MDOT let 1 contract worth $1.7M at the low bid, with 4.00 bidders per contract (the 12-month average is 3.70). Century Construction Group, Inc. won the most, $1.7M.
| Call | Contract | Low bidder | Low bid | Second | Gap | Bidders | vs. estimate |
|---|---|---|---|---|---|---|---|
| 7 | Bridge Repair on SR 2 over the Tuscumbia River and reliefs (Bridge Nos. 45.6, 45.7 & 45.8Alcorn · Bridge repair & rehab · 109533301 | Century Construction Group, Inc.2nd: Talbot Brothers Contracting Co., Inc. | $1.7M | $2.4M | 37.3% | 4 | −3.6% |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew.
BidCrew tracks every DOT letting: line-item prices, competitor history, and a predicted low bid before you submit.