BidCrew Data
BidCrew Data / Mississippi / Lettings / Nov 26, 2024
MDOT letting · Regular

November 26, 2024 MDOT letting: 16 contracts, $77.9M

MDOT let 16 contracts worth $77.9M at the low bid, with 3.25 bidders per contract (the 12-month average is 3.70). APAC - Mississippi, Inc. won the most, $21.4M; 14 firms won at least one contract. The closest finish: Mill & Overlay approximately 15 miles of US 45A from the Noxubee County Line to , decided by 0.2% ($23K).

Awarded at low bid
$77.9M
16 contracts
Bidders per contract
3.25
single-bid 13%
Low bid vs. estimate
−7.6%
median
Low-to-second gap
$4.2M
median 5.4%
CallContractLow bidderLow bidSecondGapBiddersvs. estimate
14Mill & Overlay approximately 15 miles of US 45A from the Noxubee County Line to the Clay County LineLowndes · Overlay & resurfacing · 108913301Falcon Contracting Company, Inc.2nd: Cook & Son, LLC$13.1M$13.1M0.2%3+3.6%
1Mill & Overlay approximately 5 miles of I-22 from the Union County Line to the Belden Exit at SR 178Lee, Pontotoc · Overlay & resurfacing · 108141301APAC - Mississippi, Inc.2nd: WG Construction Company, Inc.$11.6M$11.7M1.6%3+8.1%
10Pearl River Installation of Median Cable Barrier & Bridge Pier Protection along I-59 from CR 334 to the CR 35 overpass &Clarke, Jasper · Bridge repair & rehab · 1091253010Simmons Erosion Control, Inc.$8.3M––1+9.1%
16Overlay approximately 19 miles of SR 553 from the Adams County Line to US 61 at FayetteJefferson · Overlay & resurfacing · 108940301APAC - Mississippi, Inc.$6.6M––1+6.6%
5Mill & Overlay approximately 13 miles of SR 16 from the Neshoba County Line to east of Watkins Road & 0.30 miles of SR 3Kemper · Overlay & resurfacing · 109445301Dickerson & Bowen, Inc.2nd: Falcon Contracting Company, Inc.$5.9M$6.0M1.8%5−25.1%
20Overlay approximately 8 miles of SR 605 from I-10 to SR 67Harrison · Overlay & resurfacing · 307900301Warren Paving, Inc.2nd: Huey P Stockstill, LLC$5.3M$6.6M23.9%2−20.7%
9Installation of Intelligent Transportation Systems on I-59 from 1.5 miles south of I-20, I-20 from 2 miles west of I-59 Lauderdale · Construction & widening · 108158302R & W Electric Co.2nd: Powell Construction Services, Inc.$3.7M$4.1M10.3%4−6.6%
6Mill & Overlay approximately 4 miles of SR 2 from US 45 to SR 350 & approximately 6 miles of SR 350 from SR 2 to the TisAlcorn · Overlay & resurfacing · 108912301WG Construction Company, Inc.2nd: Cook & Son, LLC$3.7M$3.8M4.1%3−8.9%
3Overlay approximately 8 miles of US 49E from the Yazoo County Line to 0.2 miles north of the SR 12W IntersectionHolmes · Overlay & resurfacing · 108979301A J Construction, Inc.2nd: APAC - Mississippi, Inc.$3.5M$3.5M0.7%2−8.7%
4Mill & Overlay approximately 5 miles of US 49 from the Forrest County Line to Richard Kendrick DriveCovington · Overlay & resurfacing · 109249301APAC - Mississippi, Inc.2nd: Warren Paving, Inc.$3.2M$3.2M1.4%3−31.4%
8Bridge Repairs on SR 27 over Copiah Creek (Bridge No. 65.8) & Martinsville Road, Gallatin Street, County Farm Road, BarkCopiah · Bridge repair & rehab · 109503301Key, LLC2nd: Century Construction Group, Inc.$3.2M$4.2M31.5%5+7.6%
21Roundabout Improvements on Old Brandon Road at Airport Road, International Drive, & SR 475Rankin · Intersections & safety · 109390301Joe McGee Construction Company, Inc.2nd: Hemphill Construction Company, Inc.$3.1M$3.2M3.2%4+4.1%
11Seal & Overlay approximately 8 miles of SR 4 from Galena Curve to SR 7Marshall · Overlay & resurfacing · 108254301Lehman-Roberts Company2nd: Double T Construction, LLC$3.0M$3.2M6.8%3−3.6%
2Intersection Improvements on US 49 at SR 35Covington · Intersections & safety · 108247301Walters Construction Co., Inc.2nd: T. L. Wallace Construction, Inc.$2.2M$2.5M14.0%3−14.4%
18Bridge Repairs on SR 310 over Greasy Creek (Bridge No. 45.6)Lafayette · Bridge repair & rehab · 109507301Bluff City Construction Co LLC2nd: Talbot Brothers Contracting Co., Inc.$1.0M$1.4M30.9%6−28.2%
13Bridge Repair on US 278 (Bridge No. 121.7A)Lee · Bridge repair & rehab · 109646301Talbot Brothers Contracting Co., Inc.2nd: Phillips Contracting Co., Inc.$568K$637K12.3%4−16.4%

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew.

Bid the next letting with this data

BidCrew tracks every DOT letting: line-item prices, competitor history, and a predicted low bid before you submit.

Request access