BidCrew Data
BidCrew Data / Mississippi / Lettings / Jun 12, 2026
MDOT letting · Emergency

June 12, 2026 MDOT letting: 1 contract, $1.8M

MDOT let 1 contract worth $1.8M at the low bid, with 4.00 bidders per contract (the 12-month average is 3.70). GeoStabilization International, LLC won the most, $1.8M.

Awarded at low bid
$1.8M
1 contracts
Bidders per contract
4.00
single-bid 0%
Low bid vs. estimate
+6.9%
median
Low-to-second gap
$228K
median 12.6%
CallContractLow bidderLow bidSecondGapBiddersvs. estimate
1Emergency Slide Repair on SR 178 approximately 0.66 miles south of CR 121Union · Construction & widening · 110153301GeoStabilization International, LLC2nd: Phillips Contracting Co., Inc.$1.8M$2.0M12.6%4+6.9%

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew.

Bid the next letting with this data

BidCrew tracks every DOT letting: line-item prices, competitor history, and a predicted low bid before you submit.

Request access