MDOT letting · Regular

June 23, 2026 MDOT letting: 8 contracts, $33.4M

MDOT let 8 contracts worth $33.4M at the low bid, with 3.50 bidders per contract (the 12-month average is 3.70). Warren Paving, Inc. won the most, $11.9M; 7 firms won at least one contract. The closest finish: Overlay approximately 8.5 miles of MS 587 from the Marion County Line to the Nor, decided by 0.2% ($7K).

Awarded at low bid
$33.4M
8 contracts
Bidders per contract
3.50
single-bid 13%
Low bid vs. estimate
−4.5%
median
Low-to-second gap
$1.3M
median 3.5%
CallContractLow bidderLow bidSecondGapBiddersvs. estimate
7Overlay and OGFC Lift from east of the Shorecrest Road Overpass to approximately 0.9 mile west of the D’Iberville BoulevHarrison · Overlay & resurfacing · 110062301Warren Paving, Inc.2nd: Huey P Stockstill, LLC$9.9M$10.4M5.0%2+1.5%
6Thin Lift Overlay approximately 8.5 miles of SR 514 from SR 513 to SR 145, approximately 0.5 miles of the SR 513 Spur (SClarke, Jasper · Overlay & resurfacing · 108954301Dunn Roadbuilders, LLC2nd: Walters Construction Co., Inc.$7.2M$7.5M3.5%3−11.7%
20Widen & Overlay approximately 2 miles of SR 26 from the east end of the Pearl River Bridge to the east bridge abutment oPearl River · Bridge repair & rehab · 309590301Huey P Stockstill, LLC$5.2M––1+8.4%
3Roundabout on US 51 at Green T RoadDeSoto · Intersections & safety · 109064301Talbot Brothers Contracting Co., Inc.2nd: Phillips Contracting Co., Inc.$4.3M$4.9M12.7%6−8.7%
9Overlay approximately 8.5 miles of MS 587 from the Marion County Line to the Northern Ervin-Reid Circle DriveLawrence · Overlay & resurfacing · 109967301Dickerson & Bowen, Inc.2nd: Walters Construction Co., Inc.$4.1M$4.1M0.2%4−7.1%
8Mill & Overlay approximately 3.87 miles of SR 149 from US 49S to US 49NStone · Overlay & resurfacing · 309591301Warren Paving, Inc.2nd: Huey P Stockstill, LLC$2.0M$2.0M0.8%2−1.9%
2District 1 Placement of Raised Pavement Markers on various routes throughout the DistrictDistrict 1 · Construction & widening · 309572301Arkansas Sign & Barricade, Inc.2nd: Riverside Traffic Systems, Inc.$592K$602K1.7%3−30.0%
5Bridge Repair on SR 22 over Persimmon Creek (Bridge No. 32.5)Madison · Bridge repair & rehab · 109680301Hemphill Construction Company, Inc.2nd: Hope Enterprises, LLC$83K$97K17.8%7+7.4%

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew.