The low bidder priced 29" x 18" concrete arch pipe, class a iii at a median $142 per linear foot over the last 12 months (1 contracts), up 12% from the year before and up 67% since 2020.
| Let | Contract | Quantity | Winning price | All bidders' median | Bidders |
|---|---|---|---|---|---|
| Oct 27, 2026 | Construction project, Madison CountyMadison | 104 LF | $142 | $150 | 3 |
| Sep 23, 2025 | Grade, Drain, Bridge & Pave 4 Lanes on SR 7 from CR 370 to 0.4 miles south of SR 6, known Lafayette | 32 LF | $105 | $109 | 3 |
| Jun 26, 2025 | Bridge Replacements on US 80 between Chunky & Meehan (Bridge Nos. 123.1, 123.3, 123.5 & 12Lauderdale, Madison, Newton | 104 LF | $128 | $128 | 3 |
| Jan 28, 2025 | Bridge Replacement on SR 14 over Hashuqua Creek (Bridge No. 156.5)Noxubee | 40 LF | $125 | $128 | 5 |
| Jan 28, 2025 | Drainage Improvements on US 61 near BlakelyWarren | 156 LF | $156 | – | 1 |
| Dec 5, 2024 | Interchange Reconstruction on I-20 at FlowersWarren | 136 LF | $113 | $150 | 3 |
| Nov 7, 2024 | Bridge Replacement on SR 12 over the Sunflower River (Bridge No. 23.9)Humphreys, Washington | 56 LF | $145 | $135 | 4 |
| Oct 22, 2024 | Bridge Replacements on SR 346 over Mud Creek & Ditch (Bridge Nos. 3.6 & 3.8)Pontotoc | 48 LF | $100 | $105 | 4 |
| Apr 23, 2024 | Grade, Drain, Pave on SR 2 from existing SR 15 to SRTippah | 1.1K LF | $115 | $108 | 2 |
| Jan 24, 2024 | Intersection Improvements at SRSmith | 456 LF | $113 | $132 | 5 |
| Jan 24, 2024 | Construction project, Jackson CountyJackson | 88 LF | $118 | $124 | 2 |
| Aug 22, 2023 | Intersection Improvements on USMadison | 64 LF | $60.00 | $140 | 3 |
| Aug 1, 2023 | Construction project, Pontotoc CountyPontotoc | 120 LF | $114 | $115 | 2 |
| Feb 23, 2022 | Bridge Replacement on SRHinds | 80 LF | $143 | $127 | 2 |
| Sep 28, 2021 | Construction project, Lauderdale CountyLauderdale | 40 LF | $81.00 | $82.05 | 6 |
| Apr 27, 2021 | Bridge Replacement on SRMarshall | 64 LF | $68.00 | – | 2 |
| Oct 27, 2020 | Construction project, Neshoba CountyNeshoba | 496 LF | $85.00 | $85.00 | 3 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.
BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.