MDOT let 11 contracts worth $85.9M at the low bid, with 3.09 bidders per contract (the 12-month average is 3.70). APAC - Mississippi, Inc. won the most, $34.3M; 7 firms won at least one contract. The closest finish: Remove & Replace approximately 13 miles of OGFC on I-20 from East Brandon to the, decided by 0.4% ($48K). MDOT later rejected the bids on 1 more contract from this letting and re-let it.
| Call | Contract | Low bidder | Low bid | Second | Gap | Bidders | vs. estimate |
|---|---|---|---|---|---|---|---|
| 4 | Mill & Overlay approximately 14 miles of US 72 from the Tippah County Line to SR 2Alcorn · Overlay & resurfacing · 109451301 | APAC - Mississippi, Inc.2nd: WG Construction Company, Inc. | $14.8M | $15.7M | 6.2% | 3 | −0.7% |
| 10 | Mill & Overlay approximately 7 miles of US 278 from the east side of the ICGRR Overpass to east of Terza RoadPanola · Overlay & resurfacing · 108710301 | Lehman-Roberts Company2nd: Cook & Son, LLC | $13.6M | $16.5M | 21.6% | 2 | −6.7% |
| 8 | Remove & Replace approximately 13 miles of OGFC on I-20 from East Brandon to the Scott County Line & Fog Seal approximatRankin · Overlay & resurfacing · 109481301 | APAC - Mississippi, Inc.2nd: Dickerson & Bowen, Inc. | $11.2M | $11.3M | 0.4% | 3 | +8.0% |
| 5 | Safety Improvements on US 49 from the crossover past US 49 at the SR 13 interchange to 1000' past US 49 at the SR 149 inSimpson · Intersections & safety · 109138301 | T. L. Wallace Construction, Inc.2nd: Walters Construction Co., Inc. | $11.1M | $11.3M | 2.0% | 5 | −1.5% |
| 6 | Remove & Replace approximately 17 miles of OGFC on I-10 from the Pearl River Bridge to west of the Diamondhead InterchanHancock · Bridge repair & rehab · 109479301 | Warren Paving, Inc. | $10.4M | – | – | 1 | +8.6% |
| 12 | Mill & Overlay approximately 9 miles of US 51 from the Madison City Limits to Dinkins StreetMadison · Overlay & resurfacing · 109022301 | APAC - Mississippi, Inc.2nd: A J Construction, Inc. | $8.2M | $8.7M | 5.2% | 2 | +9.6% |
| 7 | Mill & Overlay approximately 8 miles of US 98 from the end of the 5-Lane to the Bogue Chitto RiverPike · Overlay & resurfacing · 108718301 | Dickerson & Bowen, Inc. | $5.4M | – | – | 1 | −6.9% |
| 1 | Smith Tree Removal along Various Routes in District 7Covington, Simpson · Construction & widening · 309621316 | Holliday Construction, LLC2nd: Looks Great Services of MS, Inc. | $4.8M | $8.2M | 73.3% | 3 | +7.1% |
| 13 | Clarke Microsurface approximately 32 miles & Scrub Seal approximately 7 miles of various routes throughout the DistrictJasper, Greene · Overlay & resurfacing · 108959301 | T. L. Wallace Construction, Inc.2nd: Vance Brothers, LLC | $3.8M | $4.2M | 10.9% | 2 | −5.6% |
| 3 | Tree Removal along I-55 in DistrictLincoln, Pike · Construction & widening · 309619343 | Holliday Construction, LLC2nd: Scott Johnson Specialty Services, LLC | $2.1M | $3.5M | 63.7% | 4 | −4.6% |
| 11 | Bank Stabilization on SR 37 over Oakohay Creek (Bridge No. 4.3)Covington · Bridge repair & rehab · 108817301 | Midway Construction, Inc.2nd: Maynord Landscaping Co., Inc. | $462K | $565K | 22.1% | 8 | −39.7% |
| Call | Contract | Low bidder | Low bid | Bidders | vs. estimate | Re-let |
|---|---|---|---|---|---|---|
| 2 | Pike Tree Removal along Various Routes in District 7Lawrence, Lincoln · 309620339 | Looks Great Services of MS, Inc. | $7.1M | 2 | – | Apr 22, 2025 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew.
BidCrew tracks every DOT letting: line-item prices, competitor history, and a predicted low bid before you submit.