BidCrew Data
BidCrew Data / Mississippi / Prices / Thermoplastic Legend, White
MDOT pay item · 907-626-H010

Thermoplastic Legend, White: Mississippi winning bid prices

The low bidder priced thermoplastic legend, white at a median $6.00 per linear foot over the last 12 months (77 contracts), flat from the year before and down 11% since 2024.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$6.00
77 contracts
Median, prior 12 months
$6.00
28 contracts
Median, 2024
$6.75
22 contracts
Winner vs. field
level with
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$4$6$8$102020202120222023202420252026*$6.00
Price vs. quantityEvery winning price since 2020 (log scale)
$2.5$5$7.5$10$12.5$151001.0K10K
Does quantity matter?Median winning price by quantity band
$0$2$4$6$8$7.50≤762$6.00762–1.7K$5.421.7K–2.7K$5.78>2.7K

The last 20 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Oct 27, 2026Installation of Audible Stripe, Raised Pavement Markers and Sign Improvements on MS 336 frPontotoc780 LF$6.00–1
Oct 27, 2026Installation of Audible Stripe, Raised Pavement Markers and Sign Improvements on MS 363 frItawamba, Lee2.5K LF$6.00$6.002
Oct 27, 2026Overlay approximately 7 miles of MS 48 from SR 24 to Magnolia Progress RoadPike4.5K LF$10.59$10.503
Oct 27, 2026Fog Seal approximately 6.2 miles of I-59 from 0.8 mile north of CR 39 to the Jasper/ClarkeJasper, Clarke760 LF$5.00$5.652
Oct 27, 2026Mill & Overlay approximately 13.7 miles of I-59 from 0.5 miles north of the McNeil Exit toPearl River332 LF$6.00–1
Oct 27, 2026Mill & Overlay approximately 7.4 miles of I-55 from the Carroll County Line to 0.5 miles sGrenada, Carroll, Montgomery200 LF$5.25–1
Oct 27, 2026Construction project, Madison CountyMadison1.3K LF$13.15$15.253
Oct 27, 2026Mill & Overlay approximately 5.8 miles of I-20 from the Mississippi River Bridge to 0.65 mWarren769 LF$9.25$9.253
Oct 27, 2026Slide Improvement on US 84 from west of Fire Tower Road to east of Providence RoadFranklin643 LF$7.00$11.384
Oct 27, 2026Bridge Replacement on SR 28 between the Copiah County Line & Pinola (Bridge Nos. 72.7 & 73Simpson318 LF$14.16–1
Sep 29, 2026Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin5.8K LF$14.50$16.136
Sep 22, 2026Installation of Audible Thermoplastic Traffic Markings & Thermoplastic Pavement Markings oDeSoto, Panola, Tate16K LF$3.00$6.002
Sep 22, 2026Safety Improvements & Pavement Markings approximately 30.3 miles of MS 309 from Byhalia toMarshall5.8K LF$4.00$6.502
Sep 22, 2026Mill & Overlay approximately 2.5 miles of US 49 from SR 1 to the Isle of Capri ParkwayCoahoma97 LF$10.25–1
Sep 22, 2026Restricted crossing U-Turn (RCUT) on US 82 at Sturgis-Maben Road & Mill & Overlay approximOktibbeha1.6K LF$4.00–4
Sep 1, 2026Bridge Replacement on US 51 over unnamed Streams (Bridge Nos. 11.7 & 12.1) & between MagnoPike119 LF$9.90$10.803
Sep 1, 2026Bridge Replacements on SR 32 between Webb & Charleston (Bridge Nos. 45.6, 46.2 & 47.0)Tallahatchie277 LF$10.00$10.256
Aug 25, 2026Overlay approximately 3.6 miles of MS 550 from SR 28 to the Lincoln County LineJefferson425 LF$12.15$13.324
Aug 25, 2026Overlay approximately 2.9 miles of MS 354 from the junction of MS 15 to the end of state mTippah1.7K LF$8.00$8.003
Aug 25, 2026Mill & Overlay approximately 0.5 miles East of US 61Washington1.0K LF$4.00–1

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.

Price this item against every competitor

BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.

Request access