The low bidder priced castings at a median $6.55 per pound over the last 12 months (7 contracts), up 19% from the year before and up 33% since 2020.
| Let | Contract | Quantity | Winning price | All bidders' median | Bidders |
|---|---|---|---|---|---|
| Oct 27, 2026 | Construction project, Madison CountyMadison | 79 LBS | $6.55 | $6.55 | 3 |
| Oct 27, 2026 | Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren | 79 LBS | $5.50 | $11.00 | 3 |
| Sep 29, 2026 | Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin | 2.8K LBS | $3.50 | $4.57 | 6 |
| Jul 28, 2026 | Intersection Improvements on MS 42 from I-59 to Sunrise RoadForrest | 488 LBS | $7.25 | $8.00 | 3 |
| Jun 23, 2026 | Roundabout on US 51 at Green T RoadDeSoto | 1.3K LBS | $8.00 | $8.00 | 6 |
| May 27, 2026 | Restricted Crossing U-Turn (RCUT) on US 84 at MS 33Franklin | 244 LBS | $8.00 | $7.50 | 2 |
| Apr 28, 2026 | I-10 Jackson County Welcome CenterJackson | 79 LBS | $5.80 | $5.58 | 4 |
| Sep 23, 2025 | Grade, Drain, Bridge & Pave 4 Lanes on SR 7 from CR 370 to 0.4 miles south of SR 6, known Lafayette | 2.0K LBS | $6.00 | $6.00 | 3 |
| Sep 4, 2025 | Roundabout on I-55 at the Brookway Boulevard InterchangeLincoln | 1.3K LBS | $5.00 | $5.00 | 3 |
| Aug 26, 2025 | Copi Construction of Equipment Shed & Material Shed, and Lot Improvements in the Copiah CoCopiah | 1.4K LBS | $5.00 | $5.25 | 4 |
| Aug 26, 2025 | Mill & Overlay approximately 19.5 miles of US 49W from Ruleville to the Coahoma County LinSunflower | 500 LBS | $7.50 | $7.50 | 3 |
| Jul 31, 2025 | Safety Improvements on MS 67 from US 49 to the I-10 "Superstreets" CorridorHarrison | 1.6K LBS | $7.00 | $5.60 | 3 |
| Apr 1, 2025 | Mill & Overlay approximately 4 miles of SR 15 from Queen Street to north of Audubon DriveJones | 1.1K LBS | $11.00 | $8.50 | 3 |
| Apr 1, 2025 | Roundabout Construction on SR 15 at SR 16 & Bridge Replacements on Weyerhaeuser Street oveNeshoba | 474 LBS | $5.00 | $5.03 | 2 |
| Mar 25, 2025 | Concrete Pavement Rehabilitation on approximately 2.3 miles of US 82 through IndianolaSunflower | 1.5K LBS | $3.10 | $5.00 | 3 |
| Mar 4, 2025 | Grade Bridge, Pave 2-Lane on SR 19 from 0.25 miles South of SR 492 to Tucker DriveNeshoba | 488 LBS | $5.00 | $4.90 | 2 |
| Feb 25, 2025 | Safety Improvements on US 49 from the crossover past US 49 at the SR 13 interchange to 100Simpson | 1.2K LBS | $6.10 | $6.10 | 5 |
| Feb 4, 2025 | Roundabout Construction on SR 15 at SR 16 & Bridge Replacements on Weyerhaeuser Street oveNeshoba | 474 LBS | $3.45 | – | 1 |
| Jan 28, 2025 | Drainage Improvements on US 61 near BlakelyWarren | 866 LBS | $10.80 | – | 1 |
| Dec 5, 2024 | Interchange Reconstruction on I-20 at FlowersWarren | 976 LBS | $6.15 | $5.00 | 3 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.
BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.