Temporary Traffic Stripe, Legend: Mississippi winning bid prices

The low bidder priced temporary traffic stripe, legend at a median $1.50 per linear foot over the last 12 months (72 contracts), down 25% from the year before and up 50% since 2020.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$1.50
72 contracts
Median, prior 12 months
$2.00
73 contracts
Median, 2020
$1.00
51 contracts
Winner vs. field
level with
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$0.5$1$1.5$2$2.52020202120222023202420252026*$1.55
Price vs. quantityEvery winning price since 2020 (log scale)
$0$1$2$3$41001.0K10K
Does quantity matter?Median winning price by quantity band
$0$0.5$1$1.5$2$1.70≤776$1.00776–1.8K$1.001.8K–3.7K$0.75>3.7K

The last 20 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Oct 27, 2026Overlay approximately 7 miles of MS 48 from SR 24 to Magnolia Progress RoadPike4.0K LF$0.53$0.533
Oct 27, 2026Mill & Overlay approximately 13.7 miles of I-59 from 0.5 miles north of the McNeil Exit toPearl River332 LF$0.60–1
Oct 27, 2026Mill & Overlay approximately 7.4 miles of I-55 from the Carroll County Line to 0.5 miles sGrenada, Carroll, Montgomery200 LF$2.75–1
Oct 27, 2026Construction project, Madison CountyMadison2.6K LF$2.10$1.173
Oct 27, 2026Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren1.5K LF$0.50$0.633
Oct 27, 2026Slide Improvement on US 84 from west of Fire Tower Road to east of Providence RoadFranklin246 LF$2.00$1.704
Oct 27, 2026Bridge Replacement on SR 28 between the Copiah County Line & Pinola (Bridge Nos. 72.7 & 73Simpson216 LF$1.18–1
Sep 29, 2026Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin12K LF$0.75$0.886
Sep 22, 2026Mill & Overlay approximately 2.5 miles of US 49 from SR 1 to the Isle of Capri ParkwayCoahoma360 LF$3.10–1
Sep 22, 2026Restricted crossing U-Turn (RCUT) on US 82 at Sturgis-Maben Road & Mill & Overlay approximOktibbeha619 LF$2.00–4
Sep 22, 2026Bridge Repair on US 82 over Bogue Phalia (Bridge No. 22.1B) & Bridge Repair on MS 438 overWashington192 LF$2.75$2.694
Sep 1, 2026Bridge Replacement on US 51 over unnamed Streams (Bridge Nos. 11.7 & 12.1) & between MagnoPike119 LF$2.10$2.103
Aug 25, 2026Overlay approximately 3.6 miles of MS 550 from SR 28 to the Lincoln County LineJefferson300 LF$1.52$1.664
Aug 25, 2026Overlay approximately 2.9 miles of MS 354 from the junction of MS 15 to the end of state mTippah1.7K LF$3.00$3.003
Aug 25, 2026Mill & Overlay approximately 0.5 miles East of US 61Washington500 LF$2.00–1
Aug 25, 2026Bridge Repair on SR 434 on Bridge No. 0.7 and Bridge Rehabilitation on SR 434 on Bridge NoSharkey144 LF$2.15$2.003
Aug 25, 2026Mill & Overlay approximately 11 miles of US 61 from 0.5 miles North of US 80/SR27 IntersecWarren4.0K LF$0.50$0.603
Aug 25, 2026US 49 over Big Sunflower River Tributary (Bridge No. 305.6)Coahoma192 LF$1.75$11.006
Jul 28, 2026Thin Lift Overlay approximately 10.2 miles of MS 467 from beginning of maintenance to SoutHinds2.0K LF$1.00$1.003
Jul 28, 2026Widening on I-10 at MS 605 WB RampHarrison176 LF$0.59$1.043

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.

Price this item against every competitor

BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.

Request access