BidCrew Data
BidCrew Data / Mississippi / Prices / Excess Excavation, LVM, AH
MDOT pay item · 203-G002

Excess Excavation, LVM, AH: Mississippi winning bid prices

The low bidder priced excess excavation, lvm, ah at a median $25.13 per cubic yard over the last 12 months (30 contracts), down 28% from the year before and up 79% since 2020.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$25.13
30 contracts
Median, prior 12 months
$34.88
20 contracts
Median, 2020
$14.00
23 contracts
Winner vs. field
0% below
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$0$20$40$60$802020202120222023202420252026*$25.00
Price vs. quantityEvery winning price since 2020 (log scale)
$0$50$100$150$200101001.0K10K
Does quantity matter?Median winning price by quantity band
$0$10$20$30$40$34.20≤66$28.2566–170$32.00170–500$16.50>500

The last 20 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Oct 27, 2026Overlay approximately 7 miles of MS 48 from SR 24 to Magnolia Progress RoadPike162 CY$26.46$26.463
Oct 27, 2026OGFC Lift on I-59 from US 45 to approximately 0.248 miles north of the Russell InterchangeLauderdale25 CY$10.00–1
Oct 27, 2026Mill & Overlay approximately 17 miles of I-22 beginning 1 mile west of the Landfill Road EMarshall65 CY$25.70$65.004
Aug 25, 2026Overlay approximately 3.6 miles of MS 550 from SR 28 to the Lincoln County LineJefferson15 CY$25.00$72.504
Aug 25, 2026Mill & Overlay approximately 0.5 miles East of US 61Washington15 CY$5.00–1
Aug 25, 2026Bridge Replacement on SR 486 (Bridge No. 1.0)Neshoba414 CY$25.00$30.804
Aug 25, 2026Bridge Repair on SR 434 on Bridge No. 0.7 and Bridge Rehabilitation on SR 434 on Bridge NoSharkey18 CY$150$1003
Jul 28, 2026Bridge Repair on MS 4 over Tenn-Tom Waterway (Bridge No. 158.5)Tishomingo116 CY$75.00$65.008
Jun 23, 2026Overlay approximately 8.5 miles of MS 587 from the Marion County Line to the Northern ErviLawrence271 CY$25.25$28.134
Jun 12, 2026Emergency Slide Repair on SR 178 approximately 0.66 miles south of CR 121Union700 CY$58.55$61.774
Jun 5, 2026Mill & Overlay approximately 9 miles of US 84 Westbound Lanes from Collins to the Jones CoCovington62 CY$51.81$58.253
May 27, 2026Overlay approximately 11.4 miles of SR 15 from Ovett-Scarbrough Road to south of Tuckers CJones13 CY$50.00$33.002
May 27, 2026Restricted Crossing U-Turn (RCUT) on US 84 at MS 33Franklin2.0K CY$10.00$12.252
May 8, 2026Seal & Overlay approximately 16 miles of MS 501 from SR 18 to the Scott County LineSmith64 CY$5.00$5.214
May 8, 2026Level & Overlay approximately 8.4 miles on SR 18 from Smith County Line to east of Bay SprJasper100 CY$16.00$16.003
Apr 28, 2026Overlay approximately 11.2 miles on MS 550 from the Jefferson County Line to east of BouieLincoln697 CY$21.97$22.003
Apr 28, 2026Ultra-Thin Overlay & Safety Improvements on approximately 8 miles of existing SR 482 from Neshoba100 CY$5.00$3.524
Apr 28, 2026Overlay approximately 4.5 miles on MS 184 and MS 13 at Prentiss from US 84 to end of MS 18Jefferson Davis42 CY$13.00$24.004
Apr 28, 2026OGFC Lift on I-55 from the Mississippi State Line to MS 568Pike688 CY$5.29$5.142
Apr 28, 2026OGFC Lift approximately 5.3 miles on I-20 from MS 18 to US 80 (East Brandon)Rankin241 CY$2.00$2.003

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.

Price this item against every competitor

BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.

Request access