BidCrew Data / Mississippi / Prices / Removal of Asphalt Paved Shoulders, All Depths
MDOT pay item · 202-B006

Removal of Asphalt Paved Shoulders, All Depths: Mississippi winning bid prices

The low bidder priced removal of asphalt paved shoulders, all depths at a median $25.91 per square yard over the last 12 months (35 contracts), up 59% from the year before and up 236% since 2020.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$25.91
35 contracts
Median, prior 12 months
$16.32
8 contracts
Median, 2020
$7.70
1 contracts
Winner vs. field
1% below
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$0$10$20$30$40$502020202120222023202420252026*$25.70
Price vs. quantityEvery winning price since 2020 (log scale)
$0$25$50$75$100$1251001.0K10K
Does quantity matter?Median winning price by quantity band
$0$10$20$30$40$36.65≤445$21.50445–1.2K$25.001.2K–4.4K$16.50>4.4K

The last 20 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Oct 27, 2026Overlay approximately 7 miles of MS 48 from SR 24 to Magnolia Progress RoadPike241 SY$105$1043
Oct 27, 2026Fog Seal approximately 6.2 miles of I-59 from 0.8 mile north of CR 39 to the Jasper/ClarkeJasper, Clarke5.1K SY$25.50$28.252
Oct 27, 2026Fog Seal approximately 5 miles of I-59 from the Forrest County Line to the Forrest County Lamar, Forrest936 SY$34.90–1
Oct 27, 2026Mill & Overlay approximately 13.7 miles of I-59 from 0.5 miles north of the McNeil Exit toPearl River7.2K SY$35.00–1
Oct 27, 2026Mill & Overlay approximately 7.4 miles of I-55 from the Carroll County Line to 0.5 miles sGrenada, Carroll, Montgomery145 SY$103–1
Oct 27, 2026Mill & Overlay approximately 17 miles of I-22 beginning 1 mile west of the Landfill Road EMarshall5.1K SY$40.50$38.754
Sep 29, 2026Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin19K SY$16.50$15.756
Sep 22, 2026Bridge Repair on SR 532 over Stream (Bridge No. 13.5)Covington84 SY$171$1696
Sep 22, 2026Remove OGFC & Replace with Micro-Surface on I-55 for approximately 14.1 miles from approxiDeSoto, Tate2.5K SY$40.95$41.853
Jul 28, 2026Thin Lift Overlay approximately 10.2 miles of MS 467 from beginning of maintenance to SoutHinds1.1K SY$33.44$33.443
Jul 28, 2026Micro-Surface approximately 14 miles of SR 512 & SR 513Clarke1.2K SY$14.65$56.592
Jul 28, 2026Intersection Improvements on MS 42 from I-59 to Sunrise RoadForrest1.0K SY$21.50$19.603
Jul 28, 2026Bridge Repair on MS 4 over Tenn-Tom Waterway (Bridge No. 158.5)Tishomingo534 SY$15.00$39.508
Jun 23, 2026Widen & Overlay approximately 2 miles of SR 26 from the east end of the Pearl River BridgePearl River975 SY$40.00–1
Jun 23, 2026Overlay and OGFC Lift from east of the Shorecrest Road Overpass to approximately 0.9 mile Harrison7.0K SY$29.35$29.682
Jun 23, 2026Thin Lift Overlay approximately 8.5 miles of SR 514 from SR 513 to SR 145, approximately 0Clarke, Jasper3.3K SY$19.00$34.203
Jun 5, 2026Mill & Overlay approximately 10.1 miles of MS 178 from the Marshall County Line to the UniBenton234 SY$37.00$37.003
Jun 5, 2026Mill & Overlay approximately 9 miles of US 84 Westbound Lanes from Collins to the Jones CoCovington749 SY$25.91$30.253
May 27, 2026Widening of US 51 from Glenwild to North StreetGrenada40 SY$50.00$51.252
May 27, 2026Traffic Signal Improvements on MS 16 at Van Buren, and Mill & Overlay approximately 6 mileLeake1.3K SY$25.00$25.454

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.