MDOT let 6 contracts worth $45.6M at the low bid, with 4.00 bidders per contract (the 12-month average is 3.70). W. G. Yates & Sons Construction Company won the most, $35.6M; 6 firms won at least one contract. The closest finish: Overlay approximately 11 miles of SR 589 from the Lamar County Line to US, decided by 1.5% ($25K).
| Call | Contract | Low bidder | Low bid | Second | Gap | Bidders | vs. estimate |
|---|---|---|---|---|---|---|---|
| 1 | Construction project, Neshoba CountyNeshoba · Construction & widening · 101649302 | W. G. Yates & Sons Construction Company2nd: T. L. Wallace Construction, Inc. | $35.6M | $37.6M | 5.8% | 3 | −8.8% |
| 4 | Overlay approximately 4.5 miles of US 49W from USYazoo · Overlay & resurfacing · 107767301 | APAC - Mississippi, Inc. | $3.2M | – | – | 1 | +0.5% |
| 2 | Intersection Improvements on SRLafayette · Intersections & safety · 102168306 | Talbot Bros Contr Co, Inc & Talbot Bros Grading Co, Inc, AJV2nd: M & N Excavators, Inc. | $2.7M | $3.0M | 14.1% | 7 | −23.3% |
| 5 | Overlay approximately 5.6 miles of SRNeshoba · Overlay & resurfacing · 108577301 | Dickerson & Bowen, Inc.2nd: APAC - Mississippi, Inc. | $2.1M | $2.2M | 4.0% | 3 | +4.4% |
| 6 | Overlay approximately 11 miles of SR 589 from the Lamar County Line to USCovington · Overlay & resurfacing · 108572301 | Dunn Roadbuilders, LLC2nd: W. E. Blain & Sons, Inc. | $1.7M | $1.7M | 1.5% | 3 | −20.0% |
| 3 | Slide Repair on SR 17 approximately 12 miles South of USCarroll · Construction & widening · 108518301 | Wilco, Inc.2nd: Hemphill Construction Company, Inc. | $388K | $397K | 2.2% | 7 | −19.3% |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew.
BidCrew tracks every DOT letting: line-item prices, competitor history, and a predicted low bid before you submit.