BidCrew Data
BidCrew Data / Mississippi / Prices / Flashing Arrow Panel, Type C
MDOT pay item · 619-E1001

Flashing Arrow Panel, Type C: Mississippi winning bid prices

The low bidder priced flashing arrow panel, type c at a median $4,091 per each over the last 12 months (7 contracts), up 54% from the year before and up 82% since 2020.

Data through the October 27, 2026 letting · Refreshed November 21, 2026

Median, last 12 months
$4,091
7 contracts
Median, prior 12 months
$2,650
8 contracts
Median, 2020
$2,250
3 contracts
Winner vs. field
level with
winning price vs. all bidders' median
Winning price by yearMedian and middle half of the low bidder's unit price
$1,000$2,000$3,000$4,000$5,0002020202120222023202420252026*$4,046
Price vs. quantityEvery winning price since 2020 (log scale)
$0$2,000$4,000$6,000110
Does quantity matter?Median winning price by quantity band
$0$1,000$2,000$3,000$1,785≤1$2,8001–2$0.0002–2$2,300>2

The last 20 winning prices

LetContractQuantityWinning priceAll bidders' medianBidders
Oct 27, 2026Slide Improvement on US 84 from west of Fire Tower Road to east of Providence RoadFranklin2 EA$5,247$4,5814
Sep 29, 2026Add 2 Lanes on SR 25 from Grants Ferry to SR 471, Ramp Improvements & Roundabouts on MS 47Rankin9 EA$4,091$4,0386
Sep 22, 2026Restricted crossing U-Turn (RCUT) on US 82 at Sturgis-Maben Road & Mill & Overlay approximOktibbeha2 EA$2,932–4
May 27, 2026Restricted Crossing U-Turn (RCUT) on US 84 at MS 33Franklin2 EA$5,830$4,1652
Apr 28, 2026Restricted Crossing U-Turn (RCUT) on US 278 at CR 217/405Lafayette6 EA$2,500$2,5005
Feb 3, 2026Slide Repair on US 61 Southbound across from Fire Tower RoadAdams1 EA$4,000$2,7504
Nov 25, 2025Safety Improvements on US 84 at MS 184 & at MS 588 in CollinsCovington4 EA$4,357$3,9524
Sep 23, 2025Grade, Drain, Bridge & Pave 4 Lanes on SR 7 from CR 370 to 0.4 miles south of SR 6, known Lafayette1 EA$4,000$4,0003
Sep 4, 2025Roundabout on I-55 at the Brookway Boulevard InterchangeLincoln2 EA$3,466$3,4663
Apr 1, 2025Roundabout Construction on SR 15 at SR 16 & Bridge Replacements on Weyerhaeuser Street oveNeshoba2 EA$2,800$3,0482
Mar 4, 2025Grade Bridge, Pave 2-Lane on SR 19 from 0.25 miles South of SR 492 to Tucker DriveNeshoba2 EA$2,500$2,5502
Feb 4, 2025Roundabout Construction on SR 15 at SR 16 & Bridge Replacements on Weyerhaeuser Street oveNeshoba2 EA$3,084–1
Dec 5, 2024Bridge Repair on 49th Avenue over I-59/I-20 (Bridge No. 150.8A)Lauderdale1 EA$1,700$2,1002
Dec 5, 2024Interchange Reconstruction on I-20 at FlowersWarren2 EA$2,360$2,3603
Nov 26, 2024Bridge Repair on US 278 (Bridge No. 121.7A)Lee1 EA$2,000$2,3284
Oct 22, 2024Safety Improvements on SR 25 at Longview RoadOktibbeha2 EA$5,000$3,2502
Oct 22, 2024Bridge Repair on I-20 over the Big Black River & Reliefs (Bridge Nos. 17.3A, 17.3B, 17.7A,Hinds, Warren2 EA$2,690$2,5652
Oct 10, 2024Emergency Slide Repair on US 80 in ForestScott1 EA$1,451$1,3252
Jul 30, 2024Pavement Restoration on approximately 11 miles of US 49 from 0.8 miles north of Old HighwaYazoo2 EA$2,564$2,5643
Jul 11, 2024Construction project, Hinds CountyHinds4 EA$1,610–1

Source: MDOT bid tabulations, January 2020 through the October 27, 2026 letting. Compiled and checked by BidCrew. Only bids whose line items add up to the bid total (within 2%) are used.

Price this item against every competitor

BidCrew shows each competitor's history on every MDOT pay item, line by line, before the letting.

Request access