Guard Rail, Terminal End Section, Non-Flared: Mississippi winning bid prices

The low bidder priced guard rail, terminal end section, non-flared at a median $4,163 per each over the last 12 months (28 contracts), up 0% from the year before and up 46% since 2020.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$4,163
28 contracts
Median, prior 12 months
$4,145
9 contracts
Median, 2020
$2,850
8 contracts
Winner vs. field
level with
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$2,500$3,000$3,500$4,000$4,500$5,0002020202120222023202420252026*$4,170
Price vs. quantityEvery winning price since 2020 (log scale)
$2,000$3,000$4,000$5,000$6,000110
Does quantity matter?Median winning price by quantity band
$0$1,000$2,000$3,000$4,000$5,000$3,900≤2$4,0002–4$4,0254–12$3,660>12

The last 20 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Oct 27, 2026Overlay approximately 7 miles of MS 48 from SR 24 to Magnolia Progress RoadPike2 EA$4,149$4,1213
Oct 27, 2026Mill & Overlay approximately 13.7 miles of I-59 from 0.5 miles north of the McNeil Exit toPearl River24 EA$4,500–1
Oct 27, 2026Mill & Overlay approximately 7.4 miles of I-55 from the Carroll County Line to 0.5 miles sGrenada, Carroll, Montgomery18 EA$4,157–1
Oct 27, 2026Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren11 EA$4,335$4,3353
Oct 27, 2026Mill & Overlay approximately 17 miles of I-22 beginning 1 mile west of the Landfill Road EMarshall9 EA$4,029$3,7254
Sep 29, 2026Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin2 EA$4,349$4,3056
Sep 22, 2026Remove OGFC & Replace with Micro-Surface on I-55 for approximately 14.1 miles from approxiDeSoto, Tate3 EA$4,410$4,5103
Sep 22, 2026Bridge Repair on US 45 over Norfolk Southern Railroad (Bridge Nos. 275.6A & 275.6B)Alcorn2 EA$4,120$4,0007
Sep 1, 2026Bridge Replacement on US 51 over unnamed Streams (Bridge Nos. 11.7 & 12.1) & between MagnoPike8 EA$4,218$4,5003
Aug 25, 2026Mill & Overlay approximately 0.5 miles East of US 61Washington3 EA$4,093–1
Aug 25, 2026Bridge Replacement on SR 486 (Bridge No. 1.0)Neshoba4 EA$4,500$4,4004
Jun 23, 2026Overlay and OGFC Lift from east of the Shorecrest Road Overpass to approximately 0.9 mile Harrison10 EA$4,050$4,2752
Jun 23, 2026Thin Lift Overlay approximately 8.5 miles of SR 514 from SR 513 to SR 145, approximately 0Clarke, Jasper12 EA$4,765$4,2003
Jun 12, 2026Emergency Slide Repair on SR 178 approximately 0.66 miles south of CR 121Union2 EA$5,500$6,2754
Jun 5, 2026Mill & Overlay approximately 9 miles of US 84 Westbound Lanes from Collins to the Jones CoCovington2 EA$3,368$3,9353
May 27, 2026Restricted Crossing U-Turn (RCUT) on US 84 at MS 33Franklin2 EA$3,800$4,2632
May 8, 2026Level & Overlay approximately 8.4 miles on SR 18 from Smith County Line to east of Bay SprJasper10 EA$4,170$3,8353
Apr 28, 2026Overlay approximately 11.2 miles on MS 550 from the Jefferson County Line to east of BouieLincoln2 EA$4,177$3,9503
Apr 28, 2026Overlay approximately 4.5 miles on MS 184 and MS 13 at Prentiss from US 84 to end of MS 18Jefferson Davis6 EA$4,200$4,0114
Apr 28, 2026Restricted Crossing U-Turn (RCUT) on US 278 at CR 217/405Lafayette1 EA$3,900$4,5005

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.

Price this item against every competitor

BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.

Request access