The low bidder priced wattles, 20" at a median $9.28 per linear foot over the last 12 months (36 contracts), up 24% from the year before and up 37% since 2020.
| Let | Contract | Quantity | Winning price | All bidders' median | Bidders |
|---|---|---|---|---|---|
| Oct 27, 2026 | Mill & Overlay approximately 7.4 miles of I-55 from the Carroll County Line to 0.5 miles sGrenada, Carroll, Montgomery | 500 LF | $11.00 | – | 1 |
| Oct 27, 2026 | Construction project, Madison CountyMadison | 4.5K LF | $9.05 | $7.05 | 3 |
| Oct 27, 2026 | Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren | 1.5K LF | $20.00 | $12.00 | 3 |
| Oct 27, 2026 | Slide Improvement on US 84 from west of Fire Tower Road to east of Providence RoadFranklin | 1.0K LF | $6.00 | $8.20 | 4 |
| Oct 27, 2026 | Bridge Replacement on SR 28 between the Copiah County Line & Pinola (Bridge Nos. 72.7 & 73Simpson | 930 LF | $7.08 | – | 1 |
| Oct 27, 2026 | Mill & Overlay approximately 17 miles of I-22 beginning 1 mile west of the Landfill Road EMarshall | 300 LF | $15.40 | $12.70 | 4 |
| Sep 29, 2026 | Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin | 9.1K LF | $9.50 | $7.96 | 6 |
| Sep 22, 2026 | Bridge Removal on SR 373 (Bridge Nos. 9.9 & 10.3)Lowndes, Monroe | 3.3K LF | $5.50 | $6.00 | 6 |
| Sep 22, 2026 | Restricted crossing U-Turn (RCUT) on US 82 at Sturgis-Maben Road & Mill & Overlay approximOktibbeha | 418 LF | $10.00 | – | 4 |
| Sep 1, 2026 | Bridge Replacement on US 51 over unnamed Streams (Bridge Nos. 11.7 & 12.1) & between MagnoPike | 1.7K LF | $10.65 | $7.20 | 3 |
| Sep 1, 2026 | Bridge Replacements on SR 32 between Webb & Charleston (Bridge Nos. 45.6, 46.2 & 47.0)Tallahatchie | 1.6K LF | $6.00 | $6.49 | 6 |
| Aug 25, 2026 | Bridge Replacement on SR 486 (Bridge No. 1.0)Neshoba | 37 LF | $10.00 | $15.00 | 4 |
| Aug 25, 2026 | SR 145 Bridge Replacement (Bridge No. 210.8), Known as Federal Aid Project No. STBG-0053-0Lee | 400 LF | $6.50 | $8.00 | 8 |
| Aug 25, 2026 | Mill & Overlay approximately 11 miles of US 61 from 0.5 miles North of US 80/SR27 IntersecWarren | 200 LF | $10.44 | $12.50 | 3 |
| Aug 21, 2026 | Emergency Slope Repair & Pipe Cleanout on SR 26George, Perry | 150 LF | $12.00 | $13.25 | 3 |
| Jul 28, 2026 | Intersection Improvements on MS 42 from I-59 to Sunrise RoadForrest | 1.1K LF | $12.00 | $12.00 | 3 |
| Jul 28, 2026 | Bank Stabilization on SR 12 over Big Black River (Bridge No. 83.4)Holmes, Attala | 850 LF | $5.60 | $8.25 | 10 |
| Jul 28, 2026 | Widening on I-10 at MS 605 WB RampHarrison | 300 LF | $11.00 | $6.00 | 3 |
| Jul 28, 2026 | Traffic Signal and Interchange Modifications on US 45 & US 278Lee | 200 LF | $8.00 | $10.00 | 5 |
| Jun 23, 2026 | Roundabout on US 51 at Green T RoadDeSoto | 800 LF | $8.00 | $8.00 | 6 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.