MDOT let 14 contracts worth $99.4M at the low bid, with 2.36 bidders per contract (the 12-month average is 3.70). Dunn Roadbuilders, LLC won the most, $66.8M; 8 firms won at least one contract. The closest finish: Construction project, Wilkinson County, decided by 1.1% ($16K). MDOT later rejected the bids on 1 more contract from this letting and re-let it.
| Call | Contract | Low bidder | Low bid | Second | Gap | Bidders | vs. estimate |
|---|---|---|---|---|---|---|---|
| 5 | Pavement Restoration approximately 14 miles on I-59 from the Lamar County Line to the Jones County Line & from the ForreForrest, Jones · Construction & widening · 107579301 | Dunn Roadbuilders, LLC2nd: T. L. Wallace Construction, Inc. | $66.8M | $79.8M | 19.5% | 2 | −16.3% |
| 14 | Mill & Overlay approximately 16 miles on SR 309 from SR 4 to USMarshall · Overlay & resurfacing · 108656301 | Lehman-Roberts Company | $6.2M | – | – | 1 | +2.4% |
| 3 | Overlay approximatelyAdams · Overlay & resurfacing · 108364301 | W. E. Blain & Sons, Inc. | $5.7M | – | – | 1 | +13.5% |
| 8 | Overlay approximatelyMonroe · Overlay & resurfacing · 108198301 | APAC - Mississippi, Inc.2nd: WG Construction Company, Inc. | $4.9M | $5.0M | 1.9% | 3 | +3.8% |
| 16 | Mill & Overlay approximately 9 miles on SR 22 from SR 463 to the Beginning of theMadison · Overlay & resurfacing · 307477301 | Dickerson & Bowen, Inc.2nd: APAC - Mississippi, Inc. | $4.8M | $5.0M | 4.4% | 2 | −0.2% |
| 9 | Overlay approximatelyClay · Overlay & resurfacing · 108647301 | APAC - Mississippi, Inc.2nd: Falcon Contracting Company, Inc. | $2.8M | $3.0M | 5.3% | 2 | +14.9% |
| 12 | Overlay approximately 12 miles on SR 433 from SR 3 to USYazoo · Overlay & resurfacing · 108669301 | Dickerson & Bowen, Inc.2nd: APAC - Mississippi, Inc. | $2.1M | $2.4M | 10.7% | 2 | −7.0% |
| 2 | Construction project, Wilkinson CountyWilkinson · Construction & widening · 107176301 | Midway Construction, Inc.2nd: T. L. Wallace Construction, Inc. | $1.5M | $1.5M | 1.1% | 3 | −23.8% |
| 11 | Overlay approximatelyCovington · Overlay & resurfacing · 108665301 | W. E. Blain & Sons, Inc. | $1.1M | – | – | 1 | +7.4% |
| 10 | Overlay project, Walthall CountyWalthall · Overlay & resurfacing · 108676301 | Dickerson & Bowen, Inc.2nd: Barriere Construction Company, LLC | $1.0M | $1.3M | 22.9% | 2 | +4.3% |
| 6 | Construction project, Pike CountyPike · Construction & widening · 108382302 | Dickerson & Bowen, Inc.2nd: Barriere Construction Company, LLC | $806K | $952K | 18.1% | 2 | +6.8% |
| 4 | Bridge Preservation on SR 278 over Weaver Creek (Bridge No. 12.0), SRMonroe, Pontotoc · Bridge repair & rehab · 108282301 | Key, LLC2nd: Phillips Contracting Co., Inc. | $769K | $979K | 27.4% | 5 | −29.8% |
| 7 | Construction project, Madison CountyMadison · Construction & widening · 108620305 | Key, LLC2nd: Century Construction Group, Inc. | $540K | $663K | 22.7% | 4 | +11.2% |
| 1 | Construction project, Harrison CountyHarrison · Construction & widening · 108763301 | RJM-McQueen Contracting, Inc.2nd: Landmark Contracting, Inc. | $412K | $430K | 4.4% | 3 | −2.8% |
| Call | Contract | Low bidder | Low bid | Bidders | vs. estimate | Re-let |
|---|---|---|---|---|---|---|
| 15 | Mill & Overlay approximately 0.6 miles on SR 8 from 0.25 miles north of the Calhoun City Limits to the Stop Bar at SRCalhoun · 306904301 | Lehman-Roberts Company | $1.3M | 1 | +27.8% | Nov 23, 2021 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew.
BidCrew tracks every DOT letting: line-item prices, competitor history, and a predicted low bid before you submit.