The low bidder priced removal of concrete median & island pavement, all depths at a median $37.75 per square yard over the last 12 months (10 contracts), up 23% from the year before and up 9% since 2020.
| Let | Contract | Quantity | Winning price | All bidders' median | Bidders |
|---|---|---|---|---|---|
| Oct 27, 2026 | Construction project, Madison CountyMadison | 471 SY | $44.85 | $30.00 | 3 |
| Sep 29, 2026 | Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin | 3.3K SY | $40.50 | $31.00 | 6 |
| Sep 22, 2026 | Restricted crossing U-Turn (RCUT) on US 82 at Sturgis-Maben Road & Mill & Overlay approximOktibbeha | 338 SY | $35.00 | – | 4 |
| Sep 1, 2026 | Bridge Replacement on US 51 over unnamed Streams (Bridge Nos. 11.7 & 12.1) & between MagnoPike | 28 SY | $47.50 | $47.50 | 3 |
| Jul 28, 2026 | Intersection Improvements on MS 42 from I-59 to Sunrise RoadForrest | 154 SY | $24.00 | $24.00 | 3 |
| Jul 28, 2026 | Traffic Signal and Interchange Modifications on US 45 & US 278Lee | 283 SY | $100 | $38.00 | 5 |
| Jun 23, 2026 | Roundabout on US 51 at Green T RoadDeSoto | 262 SY | $20.00 | $25.00 | 6 |
| May 27, 2026 | Intersection Improvements on US 45 from Misso Road to Magnolia Drive, and Mill & Overlay aNoxubee | 542 SY | $50.00 | $51.25 | 2 |
| Apr 28, 2026 | Restricted Crossing U-Turn (RCUT) on US 278 at CR 217/405Lafayette | 510 SY | $10.00 | $20.00 | 5 |
| Nov 25, 2025 | Safety Improvements on US 84 at MS 184 & at MS 588 in CollinsCovington | 772 SY | $21.20 | $20.15 | 4 |
| Sep 23, 2025 | Grade, Drain, Bridge & Pave 4 Lanes on SR 7 from CR 370 to 0.4 miles south of SR 6, known Lafayette | 660 SY | $20.00 | $25.00 | 3 |
| Jul 31, 2025 | Safety Improvements on MS 67 from US 49 to the I-10 "Superstreets" CorridorHarrison | 700 SY | $40.00 | $42.50 | 3 |
| Jul 22, 2025 | Mill & Overlay approximately 3 miles of US 98 from 400 feet west of Weathersby Drive to thLamar, Forrest | 34 SY | $43.95 | $40.98 | 2 |
| Apr 1, 2025 | Roundabout Construction on SR 15 at SR 16 & Bridge Replacements on Weyerhaeuser Street oveNeshoba | 809 SY | $30.00 | $31.65 | 2 |
| Mar 25, 2025 | Concrete Pavement Rehabilitation on approximately 2.3 miles of US 82 through IndianolaSunflower | 145 SY | $43.20 | $43.20 | 3 |
| Mar 4, 2025 | Grade Bridge, Pave 2-Lane on SR 19 from 0.25 miles South of SR 492 to Tucker DriveNeshoba | 206 SY | $35.00 | $23.00 | 2 |
| Feb 25, 2025 | Safety Improvements on US 49 from the crossover past US 49 at the SR 13 interchange to 100Simpson | 443 SY | $19.50 | $19.50 | 5 |
| Feb 4, 2025 | Roundabout Construction on SR 15 at SR 16 & Bridge Replacements on Weyerhaeuser Street oveNeshoba | 809 SY | $30.60 | – | 1 |
| Nov 26, 2024 | Roundabout Improvements on Old Brandon Road at Airport Road, International Drive, & SR 475Rankin | 824 SY | $26.50 | $52.13 | 4 |
| Oct 22, 2024 | Safety Improvements along US 49 from WSF Tatum Blvd. to Sims RoadForrest | 1.7K SY | $38.75 | $46.88 | 2 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.
BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.