BidCrew Data
BidCrew Data / Mississippi / Prices / 19-mm, HT, Asphalt Pavement
MDOT pay item · 403-A004 / 907-403-A004

19-mm, HT, Asphalt Pavement: Mississippi winning bid prices

The low bidder priced 19-mm, ht, asphalt pavement at a median $187 per ton over the last 12 months (10 contracts), up 2% from the year before and up 38% since 2020.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$187
10 contracts
Median, prior 12 months
$184
6 contracts
Median, 2020
$136
10 contracts
Winner vs. field
1% below
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$50$100$150$200$250$3002020202120222023202420252026*$177
Price vs. quantityEvery winning price since 2020 (log scale)
$0$100$200$300$400101001.0K10K100K
Does quantity matter?Median winning price by quantity band
$0$50$100$150$200$250$209≤261$160261–966$154966–1.8K$144>1.8K

The last 20 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Oct 27, 2026Mill & Overlay approximately 7.4 miles of I-55 from the Carroll County Line to 0.5 miles sGrenada, Carroll, Montgomery377 TON$226–1
Oct 27, 2026Construction project, Madison CountyMadison36K TON$144$1443
Oct 27, 2026Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren4.2K TON$177$1853
Sep 22, 2026Restricted crossing U-Turn (RCUT) on US 82 at Sturgis-Maben Road & Mill & Overlay approximOktibbeha4.1K TON$162–4
Jul 28, 2026Traffic Signal and Interchange Modifications on US 45 & US 278Lee196 TON$275$2505
Apr 28, 2026Restricted Crossing U-Turn (RCUT) on US 278 at CR 217/405Lafayette1.1K TON$167$1675
Apr 10, 2026Mill & Overlay approximately 7 miles of US 82 from 1 mile east of Military Road to the AlaLowndes240 TON$200$1962
Nov 25, 2025Mill & Overlay approximately 10 miles on US 45A from the Chickasaw County Line to the Lee Monroe5.0K TON$198$1924
Nov 25, 2025Safety Improvements on US 84 at MS 184 & at MS 588 in CollinsCovington1.3K TON$125$1414
Oct 28, 2025Mill, Level & Overlay approximately 4 miles of US 49 from US 11 to beginning of divided seForrest20 TON$285$2482
Sep 4, 2025Roundabout on I-55 at the Brookway Boulevard InterchangeLincoln1.1K TON$183$1843
Jul 22, 2025Mill & Overlay approximately 3 miles on US 45A from the beginning of the 5-Lane section toClay400 TON$191$1912
Apr 1, 2025Mill & Overlay approximately 4 miles of SR 15 from Queen Street to north of Audubon DriveJones200 TON$185$2133
Feb 25, 2025Safety Improvements on US 49 from the crossover past US 49 at the SR 13 interchange to 100Simpson2.5K TON$162$1625
Feb 25, 2025Mill & Overlay approximately 14 miles of US 72 from the Tippah County Line to SR 2Alcorn210 TON$155$2003
Dec 5, 2024Interchange Reconstruction on I-20 at FlowersWarren2.7K TON$189$1893
Oct 22, 2024Bridge Repair on I-20 over the Big Black River & Reliefs (Bridge Nos. 17.3A, 17.3B, 17.7A,Hinds, Warren1.7K TON$172$2122
Jun 25, 2024Intersection Improvements on USRankin420 TON$415$3682
Mar 26, 2024Pavement Restoration of approximately 5 miles of I-55 from SR 24 to US 98 & Roundabout ConPike44K TON$130$1302
Jan 31, 2024Intersection Improvements on USDeSoto240 TON$225$2104

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.