The low bidder priced 19-mm, ht, asphalt pavement at a median $187 per ton over the last 12 months (10 contracts), up 2% from the year before and up 38% since 2020.
| Let | Contract | Quantity | Winning price | All bidders' median | Bidders |
|---|---|---|---|---|---|
| Oct 27, 2026 | Mill & Overlay approximately 7.4 miles of I-55 from the Carroll County Line to 0.5 miles sGrenada, Carroll, Montgomery | 377 TON | $226 | – | 1 |
| Oct 27, 2026 | Construction project, Madison CountyMadison | 36K TON | $144 | $144 | 3 |
| Oct 27, 2026 | Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren | 4.2K TON | $177 | $185 | 3 |
| Sep 22, 2026 | Restricted crossing U-Turn (RCUT) on US 82 at Sturgis-Maben Road & Mill & Overlay approximOktibbeha | 4.1K TON | $162 | – | 4 |
| Jul 28, 2026 | Traffic Signal and Interchange Modifications on US 45 & US 278Lee | 196 TON | $275 | $250 | 5 |
| Apr 28, 2026 | Restricted Crossing U-Turn (RCUT) on US 278 at CR 217/405Lafayette | 1.1K TON | $167 | $167 | 5 |
| Apr 10, 2026 | Mill & Overlay approximately 7 miles of US 82 from 1 mile east of Military Road to the AlaLowndes | 240 TON | $200 | $196 | 2 |
| Nov 25, 2025 | Mill & Overlay approximately 10 miles on US 45A from the Chickasaw County Line to the Lee Monroe | 5.0K TON | $198 | $192 | 4 |
| Nov 25, 2025 | Safety Improvements on US 84 at MS 184 & at MS 588 in CollinsCovington | 1.3K TON | $125 | $141 | 4 |
| Oct 28, 2025 | Mill, Level & Overlay approximately 4 miles of US 49 from US 11 to beginning of divided seForrest | 20 TON | $285 | $248 | 2 |
| Sep 4, 2025 | Roundabout on I-55 at the Brookway Boulevard InterchangeLincoln | 1.1K TON | $183 | $184 | 3 |
| Jul 22, 2025 | Mill & Overlay approximately 3 miles on US 45A from the beginning of the 5-Lane section toClay | 400 TON | $191 | $191 | 2 |
| Apr 1, 2025 | Mill & Overlay approximately 4 miles of SR 15 from Queen Street to north of Audubon DriveJones | 200 TON | $185 | $213 | 3 |
| Feb 25, 2025 | Safety Improvements on US 49 from the crossover past US 49 at the SR 13 interchange to 100Simpson | 2.5K TON | $162 | $162 | 5 |
| Feb 25, 2025 | Mill & Overlay approximately 14 miles of US 72 from the Tippah County Line to SR 2Alcorn | 210 TON | $155 | $200 | 3 |
| Dec 5, 2024 | Interchange Reconstruction on I-20 at FlowersWarren | 2.7K TON | $189 | $189 | 3 |
| Oct 22, 2024 | Bridge Repair on I-20 over the Big Black River & Reliefs (Bridge Nos. 17.3A, 17.3B, 17.7A,Hinds, Warren | 1.7K TON | $172 | $212 | 2 |
| Jun 25, 2024 | Intersection Improvements on USRankin | 420 TON | $415 | $368 | 2 |
| Mar 26, 2024 | Pavement Restoration of approximately 5 miles of I-55 from SR 24 to US 98 & Roundabout ConPike | 44K TON | $130 | $130 | 2 |
| Jan 31, 2024 | Intersection Improvements on USDeSoto | 240 TON | $225 | $210 | 4 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.