BidCrew Data
BidCrew Data / Mississippi / Prices / Thermoplastic Detail Stripe, White
MDOT pay item · 907-626-G004

Thermoplastic Detail Stripe, White: Mississippi winning bid prices

The low bidder priced thermoplastic detail stripe, white at a median $4.00 per linear foot over the last 12 months (87 contracts), down 4% from the year before and flat since 2024.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$4.00
87 contracts
Median, prior 12 months
$4.15
32 contracts
Median, 2024
$4.00
20 contracts
Winner vs. field
level with
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$3$3.5$4$4.5$5$5.52020202120222023202420252026*$4.00
Price vs. quantityEvery winning price since 2020 (log scale)
$2$3$4$5$6$71.0K10K
Does quantity matter?Median winning price by quantity band
$0$1$2$3$4$5$4.50≤2.7K$4.172.7K–6.9K$4.006.9K–15K$3.10>15K

The last 20 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Oct 27, 2026Installation of Audible Stripe, Raised Pavement Markers and Sign Improvements on MS 336 frPontotoc1.0K LF$4.00–1
Oct 27, 2026Installation of Audible Stripe, Raised Pavement Markers and Sign Improvements on MS 363 frItawamba, Lee3.7K LF$4.00$4.002
Oct 27, 2026Overlay approximately 7 miles of MS 48 from SR 24 to Magnolia Progress RoadPike8.3K LF$3.49$3.493
Oct 27, 2026OGFC Lift on I-59 from US 45 to approximately 0.248 miles north of the Russell InterchangeLauderdale13K LF$3.00–1
Oct 27, 2026Fog Seal approximately 6.2 miles of I-59 from 0.8 mile north of CR 39 to the Jasper/ClarkeJasper, Clarke4.8K LF$3.00$3.402
Oct 27, 2026Fog Seal approximately 5 miles of I-59 from the Forrest County Line to the Forrest County Lamar, Forrest15K LF$4.50–1
Oct 27, 2026Mill & Overlay approximately 13.7 miles of I-59 from 0.5 miles north of the McNeil Exit toPearl River9.8K LF$5.00–1
Oct 27, 2026Mill & Overlay approximately 7.4 miles of I-55 from the Carroll County Line to 0.5 miles sGrenada, Carroll, Montgomery7.2K LF$3.15–1
Oct 27, 2026Construction project, Madison CountyMadison38K LF$7.15$4.703
Oct 27, 2026Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren58K LF$3.25$3.253
Oct 27, 2026Slide Improvement on US 84 from west of Fire Tower Road to east of Providence RoadFranklin1.3K LF$4.00$3.154
Oct 27, 2026Bridge Replacement on SR 28 between the Copiah County Line & Pinola (Bridge Nos. 72.7 & 73Simpson438 LF$7.08–1
Oct 27, 2026Mill & Overlay approximately 17 miles of I-22 beginning 1 mile west of the Landfill Road EMarshall44K LF$4.25$4.004
Sep 29, 2026Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin99K LF$4.00$4.546
Sep 22, 2026Installation of Audible Thermoplastic Traffic Markings & Thermoplastic Pavement Markings oDeSoto, Panola, Tate49K LF$1.75$2.882
Sep 22, 2026Safety Improvements & Pavement Markings approximately 30.3 miles of MS 309 from Byhalia toMarshall16K LF$2.00$3.002
Sep 22, 2026Mill & Overlay approximately 2.5 miles of US 49 from SR 1 to the Isle of Capri ParkwayCoahoma6.7K LF$4.10–1
Sep 22, 2026Remove OGFC & Replace with Micro-Surface on I-55 for approximately 14.1 miles from approxiDeSoto, Tate10K LF$4.20$4.303
Sep 22, 2026Restricted crossing U-Turn (RCUT) on US 82 at Sturgis-Maben Road & Mill & Overlay approximOktibbeha33K LF$3.00–4
Sep 1, 2026Bridge Replacement on US 51 over unnamed Streams (Bridge Nos. 11.7 & 12.1) & between MagnoPike848 LF$6.60$6.603

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.

Price this item against every competitor

BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.

Request access