MDOT let 9 contracts worth $147M at the low bid, with 3.44 bidders per contract (the 12-month average is 3.70). Talbot Brothers Contracting Co., Inc. won the most, $140M; 8 firms won at least one contract. The closest finish: Thin Lift approximately 2.3 miles of SR 555 from the end of the 4-Lane section t, decided by 3.3% ($33K). MDOT later rejected the bids on 1 more contract from this letting and re-let it.
| Call | Contract | Low bidder | Low bid | Second | Gap | Bidders | vs. estimate |
|---|---|---|---|---|---|---|---|
| 1 | Grade, Drain, Bridge & Pave 4 Lanes on SR 7 from CR 370 to 0.4 miles south of SR 6, known as Federal Aid Project No. STPLafayette · Bridge repair & rehab · 102168301 | Talbot Brothers Contracting Co., Inc.2nd: Eutaw Construction Company, Inc. | $139M | $154M | 10.9% | 3 | −0.6% |
| 8 | Scrub Seal & Overlay approximately 6 miles of SR 27 from I-55 to the Hinds County LineCopiah · Overlay & resurfacing · 109788301 | APAC - Mississippi, Inc.2nd: Hayes General Construction, LLC | $2.4M | $2.7M | 15.7% | 4 | +2.3% |
| 5 | Bridge Replacement on SR 704 (Bridge No. 162.5)Benton · Bridge replacement · 106107301 | Ste-Bil Grading Inc.2nd: Cook & Son, LLC | $2.0M | $2.5M | 23.5% | 4 | −19.0% |
| 9 | Thin Lift approximately 2.3 miles of SR 555 from the end of the 4-Lane section to the end of State MaintenanceAdams · Buildings & other · 109045301 | Hayes General Construction, LLC2nd: APAC - Mississippi, Inc. | $992K | $1.0M | 3.3% | 2 | +9.7% |
| 6 | Bridge Repair on Peyton Road over I-55 (Bridge No.270.2)Tate · Bridge repair & rehab · 109700301 | Talbot Brothers Contracting Co., Inc.2nd: Century Construction Group, Inc. | $769K | $813K | 5.7% | 6 | +10.0% |
| 10 | Mill & Overlay approximately 1.1 miles of MS 370 from US 45 to MS 145Lee · Overlay & resurfacing · 109973301 | WG Construction Company, Inc.2nd: Cook & Son, LLC | $714K | $754K | 5.6% | 3 | −6.5% |
| 7 | Bridge Preventive Maintenance on I-55 at Dickerson Creek (Bridge Nos. 24.8A & 24.8B)Lincoln · Bridge repair & rehab · 108780307 | Gibson & Associates, Inc.2nd: Key, LLC | $434K | $667K | 53.7% | 3 | −7.7% |
| 11 | District 6 Placement of Raised Pavement Markers on various routes throughout the DistrictDistrict 6 · Construction & widening · 109461301 | J. L. McCool Contractors, Inc.2nd: C & H Construction Services, LLC | $427K | $570K | 33.7% | 2 | −2.4% |
| 4 | Bridge Repair on US 80 over Chunky River (Bridge No. 119.4)Newton · Bridge repair & rehab · 109676301 | Simmons Erosion Control, Inc.2nd: Joe McGee Construction Company, Inc. | $122K | $140K | 14.9% | 4 | −39.4% |
| Call | Contract | Low bidder | Low bid | Bidders | vs. estimate | Re-let |
|---|---|---|---|---|---|---|
| 12 | Striping & Pavement Markers on US 80 from Shaw Road to Terry RoadHinds · 109452301 | Hemphill Construction Company, Inc. | $2.7M | 1 | +119.6% | Feb 3, 2026 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew.
BidCrew tracks every DOT letting: line-item prices, competitor history, and a predicted low bid before you submit.