The low bidder priced concrete bridge end barrier, 37.5" at a median $119 per linear foot over the last 12 months (8 contracts), up 43% from the year before and up 126% since 2020.
| Let | Contract | Quantity | Winning price | All bidders' median | Bidders |
|---|---|---|---|---|---|
| Oct 27, 2026 | Bridge Replacement on SR 28 between the Copiah County Line & Pinola (Bridge Nos. 72.7 & 73Simpson | 120 LF | $101 | – | 1 |
| Sep 1, 2026 | Bridge Replacement on US 51 over unnamed Streams (Bridge Nos. 11.7 & 12.1) & between MagnoPike | 40 LF | $134 | $145 | 3 |
| Sep 1, 2026 | Bridge Replacements on SR 32 between Webb & Charleston (Bridge Nos. 45.6, 46.2 & 47.0)Tallahatchie | 120 LF | $93.00 | $92.00 | 6 |
| Aug 25, 2026 | Bridge Replacement on SR 486 (Bridge No. 1.0)Neshoba | 40 LF | $150 | $160 | 4 |
| Aug 25, 2026 | Bridge Repair on SR 434 on Bridge No. 0.7 and Bridge Rehabilitation on SR 434 on Bridge NoSharkey | 40 LF | $225 | $210 | 3 |
| Aug 25, 2026 | SR 145 Bridge Replacement (Bridge No. 210.8), Known as Federal Aid Project No. STBG-0053-0Lee | 40 LF | $143 | $160 | 8 |
| May 27, 2026 | Bridge Replacement on SR 427 (Bridge No. 4.4) between SR 488 & SR 16Leake | 40 LF | $91.85 | $90.92 | 8 |
| Nov 25, 2025 | Bridge Replacement on SR 481 between SR 902 & SR 35 (Bridge Nos. 2.1 & 2.3)Smith | 40 LF | $103 | $103 | 7 |
| Sep 23, 2025 | Bridge Replacement on SR 704 (Bridge No. 162.5)Benton | 40 LF | $130 | $143 | 4 |
| Sep 23, 2025 | Grade, Drain, Bridge & Pave 4 Lanes on SR 7 from CR 370 to 0.4 miles south of SR 6, known Lafayette | 538 LF | $85.00 | $90.00 | 3 |
| Jun 26, 2025 | Bridge Replacements on US 80 between Chunky & Meehan (Bridge Nos. 123.1, 123.3, 123.5 & 12Lauderdale, Madison, Newton | 480 LF | $81.00 | $85.00 | 3 |
| Jan 28, 2025 | Bridge Replacement on SR 14 over Hashuqua Creek (Bridge No. 156.5)Noxubee | 40 LF | $73.50 | $85.00 | 5 |
| Oct 22, 2024 | Bridge Replacements on SR 346 over Mud Creek & Ditch (Bridge Nos. 3.6 & 3.8)Pontotoc | 40 LF | $80.00 | $83.00 | 4 |
| Oct 22, 2024 | Bridge Replacement on SR 12 over Moccasin Creek (Bridge No. 69.2)Holmes | 40 LF | $100 | $104 | 4 |
| Jul 30, 2024 | Bridge Replacement on SRSunflower | 40 LF | $95.00 | $91.50 | 4 |
| Apr 23, 2024 | Grade, Drain, Pave on SR 2 from existing SR 15 to SRTippah | 280 LF | $95.00 | $97.50 | 2 |
| Apr 2, 2024 | Construction project, Madison CountyMadison | 160 LF | $83.00 | $85.00 | 7 |
| Jan 31, 2024 | Bridge Replacement on USJackson | 40 LF | $84.50 | $80.00 | 5 |
| Jan 31, 2024 | Construction project, Choctaw CountyChoctaw | 80 LF | $82.50 | $91.25 | 5 |
| Jan 31, 2024 | Bridge Replacements on SR 395 between SRWinston | 80 LF | $95.00 | $104 | 2 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.
BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.