The low bidder priced super silt fence at a median $16.30 per linear foot over the last 12 months (8 contracts), down 3% from the year before and up 48% since 2020.
| Let | Contract | Quantity | Winning price | All bidders' median | Bidders |
|---|---|---|---|---|---|
| Oct 27, 2026 | Construction project, Madison CountyMadison | 2.6K LF | $16.40 | $17.62 | 3 |
| Oct 27, 2026 | Bridge Replacement on SR 28 between the Copiah County Line & Pinola (Bridge Nos. 72.7 & 73Simpson | 1.1K LF | $17.70 | – | 1 |
| Sep 29, 2026 | Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin | 400 LF | $16.50 | $18.20 | 6 |
| Aug 25, 2026 | Bridge Replacement on SR 486 (Bridge No. 1.0)Neshoba | 150 LF | $25.00 | $19.75 | 4 |
| Aug 25, 2026 | SR 145 Bridge Replacement (Bridge No. 210.8), Known as Federal Aid Project No. STBG-0053-0Lee | 400 LF | $15.00 | $19.10 | 8 |
| May 27, 2026 | Bridge Replacement on SR 427 (Bridge No. 4.4) between SR 488 & SR 16Leake | 550 LF | $15.30 | $16.40 | 8 |
| Nov 25, 2025 | Bridge Replacement on SR 481 between SR 902 & SR 35 (Bridge Nos. 2.1 & 2.3)Smith | 1.7K LF | $16.20 | $17.50 | 7 |
| Nov 25, 2025 | Bank Stabilization on SR 28 over Copiah Creek (Bridge No. 55.0)Copiah | 350 LF | $4.00 | $17.00 | 7 |
| Jun 26, 2025 | Bridge Replacements on US 80 between Chunky & Meehan (Bridge Nos. 123.1, 123.3, 123.5 & 12Lauderdale, Madison, Newton | 20K LF | $12.50 | $16.00 | 3 |
| Apr 1, 2025 | Roundabout Construction on SR 15 at SR 16 & Bridge Replacements on Weyerhaeuser Street oveNeshoba | 1.2K LF | $17.50 | $17.20 | 2 |
| Mar 25, 2025 | Bridge Replacement on Old Brandon Road (Bridge No. 48.6)Rankin | 211 LF | $19.25 | $22.00 | 3 |
| Mar 4, 2025 | Grade Bridge, Pave 2-Lane on SR 19 from 0.25 miles South of SR 492 to Tucker DriveNeshoba | 9.4K LF | $17.00 | $17.00 | 2 |
| Feb 4, 2025 | Roundabout Construction on SR 15 at SR 16 & Bridge Replacements on Weyerhaeuser Street oveNeshoba | 1.2K LF | $16.70 | – | 1 |
| Jan 28, 2025 | Bridge Preservation on SR 25 over Plummer Slough (Bridge No. 12.7)Rankin | 100 LF | $22.00 | – | 1 |
| Jan 28, 2025 | Bridge Replacement on SR 14 over Hashuqua Creek (Bridge No. 156.5)Noxubee | 1.6K LF | $12.00 | $16.35 | 5 |
| Nov 7, 2024 | Bridge Replacement on SR 12 over the Sunflower River (Bridge No. 23.9)Humphreys, Washington | 11K LF | $14.00 | $13.50 | 4 |
| Oct 22, 2024 | Bridge Replacement on SR 12 over Moccasin Creek (Bridge No. 69.2)Holmes | 500 LF | $20.00 | $16.75 | 4 |
| Jul 30, 2024 | Bridge Replacement on SRSunflower | 500 LF | $17.00 | $16.00 | 4 |
| Jul 30, 2024 | Pavement Restoration on approximately 11 miles of US 49 from 0.8 miles north of Old HighwaYazoo | 1.3K LF | $15.00 | $15.00 | 3 |
| Jul 24, 2024 | Construction project, Jefferson CountyJefferson | 270 LF | $31.44 | $20.50 | 4 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.
BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.