The low bidder priced granular material, crushed stone at a median $96.00 per ton over the last 12 months (31 contracts), up 10% from the year before and up 33% since 2020.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$96.00
31 contracts
Median, prior 12 months
$87.47
24 contracts
Median, 2020
$72.25
7 contracts
Winner vs. field
level with
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$60$80$100$120$1402020202120222023202420252026*$97.13
Price vs. quantityEvery winning price since 2020 (log scale)
$50$100$150$2001001.0K10K
Does quantity matter?Median winning price by quantity band
$0$25$50$75$100$125$113≤302$98.36302–1.6K$76.601.6K–5.0K$84.00>5.0K

The last 20 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Oct 27, 2026Construction project, Madison CountyMadison18K TON$90.85$97.893
Oct 27, 2026Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren5.4K TON$98.65$1093
Sep 29, 2026Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin33K TON$72.50$95.726
Sep 22, 2026Bridge Repair on SR 532 over Stream (Bridge No. 13.5)Covington50 TON$123$1216
Sep 22, 2026Restricted crossing U-Turn (RCUT) on US 82 at Sturgis-Maben Road & Mill & Overlay approximOktibbeha11K TON$58.00–4
Sep 22, 2026Bridge Repair on US 45 over Norfolk Southern Railroad (Bridge Nos. 275.6A & 275.6B)Alcorn49 TON$96.00$2107
Aug 25, 2026Overlay approximately 3.6 miles of MS 550 from SR 28 to the Lincoln County LineJefferson200 TON$175$1234
Aug 25, 2026Mill & Overlay approximately 0.5 miles East of US 61Washington300 TON$107–1
Aug 25, 2026Bridge Replacement on SR 486 (Bridge No. 1.0)Neshoba30 TON$150$96.654
Aug 25, 2026Bridge Repair on SR 434 on Bridge No. 0.7 and Bridge Rehabilitation on SR 434 on Bridge NoSharkey197 TON$155$1503
Aug 25, 2026Mill & Overlay approximately 11 miles of US 61 from 0.5 miles North of US 80/SR27 IntersecWarren5.5K TON$86.68$90.003
Jul 28, 2026Thin Lift Overlay approximately 10.2 miles of MS 467 from beginning of maintenance to SoutHinds225 TON$91.96$91.963
Jul 28, 2026Bridge Repair on MS 4 over Tenn-Tom Waterway (Bridge No. 158.5)Tishomingo89 TON$125$1088
Jul 28, 2026Traffic Signal and Interchange Modifications on US 45 & US 278Lee477 TON$55.00$81.005
Jun 23, 2026Bridge Repair on SR 22 over Persimmon Creek (Bridge No. 32.5)Madison22 TON$175$2007
May 27, 2026Bridge Replacement on SR 427 (Bridge No. 4.4) between SR 488 & SR 16Leake86 TON$76.35$96.008
May 27, 2026Traffic Signal Improvements on MS 16 at Van Buren, and Mill & Overlay approximately 6 mileLeake1.6K TON$125$1174
May 27, 2026Pavement Restoration of US 49 from the Hinds County Line to the Yazoo County Line, and ITSMadison, Hinds, Yazoo29K TON$84.97$85.984
May 27, 2026Intersection Improvements on US 45 from Misso Road to Magnolia Drive, and Mill & Overlay aNoxubee5.9K TON$62.50$64.062
May 8, 2026Seal & Overlay approximately 16 miles of MS 501 from SR 18 to the Scott County LineSmith11K TON$85.00$85.004

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.