MDOT let 11 contracts worth $31.9M at the low bid, with 3.18 bidders per contract (the 12-month average is 3.70). APAC - Mississippi, Inc. won the most, $8.6M; 7 firms won at least one contract. The closest finish: Bridge Repair on Craft Road & Miller Road over US 78 (Bridge Nos. 1.4 & 8.5) & o, decided by 1.2% ($75K). MDOT later rejected the bids on 3 more contracts from this letting and re-let them.
| Call | Contract | Low bidder | Low bid | Second | Gap | Bidders | vs. estimate |
|---|---|---|---|---|---|---|---|
| 4 | Mill & Overlay approximately 6 miles on I-20 from Clinton to MS 18Hinds · Overlay & resurfacing · 109971301 | APAC - Mississippi, Inc.2nd: Dickerson & Bowen, Inc. | $8.6M | $9.4M | 8.7% | 3 | +0.8% |
| 13 | Bridge Repair on Craft Road & Miller Road over US 78 (Bridge Nos. 1.4 & 8.5) & on SR 309 over I-22 (Bridge Nos. 16.0A & DeSoto, Marshall · Construction & widening · 109695301 | Gibson & Associates, Inc.2nd: Key, LLC | $6.0M | $6.1M | 1.2% | 5 | −1.2% |
| 5 | Mill, Level & Overlay approximately 4 miles of US 49 from US 11 to beginning of divided section at I-59Forrest · Overlay & resurfacing · 109463301 | Warren Paving, Inc.2nd: Dunn Roadbuilders, LLC | $5.4M | $6.3M | 17.1% | 2 | −5.5% |
| 2 | Bridge Repair on US 98 Magees Creek and Relief Bridges Nos. 99.0, 99.0B, 99.1 & 99.1BWalthall · Bridge repair & rehab · 109667301 | Key, LLC2nd: Hope Enterprises, LLC | $3.1M | $3.8M | 22.3% | 2 | +7.5% |
| 15 | Overlay approximately 6 miles on SR 28 from Mize to Taylorsville, known as Project No. SP-0013-03(030) / 109002301 in SmSmith · Overlay & resurfacing · 109002301 | Southern Paving, LLC2nd: APAC - Mississippi, Inc. | $3.1M | $3.2M | 5.4% | 4 | −20.8% |
| 14 | Bridge Repair on Old West Point Road over US 82 (Bridge No. 160.3)Lowndes · Bridge repair & rehab · 109730301 | Key, LLC2nd: Century Construction Group, Inc. | $1.8M | $2.0M | 11.0% | 4 | +7.0% |
| 7 | Bridge Repair on SR 145 over the Noxubee River Relief (Bridge No. 131.1)Noxubee · Bridge repair & rehab · 109679301 | Hemphill Construction Company, Inc.2nd: Century Construction Group, Inc. | $1.3M | $1.3M | 4.2% | 6 | −7.9% |
| 1 | Bridge Repair on US 61 over St. Catherine Creek (Bridge Nos. 49.5A & 49.5B)Adams · Bridge repair & rehab · 109668301 | Hemphill Construction Company, Inc.2nd: Key, LLC | $1.1M | $1.2M | 12.9% | 3 | −1.3% |
| 3 | Bridge Repair on US 278 over the Buttahatchie River (Bridge No. 21.6Monroe · Bridge repair & rehab · 109673301 | Key, LLC2nd: Phillips Contracting Co., Inc. | $757K | $849K | 12.1% | 4 | −6.5% |
| 9 | Placement of Audible Stripe on MS 433 from Yazoo County Line to Ebenezer-Coxburg Road in Benton and from Old Highway 16 Holmes, Yazoo · Intersections & safety · 110035301 | J. C. Cheek Contractors, Inc. | $426K | – | – | 1 | −47.5% |
| 8 | Audible Thermoplastic Pavement Markings, Thermoplastic Pavement Markings & Raised Pavement Markers beginning approximateChoctaw, Lowndes · Construction & widening · 110033301 | J. C. Cheek Contractors, Inc. | $418K | – | – | 1 | −45.2% |
| Call | Contract | Low bidder | Low bid | Bidders | vs. estimate | Re-let |
|---|---|---|---|---|---|---|
| 6 | Bridge Replacement on SR 465 (Bridge No.15.7) 10/28/2025 3:43 PM Unofficial Document Page 3 ofWarren · 106110301 | Century Construction Group, Inc. | $2.0M | 3 | +18.8% | Feb 3, 2026 |
| 10 | Placement of Audible Stripe on MS 4 from MS 3 to Matthew Drive in Senatobia, known as Federal Project No. HRRR-1924-00(0Tate · 110031301 | Riverside Traffic Systems, Inc. IRREGULAR | $313K | 1 | −39.4% | Feb 24, 2026 |
| 11 | Install Center Audible Stripe, Replace Curve & Intersection Warning Signs, Refresh Striping & install Raised Pavement MaItawamba · 110032301 | Riverside Traffic Systems, Inc. | $504K | 1 | −36.8% | Feb 24, 2026 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew.