BidCrew Data
BidCrew Data / Mississippi / Lettings / Oct 10, 2024
MDOT letting · Emergency

October 10, 2024 MDOT letting: 3 contracts, $2.1M

MDOT let 3 contracts worth $2.1M at the low bid, with 2.33 bidders per contract (the 12-month average is 3.70). Joe McGee Construction Company, Inc. won the most, $1.1M; 3 firms won at least one contract. The closest finish: Bridge Repair on SR 25 over Cripple Deer Creek (Bridge No. 198.8), decided by 7.9% ($31K). MDOT later rejected the bids on 1 more contract from this letting and re-let it.

Awarded at low bid
$2.1M
3 contracts
Bidders per contract
2.33
single-bid 0%
Low bid vs. estimate
−21.6%
median
Low-to-second gap
$985K
median 29.9%
CallContractLow bidderLow bidSecondGapBiddersvs. estimate
3Emergency Slide Repair on US 80 in ForestScott · Construction & widening · 109631301Joe McGee Construction Company, Inc.2nd: Dozer, LLC$1.1M$1.8M71.5%2−9.4%
2Emergency Milling, Leveling, Overlaying & applying High Friction Surface Treatment approximately 0.4 miles on the ramp fLauderdale · Overlay & resurfacing · 109702301Walters Construction Co., Inc.2nd: APAC - Mississippi, Inc.$635K$825K29.9%2−27.6%
1Bridge Repair on SR 25 over Cripple Deer Creek (Bridge No. 198.8)Tishomingo · Bridge repair & rehab · 109642301Century Construction Group, Inc.2nd: Gibson & Associates, Inc.$391K$422K7.9%3−21.6%

Bids rejected and re-let

CallContractLow bidderLow bidBiddersvs. estimateRe-let
4Emergency Bridge Repair on 49th Avenue over I-59/I-20 (Bridge No. 150.8A)Lauderdale · 109604301Key, LLC$946K1+82.8%Dec 5, 2024

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew.

Bid the next letting with this data

BidCrew tracks every DOT letting: line-item prices, competitor history, and a predicted low bid before you submit.

Request access