MDOT let 1 contract worth $996K at the low bid, with 5.00 bidders per contract (the 12-month average is 3.70). Hemphill Construction Company, Inc. won the most, $996K.
| Call | Contract | Low bidder | Low bid | Second | Gap | Bidders | vs. estimate |
|---|---|---|---|---|---|---|---|
| 1 | Bridge Repair on SR 33 (Bridge No. 34.6)Franklin · Bridge repair & rehab · 109810301 | Hemphill Construction Company, Inc.2nd: Midway Construction, Inc. | $996K | $1.2M | 16.1% | 5 | −12.0% |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew.
BidCrew tracks every DOT letting: line-item prices, competitor history, and a predicted low bid before you submit.