The low bidder priced cement at a median $301 per ton over the last 12 months (1 contracts), up 17% from the year before and up 36% since 2020.
| Let | Contract | Quantity | Winning price | All bidders' median | Bidders |
|---|---|---|---|---|---|
| Oct 27, 2026 | Construction project, Madison CountyMadison | 1.1K TON | $301 | $301 | 3 |
| Sep 23, 2025 | Grade, Drain, Bridge & Pave 4 Lanes on SR 7 from CR 370 to 0.4 miles south of SR 6, known Lafayette | 4.4K TON | $330 | $320 | 3 |
| Mar 4, 2025 | Grade Bridge, Pave 2-Lane on SR 19 from 0.25 miles South of SR 492 to Tucker DriveNeshoba | 5.7K TON | $250 | $278 | 2 |
| Nov 7, 2024 | Bridge Replacement on SR 12 over the Sunflower River (Bridge No. 23.9)Humphreys, Washington | 84 TON | $258 | $254 | 4 |
| Jul 11, 2024 | Construction project, Madison CountyMadison | 3.5K TON | $300 | $303 | 3 |
| Apr 23, 2024 | Grade, Drain, Pave on SR 2 from existing SR 15 to SRTippah | 1.3K TON | $450 | $383 | 2 |
| Jan 24, 2024 | Construction project, Jackson CountyJackson | 5.5K TON | $350 | $325 | 2 |
| Nov 2, 2023 | Bridge Replacements & Bank Stabilization on US 98 at the Pearl River (Bridge Nos. 118.5A &Marion | 70 TON | $312 | $356 | 2 |
| Aug 22, 2023 | Bridge Replacements on USFranklin | 124 TON | $276 | $275 | 2 |
| Aug 22, 2023 | Bridge Replacements on USFranklin | 49 TON | $248 | $247 | 2 |
| Aug 1, 2023 | Construction project, Pontotoc CountyPontotoc | 2.5K TON | $314 | $315 | 2 |
| Nov 23, 2021 | Grade, Drain, Bridge & Pave 4-Lane for approximately 9 miles of the USWashington | 6.3K TON | $350 | $300 | 2 |
| Aug 24, 2021 | Construction project, Jackson CountyJackson | 589 TON | $225 | – | 2 |
| Oct 27, 2020 | Construction project, Neshoba CountyNeshoba | 2.9K TON | $245 | $245 | 3 |
| Mar 24, 2020 | Construction project, Jackson CountyJackson | 309 TON | $225 | – | 3 |
| Feb 25, 2020 | Construction project, DeSoto CountyDeSoto | 889 TON | $184 | $195 | 3 |
| Feb 25, 2020 | Grade, Drain, Bridge, & Pave 4-Lane approximately 9 miles of APD Corridor "V" between FairItawamba | 6.7K TON | $218 | $215 | 3 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.
BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.