The low bidder priced bridge repair, endwall repair at a median $75.00 per linear foot over the last 12 months (33 contracts), down 50% from the year before and down 87% since 2020.
| Let | Contract | Quantity | Winning price | All bidders' median | Bidders |
|---|---|---|---|---|---|
| Oct 27, 2026 | Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren | 73 LF | $375 | $950 | 3 |
| Oct 27, 2026 | Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren | 94 LF | $230 | $230 | 3 |
| Oct 27, 2026 | Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren | 73 LF | $1,150 | $1,148 | 3 |
| Oct 27, 2026 | Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren | 488 LF | $28.25 | $28.25 | 3 |
| Sep 22, 2026 | Bridge Repair on SR 348 over Kings Creek (Bridge No. 0.9)Union | 3 LF | $2,000 | $2,000 | 6 |
| Sep 22, 2026 | Bridge Repair on SR 348 over Kings Creek (Bridge No. 0.9)Union | 36 LF | $461 | $695 | 6 |
| Sep 22, 2026 | Bridge Repair on SR 348 over Kings Creek (Bridge No. 0.9)Union | 3 LF | $2,500 | $2,500 | 6 |
| Aug 25, 2026 | Bridge Repair on SR 434 on Bridge No. 0.7 and Bridge Rehabilitation on SR 434 on Bridge NoSharkey | 480 LF | $33.00 | $35.00 | 3 |
| Aug 25, 2026 | US 49 over Big Sunflower River Tributary (Bridge No. 305.6)Coahoma | 300 LF | $40.00 | $52.50 | 6 |
| Jul 28, 2026 | Bridge Repair on US 98 over I-59 (Bridge No. 149.1)Lamar | 740 LF | $30.00 | $63.88 | 4 |
| Jul 28, 2026 | Bridge Repair on MS 4 over Tenn-Tom Waterway (Bridge No. 158.5)Tishomingo | 81 LF | $75.00 | $15.00 | 8 |
| Jul 28, 2026 | Bridge Repair on MS 4 over Tenn-Tom Waterway (Bridge No. 158.5)Tishomingo | 3.8K LF | $25.00 | $20.25 | 8 |
| Jun 30, 2026 | Thin Lift Overlay approximately 10.1 miles of MS 35 from 4 Forks to the Grenada County LinCarroll | 520 LF | $308 | $345 | 3 |
| May 27, 2026 | Bridge Preventive Maintenance on I-55 (Bridge Nos. 237.3A & 237.3B) over Hentz RoadPanola | 112 LF | $540 | $660 | 5 |
| May 27, 2026 | Bridge Repair on I-55 over Star Landing Road (Bridge Nos. 285.9A & 285.9B)DeSoto | 640 LF | $254 | $265 | 7 |
| Apr 28, 2026 | OGFC Lift approximately 5.3 miles on I-20 from MS 18 to US 80 (East Brandon)Rankin | 80 LF | $630 | $630 | 3 |
| Apr 10, 2026 | Pavement Restoration on US 49 from Madison County Line to 0.8 miles North of Old Highway 4Yazoo | 1.5K LF | $32.32 | $33.85 | 3 |
| Nov 25, 2025 | Bridge Repairs on Mt. Alban Road & Brabston Road over I-20 (Bridge Nos. 7.2A, 7.2B, & 12.7Warren | 48 LF | $58.50 | $17.00 | 5 |
| Nov 25, 2025 | Bridge Repairs on Mt. Alban Road & Brabston Road over I-20 (Bridge Nos. 7.2A, 7.2B, & 12.7Warren | 122 LF | $695 | $1,050 | 5 |
| Nov 25, 2025 | Bridge Repairs on Mt. Alban Road & Brabston Road over I-20 (Bridge Nos. 7.2A, 7.2B, & 12.7Warren | 1.2K LF | $13.25 | $30.00 | 5 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.
BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.