The low bidder priced two-way yellow reflective high performance raised marker at a median $12.70 per each over the last 12 months (10 contracts), down 15% from the year before and up 21% since 2020.
| Let | Contract | Quantity | Winning price | All bidders' median | Bidders |
|---|---|---|---|---|---|
| Oct 27, 2026 | Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren | 1.4K EA | $12.95 | $15.00 | 3 |
| Oct 27, 2026 | Slide Improvement on US 84 from west of Fire Tower Road to east of Providence RoadFranklin | 843 EA | $20.00 | $7.72 | 4 |
| Oct 27, 2026 | Bridge Replacement on SR 28 between the Copiah County Line & Pinola (Bridge Nos. 72.7 & 73Simpson | 6 EA | $23.60 | – | 1 |
| Sep 29, 2026 | Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin | 5.2K EA | $4.80 | $5.41 | 6 |
| Sep 22, 2026 | Restricted crossing U-Turn (RCUT) on US 82 at Sturgis-Maben Road & Mill & Overlay approximOktibbeha | 28 EA | $9.00 | – | 4 |
| Aug 21, 2026 | Emergency Slope Repair & Pipe Cleanout on SR 26George, Perry | 294 EA | $13.00 | $13.00 | 3 |
| May 27, 2026 | Bridge Replacement on SR 15 over Cypress Branch on Bridge No. 15.7Harrison | 65 EA | $11.50 | $11.50 | 5 |
| Apr 28, 2026 | Restricted Crossing U-Turn (RCUT) on US 278 at CR 217/405Lafayette | 6 EA | $6.00 | $20.00 | 5 |
| Nov 25, 2025 | Safety Improvements on US 84 at MS 184 & at MS 588 in CollinsCovington | 704 EA | $12.45 | $12.03 | 4 |
| Oct 28, 2025 | Bridge Repair on SR 145 over the Noxubee River Relief (Bridge No. 131.1)Noxubee | 8 EA | $110 | $110 | 6 |
| Sep 23, 2025 | Grade, Drain, Bridge & Pave 4 Lanes on SR 7 from CR 370 to 0.4 miles south of SR 6, known Lafayette | 1.1K EA | $15.00 | $15.00 | 3 |
| Jun 26, 2025 | Bridge Replacements on US 80 between Chunky & Meehan (Bridge Nos. 123.1, 123.3, 123.5 & 12Lauderdale, Madison, Newton | 217 EA | $18.00 | $20.00 | 3 |
| Mar 4, 2025 | Grade Bridge, Pave 2-Lane on SR 19 from 0.25 miles South of SR 492 to Tucker DriveNeshoba | 548 EA | $12.00 | $12.85 | 2 |
| Oct 22, 2024 | Bridge Repair on I-20 over the Big Black River & Reliefs (Bridge Nos. 17.3A, 17.3B, 17.7A,Hinds, Warren | 851 EA | $5.40 | $22.95 | 2 |
| Sep 4, 2024 | Construction project, Madison CountyMadison | 81 EA | $12.00 | $12.00 | 3 |
| Jul 30, 2024 | Bridge Replacement on SRSunflower | 25 EA | $20.00 | $17.00 | 4 |
| Jul 30, 2024 | Pavement Restoration on approximately 11 miles of US 49 from 0.8 miles north of Old HighwaYazoo | 859 EA | $10.00 | $3.00 | 3 |
| Apr 23, 2024 | Grade, Drain, Pave on SR 2 from existing SR 15 to SRTippah | 401 EA | $12.00 | $12.50 | 2 |
| Apr 2, 2024 | Construction project, Madison CountyMadison | 335 EA | $10.00 | $10.50 | 7 |
| Mar 26, 2024 | Pavement Restoration of approximately 5 miles of I-55 from SR 24 to US 98 & Roundabout ConPike | 5.6K EA | $18.75 | $16.88 | 2 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.
BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.