BidCrew Data
BidCrew Data / Mississippi / Lettings / Apr 22, 2025
MDOT letting · Regular

April 22, 2025 MDOT letting: 10 contracts, $22.1M

MDOT let 10 contracts worth $22.1M at the low bid, with 3.10 bidders per contract (the 12-month average is 3.70). Holliday Construction, LLC won the most, $4.0M; 9 firms won at least one contract. The closest finish: Mill & Overlay approximately 1.3 miles of SR 7 from US 82 to Grenada Boulevard E, decided by 2.8% ($41K). MDOT later rejected the bids on 1 more contract from this letting and re-let it.

Awarded at low bid
$22.1M
10 contracts
Bidders per contract
3.10
single-bid 10%
Low bid vs. estimate
−1.0%
median
Low-to-second gap
$13.3M
median 30.9%
CallContractLow bidderLow bidSecondGapBiddersvs. estimate
4Tree Removal along Various Routes in District 7Jefferson Davis, Marion, Walthall · Construction & widening · 309623333Holliday Construction, LLC2nd: Looks Great Services of MS, Inc.$4.0M$5.9M47.6%2+32.0%
14Tree Removal on Various RoutesLawrence, Lincoln, Pike · Construction & widening · 309620339Magnolia Utility Services, LLC2nd: Patriot Contracting Group, LLC$3.9M$5.1M30.9%3−29.1%
1Tree Removal along Various Routes in District 3Claiborne, Copiah, Jefferson · Construction & widening · 309666311Landmark Contracting, Inc.2nd: Magnolia Utility Services, LLC$3.0M$4.9M65.0%5+9.5%
11Mill & Overlay approximately 7 miles of SR 350 from the Alcorn County Line to SR 25Tishomingo · Overlay & resurfacing · 309569301WG Construction Company, Inc.2nd: Cook & Son, LLC$2.9M$3.2M9.7%3−10.7%
12Rankin & Scott Tree Removal on Various RoutesHinds, Kemper, Lauderdale, Leake, Madison, Neshoba, Newton, Noxubee, Rankin, Scott · Construction & widening · 309692325Joe McGee Construction Company, Inc.2nd: Looks Great Services of MS, Inc.$2.6M$10.0M287.2%2−42.0%
8Bridge Repair on US 80 over Pearl River Relief (Bridge No. 46.9)Rankin · Bridge repair & rehab · 109500301Key, LLC$2.1M––1−1.4%
10Mill & Overlay approximately 1.3 miles of SR 7 from US 82 to Grenada Boulevard ExtendedLeflore · Overlay & resurfacing · 109744301Falcon Contracting Company, Inc.2nd: APAC - Mississippi, Inc.$1.5M$1.5M2.8%3−18.2%
2Tree Removal along Various Routes in District 3Copiah, Warren · Construction & widening · 309665315Fandal Ruiz Contracting Solutions, LLC2nd: Landmark Contracting, Inc.$1.4M$1.9M36.6%6+9.9%
5Intersection Improvements on US 49 from Desoto Park Road to 500' south of East Wortham Road (Palmer Creek Road)Harrison · Intersections & safety · 109323301Powell Construction Services, Inc.2nd: Lamey Electric, Inc.$715K$794K11.2%2−0.7%
9Bridge Repair on Wildwood Road over I-55 (Bridge No. 134.1)Yazoo · Bridge repair & rehab · 109651301Key, LLC2nd: Century Construction Group, Inc.$85K$95K12.4%4+9.2%

Bids rejected and re-let

CallContractLow bidderLow bidBiddersvs. estimateRe-let
13Tree Removal on Various RoutesHinds, Madison, Rankin · 309693325Fandal Ruiz Contracting Solutions, LLC$900K3+7.5%Jun 26, 2025

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew.

Bid the next letting with this data

BidCrew tracks every DOT letting: line-item prices, competitor history, and a predicted low bid before you submit.

Request access