MDOT let 2 contracts worth $6.2M at the low bid, with 2.50 bidders per contract (the 12-month average is 3.70). Gibson & Associates, Inc. won the most, $3.5M; 2 firms won at least one contract. The closest finish: Bridge Repair on US 82 over Bogue Phalia (Bridge Nos. 22.1 A & B), decided by 1.8% ($63K).
| Call | Contract | Low bidder | Low bid | Second | Gap | Bidders | vs. estimate |
|---|---|---|---|---|---|---|---|
| 3 | Bridge Repair on US 82 over Bogue Phalia (Bridge Nos. 22.1 A & B)Washington · Bridge repair & rehab · 109504301 | Gibson & Associates, Inc.2nd: Key, LLC | $3.5M | $3.5M | 1.8% | 3 | +9.3% |
| 4 | Construction project, Rankin CountyRankin · Construction & widening · 108902306 | R & W Electric Co.2nd: Lewis Electric, Inc. | $2.8M | $3.0M | 7.5% | 2 | +10.6% |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew.
BidCrew tracks every DOT letting: line-item prices, competitor history, and a predicted low bid before you submit.