MDOT let 16 contracts worth $77.9M at the low bid, with 3.25 bidders per contract (the 12-month average is 3.70). APAC - Mississippi, Inc. won the most, $21.4M; 14 firms won at least one contract. The closest finish: Mill & Overlay approximately 15 miles of US 45A from the Noxubee County Line to , decided by 0.2% ($23K).
| Call | Contract | Low bidder | Low bid | Second | Gap | Bidders | vs. estimate |
|---|---|---|---|---|---|---|---|
| 14 | Mill & Overlay approximately 15 miles of US 45A from the Noxubee County Line to the Clay County LineLowndes · Overlay & resurfacing · 108913301 | Falcon Contracting Company, Inc.2nd: Cook & Son, LLC | $13.1M | $13.1M | 0.2% | 3 | +3.6% |
| 1 | Mill & Overlay approximately 5 miles of I-22 from the Union County Line to the Belden Exit at SR 178Lee, Pontotoc · Overlay & resurfacing · 108141301 | APAC - Mississippi, Inc.2nd: WG Construction Company, Inc. | $11.6M | $11.7M | 1.6% | 3 | +8.1% |
| 10 | Pearl River Installation of Median Cable Barrier & Bridge Pier Protection along I-59 from CR 334 to the CR 35 overpass &Clarke, Jasper · Bridge repair & rehab · 1091253010 | Simmons Erosion Control, Inc. | $8.3M | – | – | 1 | +9.1% |
| 16 | Overlay approximately 19 miles of SR 553 from the Adams County Line to US 61 at FayetteJefferson · Overlay & resurfacing · 108940301 | APAC - Mississippi, Inc. | $6.6M | – | – | 1 | +6.6% |
| 5 | Mill & Overlay approximately 13 miles of SR 16 from the Neshoba County Line to east of Watkins Road & 0.30 miles of SR 3Kemper · Overlay & resurfacing · 109445301 | Dickerson & Bowen, Inc.2nd: Falcon Contracting Company, Inc. | $5.9M | $6.0M | 1.8% | 5 | −25.1% |
| 20 | Overlay approximately 8 miles of SR 605 from I-10 to SR 67Harrison · Overlay & resurfacing · 307900301 | Warren Paving, Inc.2nd: Huey P Stockstill, LLC | $5.3M | $6.6M | 23.9% | 2 | −20.7% |
| 9 | Installation of Intelligent Transportation Systems on I-59 from 1.5 miles south of I-20, I-20 from 2 miles west of I-59 Lauderdale · Construction & widening · 108158302 | R & W Electric Co.2nd: Powell Construction Services, Inc. | $3.7M | $4.1M | 10.3% | 4 | −6.6% |
| 6 | Mill & Overlay approximately 4 miles of SR 2 from US 45 to SR 350 & approximately 6 miles of SR 350 from SR 2 to the TisAlcorn · Overlay & resurfacing · 108912301 | WG Construction Company, Inc.2nd: Cook & Son, LLC | $3.7M | $3.8M | 4.1% | 3 | −8.9% |
| 3 | Overlay approximately 8 miles of US 49E from the Yazoo County Line to 0.2 miles north of the SR 12W IntersectionHolmes · Overlay & resurfacing · 108979301 | A J Construction, Inc.2nd: APAC - Mississippi, Inc. | $3.5M | $3.5M | 0.7% | 2 | −8.7% |
| 4 | Mill & Overlay approximately 5 miles of US 49 from the Forrest County Line to Richard Kendrick DriveCovington · Overlay & resurfacing · 109249301 | APAC - Mississippi, Inc.2nd: Warren Paving, Inc. | $3.2M | $3.2M | 1.4% | 3 | −31.4% |
| 8 | Bridge Repairs on SR 27 over Copiah Creek (Bridge No. 65.8) & Martinsville Road, Gallatin Street, County Farm Road, BarkCopiah · Bridge repair & rehab · 109503301 | Key, LLC2nd: Century Construction Group, Inc. | $3.2M | $4.2M | 31.5% | 5 | +7.6% |
| 21 | Roundabout Improvements on Old Brandon Road at Airport Road, International Drive, & SR 475Rankin · Intersections & safety · 109390301 | Joe McGee Construction Company, Inc.2nd: Hemphill Construction Company, Inc. | $3.1M | $3.2M | 3.2% | 4 | +4.1% |
| 11 | Seal & Overlay approximately 8 miles of SR 4 from Galena Curve to SR 7Marshall · Overlay & resurfacing · 108254301 | Lehman-Roberts Company2nd: Double T Construction, LLC | $3.0M | $3.2M | 6.8% | 3 | −3.6% |
| 2 | Intersection Improvements on US 49 at SR 35Covington · Intersections & safety · 108247301 | Walters Construction Co., Inc.2nd: T. L. Wallace Construction, Inc. | $2.2M | $2.5M | 14.0% | 3 | −14.4% |
| 18 | Bridge Repairs on SR 310 over Greasy Creek (Bridge No. 45.6)Lafayette · Bridge repair & rehab · 109507301 | Bluff City Construction Co LLC2nd: Talbot Brothers Contracting Co., Inc. | $1.0M | $1.4M | 30.9% | 6 | −28.2% |
| 13 | Bridge Repair on US 278 (Bridge No. 121.7A)Lee · Bridge repair & rehab · 109646301 | Talbot Brothers Contracting Co., Inc.2nd: Phillips Contracting Co., Inc. | $568K | $637K | 12.3% | 4 | −16.4% |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew.
BidCrew tracks every DOT letting: line-item prices, competitor history, and a predicted low bid before you submit.