MDOT let 1 contract worth $97.4M at the low bid, with 2.00 bidders per contract (the 12-month average is 3.70). W. G. Yates & Sons Construction Company won the most, $97.4M.
| Call | Contract | Low bidder | Low bid | Second | Gap | Bidders | vs. estimate |
|---|---|---|---|---|---|---|---|
| 9 | Grade Bridge, Pave 2-Lane on SR 19 from 0.25 miles South of SR 492 to Tucker DriveNeshoba · Bridge repair & rehab · 101649301 | W. G. Yates & Sons Construction Company2nd: Eutaw Construction Company, Inc. | $97.4M | $104M | 7.2% | 2 | +8.5% |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew.
BidCrew tracks every DOT letting: line-item prices, competitor history, and a predicted low bid before you submit.