MDOT let 2 contracts worth $37.1M at the low bid, with 3.50 bidders per contract (the 12-month average is 3.70). APAC - Mississippi, Inc. won the most, $29.2M; 2 firms won at least one contract. The closest finish: Bridge Replacement on SR, decided by 12.7% ($1.0M).
| Call | Contract | Low bidder | Low bid | Second | Gap | Bidders | vs. estimate |
|---|---|---|---|---|---|---|---|
| 1 | Pavement Restoration on approximately 11 miles of US 49 from 0.8 miles north of Old Highway 49 to SR 16 & USYazoo · Construction & widening · 108150301 | APAC - Mississippi, Inc.2nd: A J Construction, Inc. | $29.2M | $35.8M | 22.9% | 3 | −25.2% |
| 3 | Bridge Replacement on SRSunflower · Bridge replacement · 106912301 | Century Construction Group, Inc.2nd: Joe McGee Construction Company, Inc. | $7.9M | $8.9M | 12.7% | 4 | +7.4% |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew.
BidCrew tracks every DOT letting: line-item prices, competitor history, and a predicted low bid before you submit.