Traffic Signal Conduit, Underground Drilled or Jacked, Rolled Pipe, 3": Mississippi winning bid prices

The low bidder priced traffic signal conduit, underground drilled or jacked, rolled pipe, 3" at a median $19.00 per linear foot over the last 12 months (5 contracts), down 42% from the year before and up 58% since 2020.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$19.00
5 contracts
Median, prior 12 months
$33.00
5 contracts
Median, 2020
$12.00
1 contracts
Winner vs. field
0% below
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$10$20$30$402020202120222023202420252026*$19.00
Price vs. quantityEvery winning price since 2020 (log scale)
$10$20$30$40$501001.0K
Does quantity matter?Median winning price by quantity band
$0$10$20$30$40$33.67≤268$20.65268–488$19.00488–1.0K$18.10>1.0K

The last 20 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Oct 27, 2026Construction project, Madison CountyMadison670 LF$20.25$22.503
Sep 29, 2026Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin2.5K LF$13.50$13.756
Jul 28, 2026Intersection Improvements on MS 42 from I-59 to Sunrise RoadForrest75 LF$30.00$30.003
Jul 28, 2026Traffic Signal and Interchange Modifications on US 45 & US 278Lee290 LF$17.00$21.255
May 27, 2026Intersection Improvements on US 45 from Misso Road to Magnolia Drive, and Mill & Overlay aNoxubee640 LF$19.00$19.002
Sep 23, 2025Grade, Drain, Bridge & Pave 4 Lanes on SR 7 from CR 370 to 0.4 miles south of SR 6, known Lafayette1.1K LF$16.00$16.003
Jul 31, 2025Safety Improvements on MS 67 from US 49 to the I-10 "Superstreets" CorridorHarrison3.4K LF$23.00$23.003
Jun 24, 2025Directional Median Installation on US 49 at Siloam Road and a Traffic Signal at SR 149Simpson260 LF$33.00$26.502
Apr 22, 2025Intersection Improvements on US 49 from Desoto Park Road to 500' south of East Wortham RoaHarrison104 LF$35.00$35.002
Nov 26, 2024Intersection Improvements on US 49 at SR 35Covington190 LF$38.85$36.353
Sep 25, 2024Construction project, Pontotoc CountyPontotoc187 LF$44.00–1
Jul 11, 2024Construction project, Madison CountyMadison235 LF$34.34$34.493
May 29, 2024Traffic Signal Installation on US 49W at SRSunflower200 LF$28.00$29.002
Jan 24, 2024Intersection Improvements at SRSmith350 LF$18.00$17.755
Jan 24, 2024Construction project, Harrison CountyHarrison1.1K LF$22.05–1
Dec 5, 2023Bridge Replacement on US 11 at Hobolochitto Creek in Picayune (Bridge No. 11.3), known as Pearl River75 LF$20.00$29.505
Dec 5, 2023Add 2 Lanes on US 49 from O'Neal Road to north of School Road, known as Federal Aid ProjecHarrison2.6K LF$20.96$19.982
Aug 22, 2023Intersection Improvements on USMadison342 LF$17.20$20.453
Aug 1, 2023Construction project, Pontotoc CountyPontotoc1.5K LF$10.00$10.002
Jan 25, 2023Construction project, Itawamba CountyItawamba1.0K LF$16.20$17.423

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.