The low bidder priced structural steel angles & bars, 3 1/2" x 3 1/2" x 1/4" angles at a median $8.40 per pound over the last 12 months (3 contracts), up 68% from the year before and up 158% since 2020.
| Let | Contract | Quantity | Winning price | All bidders' median | Bidders |
|---|---|---|---|---|---|
| Oct 27, 2026 | Construction project, Madison CountyMadison | 63 LBS | $5.25 | $5.25 | 3 |
| Oct 27, 2026 | Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren | 119 LBS | $11.25 | $11.25 | 3 |
| Nov 25, 2025 | Safety Improvements on US 84 at MS 184 & at MS 588 in CollinsCovington | 51 LBS | $8.40 | $7.78 | 4 |
| Sep 23, 2025 | Grade, Drain, Bridge & Pave 4 Lanes on SR 7 from CR 370 to 0.4 miles south of SR 6, known Lafayette | 182 LBS | $6.75 | $6.75 | 3 |
| Feb 25, 2025 | Safety Improvements on US 49 from the crossover past US 49 at the SR 13 interchange to 100Simpson | 88 LBS | $5.00 | $5.00 | 5 |
| Dec 5, 2024 | Interchange Reconstruction on I-20 at FlowersWarren | 50 LBS | $4.50 | $4.50 | 3 |
| Oct 22, 2024 | Construction of a Roundabout on SR 3 at Willie Morris ParkwayYazoo | 125 LBS | $9.00 | – | 1 |
| Mar 26, 2024 | Pavement Restoration of approximately 5 miles of I-55 from SR 24 to US 98 & Roundabout ConPike | 526 LBS | $4.75 | $4.88 | 2 |
| Jan 24, 2024 | Construction project, Jackson CountyJackson | 544 LBS | $2.68 | $2.59 | 2 |
| Dec 5, 2023 | Widening of I-10 from Diamondhead to County Farm Road, Installation of ITS Components fromHancock, Harrison | 1.6K LBS | $5.00 | – | 1 |
| Dec 5, 2023 | Add 2 Lanes on US 49 from O'Neal Road to north of School Road, known as Federal Aid ProjecHarrison | 223 LBS | $4.44 | $4.22 | 2 |
| Nov 28, 2023 | Construction project, Jones CountyJones | 57 LBS | $4.30 | $4.40 | 4 |
| Oct 25, 2022 | Grade, Drain, Bridge & Pave 4-Lane approximately 9 miles of SR 57 from I-10 to Vancleave, Jackson | 724 LBS | $5.00 | $5.47 | 2 |
| Nov 23, 2021 | Grade, Drain, Bridge & Pave 4-Lane for approximately 9 miles of the USWashington | 90 LBS | $6.40 | $6.20 | 2 |
| Aug 24, 2021 | Construction of a Roundabout on SRMarshall | 110 LBS | $6.00 | $6.00 | 4 |
| Jul 27, 2021 | Pavement Restoration approximately 14 miles on I-59 from the Lamar County Line to the JoneForrest, Jones | 965 LBS | $6.00 | $6.10 | 2 |
| Jun 22, 2021 | Safety Improvements along SRTishomingo | 423 LBS | $5.00 | $5.41 | 5 |
| May 25, 2021 | Intersection Improvements on USWilkinson | 59 LBS | $4.55 | $4.78 | 2 |
| Jan 26, 2021 | Overlay approximatelyCarroll | 140 LBS | $5.25 | – | 1 |
| Mar 24, 2020 | Construction project, Jackson CountyJackson | 89 LBS | $4.00 | – | 3 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.
BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.