MDOT let 17 contracts worth $64.0M at the low bid, with 2.47 bidders per contract (the 12-month average is 3.70). Key, LLC won the most, $17.1M; 13 firms won at least one contract. The closest finish: Renovation of Welcome Centers, decided by 0.3% ($1K).
| Call | Contract | Low bidder | Low bid | Second | Gap | Bidders | vs. estimate |
|---|---|---|---|---|---|---|---|
| 3 | Bridge Repair on I-20 over the Big Black River & Reliefs (Bridge Nos. 17.3A, 17.3B, 17.7A, 17.7B, 17.9A & 17.9B)Hinds, Warren · Bridge repair & rehab · 109172301 | Key, LLC2nd: Freyssinet, Inc. | $17.1M | $17.3M | 0.7% | 2 | −14.5% |
| 9 | Remove and Replace OGFC on approximately 20 miles of I-59 from North of Rocky Creek to the Jasper County LineJones · Overlay & resurfacing · 109251301 | Dunn Roadbuilders, LLC | $10.3M | – | – | 1 | +8.6% |
| 6 | Remove & Replace OGFC on approximately 9 miles of I-55 from US 98W to the bridge south of the Bouge Chitto InterchangeLincoln, Pike · Bridge repair & rehab · 109475301 | Dickerson & Bowen, Inc. | $7.4M | – | – | 1 | +9.6% |
| 12 | Intersection Improvements on various routes throughout the DistrictDistrict 7 · Intersections & safety · 109314301 | Traffic Control Products Company, Inc. | $5.2M | – | – | 1 | −24.9% |
| 11 | Bridge Replacements on SR 346 over Mud Creek & Ditch (Bridge Nos. 3.6 & 3.8)Pontotoc · Bridge replacement · 107862301 | Ste-Bil Grading Inc.2nd: Talbot Brothers Contracting Co., Inc. | $4.8M | $5.1M | 5.4% | 4 | −22.2% |
| 4 | Construction of a Roundabout on SR 3 at Willie Morris ParkwayYazoo · Intersections & safety · 109195301 | Simmons Erosion Control, Inc. | $4.0M | – | – | 1 | +6.2% |
| 8 | Safety Improvements on SR 25 at Longview RoadOktibbeha · Intersections & safety · 109359301 | Phillips Contracting Co., Inc.2nd: Ausbern Construction Company, Inc. | $3.8M | $4.9M | 27.6% | 2 | +1.5% |
| 7 | Intersection Improvements on SR 25 at Mt. Helm Road and at Pisgah RoadRankin · Intersections & safety · 109316301 | Hemphill Construction Company, Inc.2nd: Joe McGee Construction Company, Inc. | $2.7M | $3.5M | 25.9% | 2 | −11.0% |
| 2 | Bridge Replacement on SR 12 over Moccasin Creek (Bridge No. 69.2)Holmes · Bridge replacement · 107012301 | Ste-Bil Grading Inc.2nd: Joe McGee Construction Company, Inc. | $2.7M | $2.9M | 8.4% | 4 | −1.0% |
| 10 | Safety Improvements along US 49 from WSF Tatum Blvd. to Sims RoadForrest · Intersections & safety · 109129301 | T. L. Wallace Construction, Inc.2nd: Warren Paving, Inc. | $2.1M | $2.6M | 20.8% | 2 | −9.6% |
| 13 | Microsurface approximately 14 miles of SR 33 from the Homochitto River to US 84Franklin · Overlay & resurfacing · 108994301 | Vance Brothers, LLC2nd: T. L. Wallace Construction, Inc. | $1.8M | $2.1M | 12.3% | 3 | −13.0% |
| 15 | Renovation of Delma Furniss Hospitality Station & Desoto Welcome CenterCoahoma, DeSoto · Buildings & other · 503757303 | EOZ Build and Design, LLC2nd: Flagstar Construction Company, Inc. | $493K | $569K | 15.3% | 4 | −24.1% |
| 5 | Placement of Audible Stripe and Signing Improvements along SR 25 from 0.3 miles north of SR 8 to the SR 25 Bypass, knownMonroe · Intersections & safety · 109542301 | Riverside Traffic Systems, Inc. | $344K | – | – | 1 | +8.7% |
| 17 | Renovation of Welcome CentersHancock, Pearl River · Buildings & other · 503755301 | EOZ Build and Design, LLC2nd: H & A Painting, LLC | $344K | $365K | 6.2% | 3 | −35.7% |
| 14 | Renovation of Welcome CentersAlcorn, Itawamba · Construction & widening · 503757301 | Flagstar Construction Company, Inc.2nd: EOZ Build and Design, LLC | $337K | $338K | 0.3% | 3 | −22.5% |
| 18 | Renovation of Welcome Center & Woodville Hospitality StationPike, Wilkinson · Buildings & other · 503755303 | Flagstar Construction Company, Inc.2nd: H & A Painting, LLC | $219K | $260K | 18.7% | 4 | −42.4% |
| 16 | Building Improvements at the Clinton Maintenance Area Headquarters Office Building, HVAC Upgrades, known as State ProjecHinds · Buildings & other · 502891301 | Flagstar Construction Company, Inc.2nd: TruMac, LLC | $136K | $325K | 139.3% | 4 | – |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew.