BidCrew Data
BidCrew Data / Mississippi / Prices / Right-of-Way Marker
MDOT pay item · 617-A001

Right-of-Way Marker: Mississippi winning bid prices

The low bidder priced right-of-way marker at a median $473 per each over the last 12 months (10 contracts), up 15% from the year before and up 91% since 2020.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$473
10 contracts
Median, prior 12 months
$411
10 contracts
Median, 2020
$248
7 contracts
Winner vs. field
5% below
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$200$300$400$500$600$7002020202120222023202420252026*$495
Price vs. quantityEvery winning price since 2020 (log scale)
$0$500$1,000$1,50010100
Does quantity matter?Median winning price by quantity band
$0$100$200$300$400$500$431≤9$3509–22$34822–38$315>38

The last 20 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Oct 27, 2026Construction project, Madison CountyMadison3 EA$525$5253
Oct 27, 2026Bridge Replacement on SR 28 between the Copiah County Line & Pinola (Bridge Nos. 72.7 & 73Simpson44 EA$708–1
Sep 29, 2026Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin20 EA$495$4486
Sep 1, 2026Bridge Replacement on US 51 over unnamed Streams (Bridge Nos. 11.7 & 12.1) & between MagnoPike60 EA$384$4203
Sep 1, 2026Bridge Replacements on SR 32 between Webb & Charleston (Bridge Nos. 45.6, 46.2 & 47.0)Tallahatchie26 EA$400$4136
Aug 25, 2026SR 145 Bridge Replacement (Bridge No. 210.8), Known as Federal Aid Project No. STBG-0053-0Lee8 EA$450$4108
Jun 23, 2026Roundabout on US 51 at Green T RoadDeSoto15 EA$400$4006
May 27, 2026Bridge Replacement on SR 427 (Bridge No. 4.4) between SR 488 & SR 16Leake28 EA$590$4498
Feb 3, 2026Slide Repair on US 61 Southbound across from Fire Tower RoadAdams5 EA$1,000$1,0004
Nov 25, 2025Bridge Replacement on SR 481 between SR 902 & SR 35 (Bridge Nos. 2.1 & 2.3)Smith44 EA$444$4447
Sep 23, 2025Bridge Replacement on SR 704 (Bridge No. 162.5)Benton9 EA$400$4284
Sep 23, 2025Grade, Drain, Bridge & Pave 4 Lanes on SR 7 from CR 370 to 0.4 miles south of SR 6, known Lafayette338 EA$350$3503
Jun 26, 2025Bridge Replacements on US 80 between Chunky & Meehan (Bridge Nos. 123.1, 123.3, 123.5 & 12Lauderdale, Madison, Newton232 EA$525$5253
Mar 4, 2025Grade Bridge, Pave 2-Lane on SR 19 from 0.25 miles South of SR 492 to Tucker DriveNeshoba274 EA$400$3512
Feb 25, 2025Bank Stabilization on SR 37 over Oakohay Creek (Bridge No. 4.3)Covington4 EA$1,000$1,0008
Jan 28, 2025Bridge Replacement on SR 14 over Hashuqua Creek (Bridge No. 156.5)Noxubee20 EA$375$3755
Jan 28, 2025Drainage Improvements on US 61 near BlakelyWarren8 EA$888–1
Dec 5, 2024Interchange Reconstruction on I-20 at FlowersWarren13 EA$412$6003
Nov 26, 2024Intersection Improvements on US 49 at SR 35Covington7 EA$431$4253
Nov 7, 2024Bridge Replacement on SR 12 over the Sunflower River (Bridge No. 23.9)Humphreys, Washington46 EA$410$4734

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.