BidCrew Data
BidCrew Data / Mississippi / Prices / Removal of Concrete Median & Island Pavement, All Depths
MDOT pay item · 202-B059

Removal of Concrete Median & Island Pavement, All Depths: Mississippi winning bid prices

The low bidder priced removal of concrete median & island pavement, all depths at a median $37.75 per square yard over the last 12 months (10 contracts), up 23% from the year before and up 9% since 2020.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$37.75
10 contracts
Median, prior 12 months
$30.60
9 contracts
Median, 2020
$34.54
2 contracts
Winner vs. field
5% below
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$0$20$40$60$802020202120222023202420252026*$40.50
Price vs. quantityEvery winning price since 2020 (log scale)
$0$20$40$60$801001.0K
Does quantity matter?Median winning price by quantity band
$0$10$20$30$40$50$43.20≤152$25.00152–372$20.00372–718$25.00>718

The last 20 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Oct 27, 2026Construction project, Madison CountyMadison471 SY$44.85$30.003
Sep 29, 2026Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin3.3K SY$40.50$31.006
Sep 22, 2026Restricted crossing U-Turn (RCUT) on US 82 at Sturgis-Maben Road & Mill & Overlay approximOktibbeha338 SY$35.00–4
Sep 1, 2026Bridge Replacement on US 51 over unnamed Streams (Bridge Nos. 11.7 & 12.1) & between MagnoPike28 SY$47.50$47.503
Jul 28, 2026Intersection Improvements on MS 42 from I-59 to Sunrise RoadForrest154 SY$24.00$24.003
Jul 28, 2026Traffic Signal and Interchange Modifications on US 45 & US 278Lee283 SY$100$38.005
Jun 23, 2026Roundabout on US 51 at Green T RoadDeSoto262 SY$20.00$25.006
May 27, 2026Intersection Improvements on US 45 from Misso Road to Magnolia Drive, and Mill & Overlay aNoxubee542 SY$50.00$51.252
Apr 28, 2026Restricted Crossing U-Turn (RCUT) on US 278 at CR 217/405Lafayette510 SY$10.00$20.005
Nov 25, 2025Safety Improvements on US 84 at MS 184 & at MS 588 in CollinsCovington772 SY$21.20$20.154
Sep 23, 2025Grade, Drain, Bridge & Pave 4 Lanes on SR 7 from CR 370 to 0.4 miles south of SR 6, known Lafayette660 SY$20.00$25.003
Jul 31, 2025Safety Improvements on MS 67 from US 49 to the I-10 "Superstreets" CorridorHarrison700 SY$40.00$42.503
Jul 22, 2025Mill & Overlay approximately 3 miles of US 98 from 400 feet west of Weathersby Drive to thLamar, Forrest34 SY$43.95$40.982
Apr 1, 2025Roundabout Construction on SR 15 at SR 16 & Bridge Replacements on Weyerhaeuser Street oveNeshoba809 SY$30.00$31.652
Mar 25, 2025Concrete Pavement Rehabilitation on approximately 2.3 miles of US 82 through IndianolaSunflower145 SY$43.20$43.203
Mar 4, 2025Grade Bridge, Pave 2-Lane on SR 19 from 0.25 miles South of SR 492 to Tucker DriveNeshoba206 SY$35.00$23.002
Feb 25, 2025Safety Improvements on US 49 from the crossover past US 49 at the SR 13 interchange to 100Simpson443 SY$19.50$19.505
Feb 4, 2025Roundabout Construction on SR 15 at SR 16 & Bridge Replacements on Weyerhaeuser Street oveNeshoba809 SY$30.60–1
Nov 26, 2024Roundabout Improvements on Old Brandon Road at Airport Road, International Drive, & SR 475Rankin824 SY$26.50$52.134
Oct 22, 2024Safety Improvements along US 49 from WSF Tatum Blvd. to Sims RoadForrest1.7K SY$38.75$46.882

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.

Price this item against every competitor

BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.

Request access