Guard Rail, Bridge End Section, Type I: Mississippi winning bid prices

The low bidder priced guard rail, bridge end section, type i at a median $3,970 per each over the last 12 months (25 contracts), up 4% from the year before and up 56% since 2020.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$3,970
25 contracts
Median, prior 12 months
$3,800
17 contracts
Median, 2020
$2,553
12 contracts
Winner vs. field
level with
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$2,500$3,000$3,500$4,000$4,5002020202120222023202420252026*$3,970
Price vs. quantityEvery winning price since 2020 (log scale)
$2,000$3,000$4,000$5,000$6,000110
Does quantity matter?Median winning price by quantity band
$0$1,000$2,000$3,000$4,000$3,970≤4$0.0004–4$3,9004–12$3,700>12

The last 20 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Oct 27, 2026Fog Seal approximately 6.2 miles of I-59 from 0.8 mile north of CR 39 to the Jasper/ClarkeJasper, Clarke2 EA$3,956$4,3622
Oct 27, 2026Fog Seal approximately 5 miles of I-59 from the Forrest County Line to the Forrest County Lamar, Forrest3 EA$4,450–1
Oct 27, 2026Mill & Overlay approximately 7.4 miles of I-55 from the Carroll County Line to 0.5 miles sGrenada, Carroll, Montgomery4 EA$3,970–1
Oct 27, 2026Construction project, Madison CountyMadison4 EA$4,101$4,1013
Oct 27, 2026Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren31 EA$3,775$3,7753
Oct 27, 2026Bridge Replacement on SR 28 between the Copiah County Line & Pinola (Bridge Nos. 72.7 & 73Simpson12 EA$4,307–1
Sep 29, 2026Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin2 EA$4,236$4,2186
Sep 22, 2026Remove OGFC & Replace with Micro-Surface on I-55 for approximately 14.1 miles from approxiDeSoto, Tate6 EA$4,200$4,2953
Sep 1, 2026Bridge Replacement on US 51 over unnamed Streams (Bridge Nos. 11.7 & 12.1) & between MagnoPike4 EA$4,218$4,5003
Sep 1, 2026Bridge Replacements on SR 32 between Webb & Charleston (Bridge Nos. 45.6, 46.2 & 47.0)Tallahatchie12 EA$4,084$4,1986
Aug 25, 2026Bridge Replacement on SR 486 (Bridge No. 1.0)Neshoba4 EA$4,500$4,3004
Aug 25, 2026Bridge Repair on SR 434 on Bridge No. 0.7 and Bridge Rehabilitation on SR 434 on Bridge NoSharkey4 EA$3,870$3,8703
Aug 25, 2026SR 145 Bridge Replacement (Bridge No. 210.8), Known as Federal Aid Project No. STBG-0053-0Lee4 EA$3,750$4,0258
Aug 25, 2026Mill & Overlay approximately 11 miles of US 61 from 0.5 miles North of US 80/SR27 IntersecWarren4 EA$3,886$3,8863
Jul 28, 2026Bridge Repair on MS 4 over Tenn-Tom Waterway (Bridge No. 158.5)Tishomingo4 EA$4,500$4,4238
Jun 23, 2026Overlay and OGFC Lift from east of the Shorecrest Road Overpass to approximately 0.9 mile Harrison19 EA$4,460$4,4802
Jun 5, 2026Mill & Overlay approximately 10.1 miles of MS 178 from the Marshall County Line to the UniBenton8 EA$3,900$4,0423
Jun 5, 2026Mill & Overlay approximately 9 miles of US 84 Westbound Lanes from Collins to the Jones CoCovington4 EA$3,627$4,2503
May 27, 2026Widening of US 51 from Glenwild to North StreetGrenada1 EA$3,500$3,5882
May 27, 2026Bridge Replacement on SR 427 (Bridge No. 4.4) between SR 488 & SR 16Leake4 EA$3,325$3,2668

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.