The low bidder priced 30" reinforced concrete pipe, class iii at a median $129 per linear foot over the last 12 months (5 contracts), down 5% from the year before and up 65% since 2020.
| Let | Contract | Quantity | Winning price | All bidders' median | Bidders |
|---|---|---|---|---|---|
| Oct 27, 2026 | Construction project, Madison CountyMadison | 8 LF | $105 | $163 | 3 |
| Sep 29, 2026 | Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin | 24 LF | $129 | $127 | 6 |
| Sep 22, 2026 | Restricted crossing U-Turn (RCUT) on US 82 at Sturgis-Maben Road & Mill & Overlay approximOktibbeha | 96 LF | $160 | – | 4 |
| Sep 1, 2026 | Bridge Replacement on US 51 over unnamed Streams (Bridge Nos. 11.7 & 12.1) & between MagnoPike | 128 LF | $154 | $135 | 3 |
| Sep 1, 2026 | Bridge Replacements on SR 32 between Webb & Charleston (Bridge Nos. 45.6, 46.2 & 47.0)Tallahatchie | 120 LF | $100 | $109 | 6 |
| Sep 23, 2025 | Grade, Drain, Bridge & Pave 4 Lanes on SR 7 from CR 370 to 0.4 miles south of SR 6, known Lafayette | 380 LF | $105 | $108 | 3 |
| Sep 4, 2025 | Roundabout on I-55 at the Brookway Boulevard InterchangeLincoln | 24 LF | $117 | $150 | 3 |
| Jun 24, 2025 | Directional Median Installation on US 49 at Siloam Road and a Traffic Signal at SR 149Simpson | 56 LF | $140 | $145 | 2 |
| Apr 1, 2025 | Roundabout Construction on SR 15 at SR 16 & Bridge Replacements on Weyerhaeuser Street oveNeshoba | 184 LF | $105 | $107 | 2 |
| Mar 25, 2025 | Mill & Overlay approximately 7 miles of I-20 from 5.1 miles east of SR 15 to 2.3 miles easNewton | 48 LF | $400 | – | 1 |
| Mar 25, 2025 | Installation of Median Cable Barrier on I-22 from Coldwater River to the Marshall County LDeSoto, Marshall | 96 LF | $200 | $165 | 5 |
| Mar 4, 2025 | Grade Bridge, Pave 2-Lane on SR 19 from 0.25 miles South of SR 492 to Tucker DriveNeshoba | 1.3K LF | $135 | $112 | 2 |
| Feb 25, 2025 | Safety Improvements on US 49 from the crossover past US 49 at the SR 13 interchange to 100Simpson | 96 LF | $103 | $122 | 5 |
| Feb 4, 2025 | Roundabout Construction on SR 15 at SR 16 & Bridge Replacements on Weyerhaeuser Street oveNeshoba | 184 LF | $109 | – | 1 |
| Jan 28, 2025 | Drainage Improvements on US 61 near BlakelyWarren | 68 LF | $149 | – | 1 |
| Dec 5, 2024 | Interchange Reconstruction on I-20 at FlowersWarren | 8 LF | $117 | $187 | 3 |
| Nov 26, 2024 | Pearl River Installation of Median Cable Barrier & Bridge Pier Protection along I-59 from Clarke, Jasper | 4 LF | $195 | – | 1 |
| Nov 26, 2024 | Intersection Improvements on US 49 at SR 35Covington | 8 LF | $195 | $200 | 3 |
| Oct 22, 2024 | Safety Improvements on SR 25 at Longview RoadOktibbeha | 48 LF | $300 | $225 | 2 |
| Jul 11, 2024 | Construction project, Madison CountyMadison | 376 LF | $110 | $100 | 3 |
Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.
BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.