BidCrew Data / Mississippi / Prices / Saw Cut, Full Depth
MDOT pay item · 503-C010

Saw Cut, Full Depth: Mississippi winning bid prices

The low bidder priced saw cut, full depth at a median $8.38 per linear foot over the last 12 months (80 contracts), up 1% from the year before and down 33% since 2020.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$8.38
80 contracts
Median, prior 12 months
$8.30
71 contracts
Median, 2020
$12.50
45 contracts
Winner vs. field
level with
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$0$5$10$15$20$252020202120222023202420252026*$8.25
Price vs. quantityEvery winning price since 2020 (log scale)
$0$20$40$60101001.0K10K100K
Does quantity matter?Median winning price by quantity band
$0$5$10$15$20$20.00≤266$12.00266–1.1K$10.001.1K–3.1K$7.78>3.1K

The last 20 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Oct 27, 2026Overlay approximately 7 miles of MS 48 from SR 24 to Magnolia Progress RoadPike583 LF$11.62$11.003
Oct 27, 2026OGFC Lift on I-59 from US 45 to approximately 0.248 miles north of the Russell InterchangeLauderdale1.7K LF$20.00–1
Oct 27, 2026Fog Seal approximately 6.2 miles of I-59 from 0.8 mile north of CR 39 to the Jasper/ClarkeJasper, Clarke11K LF$5.77$7.992
Oct 27, 2026Fog Seal approximately 5 miles of I-59 from the Forrest County Line to the Forrest County Lamar, Forrest1.4K LF$10.80–1
Oct 27, 2026Mill & Overlay approximately 13.7 miles of I-59 from 0.5 miles north of the McNeil Exit toPearl River16K LF$10.00–1
Oct 27, 2026Mill & Overlay approximately 7.4 miles of I-55 from the Carroll County Line to 0.5 miles sGrenada, Carroll, Montgomery2.7K LF$13.25–1
Oct 27, 2026Construction project, Madison CountyMadison41K LF$7.45$7.503
Oct 27, 2026Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren29K LF$10.25$10.003
Oct 27, 2026Slide Improvement on US 84 from west of Fire Tower Road to east of Providence RoadFranklin402 LF$8.50$12.284
Oct 27, 2026Mill & Overlay approximately 17 miles of I-22 beginning 1 mile west of the Landfill Road EMarshall7.8K LF$9.60$8.754
Sep 29, 2026Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin38K LF$8.00$8.726
Sep 22, 2026Bridge Repair on SR 532 over Stream (Bridge No. 13.5)Covington250 LF$48.45$49.236
Sep 22, 2026Remove OGFC & Replace with Micro-Surface on I-55 for approximately 14.1 miles from approxiDeSoto, Tate2.0K LF$9.45$9.683
Sep 22, 2026Restricted crossing U-Turn (RCUT) on US 82 at Sturgis-Maben Road & Mill & Overlay approximOktibbeha2.1K LF$12.00–4
Sep 1, 2026Bridge Replacement on US 51 over unnamed Streams (Bridge Nos. 11.7 & 12.1) & between MagnoPike329 LF$19.00$24.003
Sep 1, 2026Bridge Replacements on SR 32 between Webb & Charleston (Bridge Nos. 45.6, 46.2 & 47.0)Tallahatchie1.1K LF$10.00$11.756
Aug 25, 2026Overlay approximately 3.6 miles of MS 550 from SR 28 to the Lincoln County LineJefferson357 LF$1.00$9.254
Aug 25, 2026Mill & Overlay approximately 0.5 miles East of US 61Washington378 LF$27.00–1
Aug 25, 2026Bridge Repair on SR 434 on Bridge No. 0.7 and Bridge Rehabilitation on SR 434 on Bridge NoSharkey48 LF$56.00$50.003
Aug 25, 2026Mill & Overlay approximately 11 miles of US 61 from 0.5 miles North of US 80/SR27 IntersecWarren2.8K LF$14.84$14.843

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.