MDOT letting · Regular

February 25, 2025 MDOT letting: 11 contracts, $85.9M

MDOT let 11 contracts worth $85.9M at the low bid, with 3.09 bidders per contract (the 12-month average is 3.70). APAC - Mississippi, Inc. won the most, $34.3M; 7 firms won at least one contract. The closest finish: Remove & Replace approximately 13 miles of OGFC on I-20 from East Brandon to the, decided by 0.4% ($48K). MDOT later rejected the bids on 1 more contract from this letting and re-let it.

Awarded at low bid
$85.9M
11 contracts
Bidders per contract
3.09
single-bid 18%
Low bid vs. estimate
−1.5%
median
Low-to-second gap
$9.9M
median 10.9%
CallContractLow bidderLow bidSecondGapBiddersvs. estimate
4Mill & Overlay approximately 14 miles of US 72 from the Tippah County Line to SR 2Alcorn · Overlay & resurfacing · 109451301APAC - Mississippi, Inc.2nd: WG Construction Company, Inc.$14.8M$15.7M6.2%3−0.7%
10Mill & Overlay approximately 7 miles of US 278 from the east side of the ICGRR Overpass to east of Terza RoadPanola · Overlay & resurfacing · 108710301Lehman-Roberts Company2nd: Cook & Son, LLC$13.6M$16.5M21.6%2−6.7%
8Remove & Replace approximately 13 miles of OGFC on I-20 from East Brandon to the Scott County Line & Fog Seal approximatRankin · Overlay & resurfacing · 109481301APAC - Mississippi, Inc.2nd: Dickerson & Bowen, Inc.$11.2M$11.3M0.4%3+8.0%
5Safety Improvements on US 49 from the crossover past US 49 at the SR 13 interchange to 1000' past US 49 at the SR 149 inSimpson · Intersections & safety · 109138301T. L. Wallace Construction, Inc.2nd: Walters Construction Co., Inc.$11.1M$11.3M2.0%5−1.5%
6Remove & Replace approximately 17 miles of OGFC on I-10 from the Pearl River Bridge to west of the Diamondhead InterchanHancock · Bridge repair & rehab · 109479301Warren Paving, Inc.$10.4M––1+8.6%
12Mill & Overlay approximately 9 miles of US 51 from the Madison City Limits to Dinkins StreetMadison · Overlay & resurfacing · 109022301APAC - Mississippi, Inc.2nd: A J Construction, Inc.$8.2M$8.7M5.2%2+9.6%
7Mill & Overlay approximately 8 miles of US 98 from the end of the 5-Lane to the Bogue Chitto RiverPike · Overlay & resurfacing · 108718301Dickerson & Bowen, Inc.$5.4M––1−6.9%
1Smith Tree Removal along Various Routes in District 7Covington, Simpson · Construction & widening · 309621316Holliday Construction, LLC2nd: Looks Great Services of MS, Inc.$4.8M$8.2M73.3%3+7.1%
13Clarke Microsurface approximately 32 miles & Scrub Seal approximately 7 miles of various routes throughout the DistrictJasper, Greene · Overlay & resurfacing · 108959301T. L. Wallace Construction, Inc.2nd: Vance Brothers, LLC$3.8M$4.2M10.9%2−5.6%
3Tree Removal along I-55 in DistrictLincoln, Pike · Construction & widening · 309619343Holliday Construction, LLC2nd: Scott Johnson Specialty Services, LLC$2.1M$3.5M63.7%4−4.6%
11Bank Stabilization on SR 37 over Oakohay Creek (Bridge No. 4.3)Covington · Bridge repair & rehab · 108817301Midway Construction, Inc.2nd: Maynord Landscaping Co., Inc.$462K$565K22.1%8−39.7%

Bids rejected and re-let

CallContractLow bidderLow bidBiddersvs. estimateRe-let
2Pike Tree Removal along Various Routes in District 7Lawrence, Lincoln · 309620339Looks Great Services of MS, Inc.$7.1M2–Apr 22, 2025

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew.