The low bidder priced lime at a median $837 per ton over the last 12 months (1 contracts), up 104% from the year before and up 161% since 2020.
| Let | Contract | Quantity | Winning price | All bidders' median | Bidders |
|---|---|---|---|---|---|
| Oct 27, 2026 | Construction project, Madison CountyMadison | 1.6K TON | $837 | $916 | 3 |
| Sep 23, 2025 | Grade, Drain, Bridge & Pave 4 Lanes on SR 7 from CR 370 to 0.4 miles south of SR 6, known Lafayette | 2.2K TON | $416 | $416 | 3 |
| Mar 4, 2025 | Grade Bridge, Pave 2-Lane on SR 19 from 0.25 miles South of SR 492 to Tucker DriveNeshoba | 3.2K TON | $375 | $340 | 2 |
| Nov 7, 2024 | Bridge Replacement on SR 12 over the Sunflower River (Bridge No. 23.9)Humphreys, Washington | 125 TON | $410 | $409 | 4 |
| Jul 11, 2024 | Construction project, Madison CountyMadison | 988 TON | $440 | $433 | 3 |
| Apr 23, 2024 | Grade, Drain, Pave on SR 2 from existing SR 15 to SRTippah | 842 TON | $500 | $580 | 2 |
| Jan 24, 2024 | Construction project, Jackson CountyJackson | 2.9K TON | $350 | $400 | 2 |
| Nov 2, 2023 | Bridge Replacements & Bank Stabilization on US 98 at the Pearl River (Bridge Nos. 118.5A &Marion | 112 TON | $520 | $535 | 2 |
| Oct 24, 2023 | Construction project, Sunflower CountySunflower | 40 TON | $540 | $620 | 2 |
| Aug 1, 2023 | Construction project, Pontotoc CountyPontotoc | 1.6K TON | $340 | $342 | 2 |
| Nov 23, 2021 | Grade, Drain, Bridge & Pave 4-Lane for approximately 9 miles of the USWashington | 3.4K TON | $362 | $381 | 2 |
| Aug 24, 2021 | Construction project, Jackson CountyJackson | 234 TON | $355 | – | 2 |
| Oct 27, 2020 | Construction project, Neshoba CountyNeshoba | 1.5K TON | $310 | $310 | 3 |
| Mar 24, 2020 | Construction project, Jackson CountyJackson | 492 TON | $330 | – | 3 |
| Feb 25, 2020 | Construction project, DeSoto CountyDeSoto | 303 TON | $300 | $318 | 3 |
| Feb 25, 2020 | Grade, Drain, Bridge, & Pave 4-Lane approximately 9 miles of APD Corridor "V" between FairItawamba | 3.2K TON | $330 | $326 | 3 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.