |
| Additional Construction Signs618-B001 | SF | $10.00 | 0% | $10.00 | 516 | |
| Repair of Cable Barrier Terminal End, Brifen907-610-B1001 | EA | – | – | $0.010 | 17 |
Lump-sum items are left out. MDOT's 907- special-provision codes are merged with the standard item when the description and unit match.
BidCrew tracks every DOT letting: line-item prices, competitor history, and a predicted low bid before you submit.