BidCrew Data
BidCrew Data / Mississippi / Prices / Geotextile Stabilization, Type V, Non-Woven
MDOT pay item · 209-A005

Geotextile Stabilization, Type V, Non-Woven: Mississippi winning bid prices

The low bidder priced geotextile stabilization, type v, non-woven at a median $5.00 per square yard over the last 12 months (49 contracts), up 35% from the year before and up 100% since 2020.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$5.00
49 contracts
Median, prior 12 months
$3.70
29 contracts
Median, 2020
$2.50
22 contracts
Winner vs. field
2% below
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$2$4$6$82020202120222023202420252026*$5.00
Price vs. quantityEvery winning price since 2020 (log scale)
$0$5$10$15$201001.0K10K100K
Does quantity matter?Median winning price by quantity band
$0$2$4$6$5.00≤1.2K$3.501.2K–5.0K$3.105.0K–13K$3.00>13K

The last 20 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Oct 27, 2026Overlay approximately 7 miles of MS 48 from SR 24 to Magnolia Progress RoadPike901 SY$9.16$10.003
Oct 27, 2026Mill & Overlay approximately 7.4 miles of I-55 from the Carroll County Line to 0.5 miles sGrenada, Carroll, Montgomery4.6K SY$6.00–1
Oct 27, 2026Construction project, Madison CountyMadison280K SY$2.70$3.003
Oct 27, 2026Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren33K SY$5.25$5.253
Oct 27, 2026Slide Improvement on US 84 from west of Fire Tower Road to east of Providence RoadFranklin44K SY$3.00$3.004
Oct 27, 2026Bridge Replacement on SR 28 between the Copiah County Line & Pinola (Bridge Nos. 72.7 & 73Simpson15K SY$3.54–1
Oct 27, 2026Mill & Overlay approximately 17 miles of I-22 beginning 1 mile west of the Landfill Road EMarshall99 SY$10.30$10.004
Sep 29, 2026Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin194K SY$2.75$3.136
Sep 22, 2026Restricted crossing U-Turn (RCUT) on US 82 at Sturgis-Maben Road & Mill & Overlay approximOktibbeha18K SY$3.00–4
Sep 1, 2026Bridge Replacement on US 51 over unnamed Streams (Bridge Nos. 11.7 & 12.1) & between MagnoPike7.4K SY$3.15$3.153
Sep 1, 2026Bridge Replacements on SR 32 between Webb & Charleston (Bridge Nos. 45.6, 46.2 & 47.0)Tallahatchie27K SY$4.00$3.506
Aug 25, 2026Mill & Overlay approximately 0.5 miles East of US 61Washington141 SY$15.00–1
Aug 25, 2026Bridge Replacement on SR 486 (Bridge No. 1.0)Neshoba856 SY$5.00$4.134
Aug 25, 2026Bridge Repair on SR 434 on Bridge No. 0.7 and Bridge Rehabilitation on SR 434 on Bridge NoSharkey1.3K SY$5.00$5.003
Aug 25, 2026SR 145 Bridge Replacement (Bridge No. 210.8), Known as Federal Aid Project No. STBG-0053-0Lee1.9K SY$2.00$3.388
Aug 25, 2026Mill & Overlay approximately 11 miles of US 61 from 0.5 miles North of US 80/SR27 IntersecWarren1.1K SY$8.29$8.293
Jul 28, 2026Thin Lift Overlay approximately 10.2 miles of MS 467 from beginning of maintenance to SoutHinds1.3K SY$6.27$6.273
Jul 28, 2026Intersection Improvements on MS 42 from I-59 to Sunrise RoadForrest25K SY$4.65$3.203
Jul 28, 2026Widening on I-10 at MS 605 WB RampHarrison3.6K SY$5.00$3.503
Jul 28, 2026Bridge Repair on MS 4 over Tenn-Tom Waterway (Bridge No. 158.5)Tishomingo534 SY$5.00$5.008

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.

Price this item against every competitor

BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.

Request access